CONCRETE PLACEMENT CHECKLIST
Department RFI No. CHECKLIST NO. C-001-0016
Description
KKS No. Drawing No. ITP NO. SEP-01-ZAA-1QA-002
Location
SN Description Results Remarks
1 Weather
2 Ambient °C
Temperature
3 Concrete °C
4 Rate of Placement
7 Curing Method
8 Quantity of Concrete
9 Type of Finish
10 Start Time
11 Finish Time
Note:
ORIGINATING SEPCOIII
ISSUED BY SEPCOIII Engineer OWNER
SUBCONTRACTOR QC
Signature
Name
Date
POST-POURING CONCRETE CHECKLIST
Department RFI No. CHECKLIST NO. C-001-017
Description
Location
1 Concrete Curing
Note:
ORIGINATING SEPCOIII
ISSUED BY SEPCOIII Engineer OWNER
SUBCONTRACTOR QC
Signature
Name
Date
FOUNDATION RELEASE RECORD CHECKLIST
Description
Location
SN Description Accepted Rejected N/A Remarks
1 Formwork removed
2 Elevation correct
10 Protective coating
Note:
ORIGINATING SEPCOII
ISSUED BY SEPCOIII Engineer OWNER
SUBCONTRACTOR I QC
Signature
Name
Date