This liquid penetrant inspection report summarizes an inspection of a new salt drier (equipment no. 120-NV-15) conducted by CEIL for Bharat Petroleum Corporation Ltd. The inspection found no recordable indications on the inside and outside of the knuckle area, straight face, and weld edge preparation, chordal long seam of the equipment. The non-destructive testing involved cleaning the surface, applying a penetrant, remover and developer, and inspecting under visible light. The test was found to be satisfactory with no issues detected.
This liquid penetrant inspection report summarizes an inspection of a new salt drier (equipment no. 120-NV-15) conducted by CEIL for Bharat Petroleum Corporation Ltd. The inspection found no recordable indications on the inside and outside of the knuckle area, straight face, and weld edge preparation, chordal long seam of the equipment. The non-destructive testing involved cleaning the surface, applying a penetrant, remover and developer, and inspecting under visible light. The test was found to be satisfactory with no issues detected.
This liquid penetrant inspection report summarizes an inspection of a new salt drier (equipment no. 120-NV-15) conducted by CEIL for Bharat Petroleum Corporation Ltd. The inspection found no recordable indications on the inside and outside of the knuckle area, straight face, and weld edge preparation, chordal long seam of the equipment. The non-destructive testing involved cleaning the surface, applying a penetrant, remover and developer, and inspecting under visible light. The test was found to be satisfactory with no issues detected.