The document is a log tracking the rehearsal process for a school play over several months. It documents audition dates in August, casting in late August, blocking and running rehearsals through September, technical rehearsals in early October, and two performances on October 12th and 13th. The log includes brief descriptions of activities and the total hours spent on each date, accumulating to over 100 hours by the final performance date.
The document is a log tracking the rehearsal process for a school play over several months. It documents audition dates in August, casting in late August, blocking and running rehearsals through September, technical rehearsals in early October, and two performances on October 12th and 13th. The log includes brief descriptions of activities and the total hours spent on each date, accumulating to over 100 hours by the final performance date.
The document is a log tracking the rehearsal process for a school play over several months. It documents audition dates in August, casting in late August, blocking and running rehearsals through September, technical rehearsals in early October, and two performances on October 12th and 13th. The log includes brief descriptions of activities and the total hours spent on each date, accumulating to over 100 hours by the final performance date.
show were I had each actor go up and audition for the parts they wanted.
08/22/17 Continued auditions. 1 2
08/23/17 Continued auditions. 1 3
08/24/17 Continued auditions. 1 4
08/25/17 Continued auditions. 1 5
08/28/17 Worked on casting the show 2 7
with Mrs. A
08/29/17 Did callbacks. Finished 2 9
casting the show with Mrs. A and posted the cast list.
08/31/17 Did a read through of the 2 11
show with the cast.
09/01/17 Started to block the show 1 12
with cast A.
09/05/17 Continued blocking the 1 13
show.
09/06/17 After school rehearsal with 5 18
the cast. Finished blocking the show with cast A. Gave notes.
09/07/17 Run through the blocking 2 20
with cast B. Gave notes.
09/08/17 Continued with running 1 21
through the show and fixing problems as they arose.
09/11/17 After school rehearsal with 5 26
the cast. Ran through the show with both casts. 09/12/17 Continued running through 1 27 the show and giving back feedback.
09/14/17 Continued running through 2 29
the show and giving feedback.
09/15/17 Continued running through 1 30
the show and giving feedback.
09/18/17 Continued running through 1 31
the show and giving feedback.
09/19/17 Continued running through 1 32
the show and giving feedback.
09/21/17 Continued running through 2 34
the show and giving feedback.
09/22/17 Continued running through 1 35
the show and giving feedback.
09/25/17 After school rehearsal with 5 40
the cast. Ran through the show with both casts.
09/26/17 Continued running through 1 41
the show and giving feedback.
09/28/17 Continued running through 2 43
the show and giving feedback.
09/29/17 Continued running through 1 44
the show and giving feedback.
10/02/17 Tech rehearsal were we ran 5 49
through the show and worked on any blocking or technical problems. 10/03/17 Tech rehearsal were we ran 5 54 through the show and worked on any blocking or technical problems.
10/04/17 Tech rehearsal were we ran 5 59
through the show and worked on any blocking or technical problems.
10/05/17 Tech rehearsal were we ran 5 64
through the show and worked on any blocking or technical problems.
10/06/17 Tech rehearsal were we ran 5 69
through the show and worked on any blocking or technical problems.
10/09/17 Tech rehearsal were we ran 5 74
through the show and worked on any blocking or technical problems.
10/10/17 Tech rehearsal were we ran 5 79
through the show and worked on any blocking or technical problems.
10/11/17 Tech rehearsal were we ran 5 84
through the show and worked on any blocking or technical problems.
10/12/17 Invitational were we 5 89
performed the show for the first time in front of an audience
10/13/17 The show opened to a full 7 96
house. I fixed any last minute problems.
10/14/17 The second day of the show 10 106
opening were I gave the actors quick notes and tweaked anything that proved to be a problem.