PROJECT: FIELD ERECTION OF 15000 BBLs TANK (IK-

2545)

Job Safety Analysis / Safe Work Method Statement-SWMS


Electric Wiring

JSA Date: Assessment Team: JSA NO:

PTW NO. PPE's Required:


Step

No: Hazard Description &


Description of Task Step Controls Measures Residual Risk Controls
Effect

1 Electric Wiring Electric shock (If energy Follow Permit to Work System and PPE Compliance. Display Safety Signs. Performance o
source is being used) Deployment of trained manpower and proper Hazard Analysis. Conduction
tools as required. Provision of Proper of tool box meeting before commencement of job.
Barrication of Area and house keeping. Proper Inspection of power tools (if
Proper grounding and ELCB to be installed in electricity applicable) and colour coding.
distribution boards.

Hand injury Proper tools shall be used for the job. Inspection of Display Safety Signs. Performance o
Hand tools shall be ensured. Hazard Analysis. Conduction
of tool box meeting before commencement of job.
Proper Inspection of power tools (if
applicable) and colour coding.

Controlled annd Confidential @ IKAN Engineering Services (Pvt.) Limited Page 1 Of 2


`

Risk Controls

Performance of
Conduction
ore commencement of job.
nspection of power tools (if
colour coding.

Performance of
Conduction
ore commencement of job.
nspection of power tools (if
colour coding.

Controlled annd Confidential @ IKAN Engineering Services (Pvt.) Limited Page 2 Of 2