[k.M Clause 42
I) d½ dsyksfufo }kjk eqfnzr fnYyh nj vuqlp w h
ds vk/kkj ij lhesUV vkSj fcVqeu dh vuqekuewy
ek=k fu/kkZfjr djus ds fy, vuqlpw h@fooj.k
I) (a) Schedule/statement for determining theoretical Delhi Schedule of Rates 2016 printed by
quantity of cement & bitumen on the basis of C.P.W.D. with correction slips issued
upto date of online receipt of tender.

II) vuqekuewyd ek=kvksa esa vuqeR; fopyu


Variations Permissible On Theoretical Quantities
d½ lhesUV ftu dk;ksZ ds fy, fufonk easa vuqekfur
ewY; :- 5 yk[k ls vf/kd u gks 3 izfr’kr tek@?kVk
a) Cement for works with estimated cost put 3% plus/minus.
To tender not more than Rs. 5 lakhs

ftu dk;ksZ ds fy, fufonk esa vuqekfur


ewY; :- 5 yk[k ls vf/kd gks 2 izfr’kr tek@?kVk
for works with estimated cost put to 2 % plus/minus.
Tender more than Rs. 5 lakhs

[-k½ fcVqeu lHkh dk;ksZ ds fy, 2.5 izfr’kr dsoy tek vkSj
?kVk ds i{k esa ’kwU;
b) Bitumen for all works 2.5% plus only &
nil on minus side.
Xk½ bLikr izR;sd O;kl] dksV vkSj Js.kh ds fy,
iwuoZyu vkSj lajpukRed bLikr dkV 2 izfr’kr tek@?kVk
15. Steel Reinforcement and structural steel
sections for each diameter, section and 2% plus/minus
category.

?k½ lHkh vU; lkefxz;ka 'kwU;


d) All other materials Nil.

vuqeR; fopyu ls vf/kd dh ek=kvksa ds fy, olwyh njsa


RECOVERY RATES FOR QUANTITIES BEYOND PERMISSIBLE VARIATION

Øe la- en fooj.k vadks vkSj “kCnksa esa og nj ftl


ij Bsdns kj ls olwyh dh tk,xh
S.No. Description of item Rate in figures and words at which recovery
shall be made from the contractor

Excess beyond Less use beyond


permissible variation the permissible variation

1. Cement Nil Rs. 5700/- Per M.T


2. Steel Reinforcement Nil Rs. 37300/- Per M.T

Correction = Nil, Insertion = Nil, Overwriting = Nil, Deletion = Nil, Sr. D/Man AE(P) EE