You are on page 1of 2

REJUVINATION PROGRAMME 2020 - 2021

TALUKA : JALALPOR DIST : NAVSARI


Name of Scheme : Ethan -1 Village Water Supply Scheme
Name of Work : Part I : RCC ESR of 25,000 x 12.00 Mtr. Height. 1 No.
Schedule showing the aproximate item wise quantity of work to be carried out on this
contract only.

Estimated Cost put to Tendor Rs. 691063.00 Time Limit : 6 Months


S C H E D U L E 'B'

QTY UNIT DESCRIPTION OF ITEM RATE PER AMOUNT

Part I : RCC ESR of 25,000 x 12.00 Mtr. Height. 1 No.

To be designed as per Seismic Zone 3


Designing structurally (and aesthetically) complying
provisions of relevant Indian standards and constructing
RCC of
List Elevated service reservoir
Indian Standards of the
for design following capacity
of ESR:
relevant Indian Standards
(1) I.S. 3370 part I to IV 1965 or latest revised
(2) IS 456-2000 or latest revised
(3) IS 11682- 1985 or latest revised
(4) IS 1893-2002 part I to V or latest revised
(5) IS 13920-1993, or latest revised
(6) IS 875 part I to III,1987 or latest revised
(7) IS 11089- 1987 or latest revised
General specifications:
(1) The Min. concrete grade for RCC shall be M :25.
ingredients shall be as per Mix design using weigh
(2) HYSD( Fe 415)or higher grade reinforcing bars
or CRS /TMT bars shall be used as per detailed
(3) Incase of column –brace trestle type staging having
internal horizontal bracing is obligatory. One bracing
level incase of Individual footings .
(4) Min. size/ thickness of various components shall be
criteria/specifications ( or as per std. practice ) .
(5) Minimum dimensions specified for various
/specifications shall be provided without fail.
(6) The Safe bearing capacity (SBC) on soil shall be
(7) Maximum spacing between horizontal bracings shall
(8)The BB Masonry cabin with MS door shall be
(9) M.S. ladder shall be provided and fixed for access to
For ESR having more than 10 m height RCC. spiral
(10) For ESR-having staging height more than 15 m the
staging with effective tie beams in more than one
(11) Water level indictor shall be provided and fixed
(12) The rate shall include providing and fixing pipes,
(13) CI pipes & specials shall only be used
(14) The rate shall include cost of dewatering during
(15) The structure shall be designed properly for uplift
QTY UNIT DESCRIPTION OF ITEM RATE PER AMOUNT
(16) Effective curing shall be carried out as per
(17) Agency shall engage qualified (at least
(18) 75 % part rate shall be payable for Concrete,
Till then the work shall be treated as incomplete.
Above conditions / general specifications Sr. No. 1 to 18
At Ethan 1 village
1.00 No Cost for shown capacity(up to 12m staging height) 6,91,063.00 6,91,063.00

TOTAL PART I Rs. 6,91,063.00

TOTAL Rs. 6,91,063.00

SAY Rs. 6,91,063.00

I / We Am / Are willing to carry out the above work at % ABOVE / BELOW

(Percentage should be written in figures and words )

Above / Below the estimated amount of my / our tender works out as under :

Tendered amount Rs. Tendered amount Rs.

Below Rs. Above Rs.

Net Rs. Net Rs.

In words Rs. In Words Rs.


Note :
1) All the work shall be carried out as per P.W.D. Hand book vol. I & II and other specification .
2) All the Columns in Schedule "B" should be filled in the totla of the entry in the last Column.
3) Rates quoted shall be for the completed items of work and shall include clearance of site.

SIGN. OF CONTRACTOR. DY. EXECUTIVE ENGINEER


P.H.S. SUB DIVISION
NAVSARI
EXECUTIVE ENGINEER
P.H.WORKS DIVISION