CREEK CASTLE CONTRACTING CO.

RISK ASSESSMENT

Contract: B+G+7+R
Activity/Operation: FIRE/EXPLOSION Page 1 of 1
Risk Level Before Risk Level After
Controls Controls
HAZARD/RISK Those at Risk CONTROLS
L Sv R L Sv R

Fire / Explosion 3 3 9 Work force 1. Fire safety plan will be prepared and updated as necessary. 2 3 6
2. Muster points will be as per fire plan. Fire fighting equipment
will be monitored weekly and maintained annually with records
kept.
3. A suitable method of raising alarm will be identified, detailed
in fire plan and in fire action notices.
4. Fire escape route will be kept clear of debris and materials.
5. A fire safety co-ordinator and fire marshals will be appointed
and trained.
6. Fire Points will be as per the fire plan. Ensure correct type of
fire extinguisher is used.
7. Emergency procedures and fire notice to be posted.
8. Pre determined storage areas for hazardous materials/liquids.
9. All hot works shall be controlled through use of Hot Work
Permits.

Tick here if complexity warrants a method statement/written safe system of


work
Assessed By: IMRAN KHAN Date Assessed: 14/5/16 Review Date: 13/11/16 Key:
L - Likelihood
Assessor’s Signature: Sv - Severity