HAZARD IDENTIFICATION & RISK ASSESSMENT

SPRINKLER WELDING WORK ABOVE 10 FEET SCAFFOL

YASHODA HOSPITALS
PREPARED BY: M.RAJ KUMAR REVIEWED BY :

S.NO ACTIVITY HAZARD ASSOCIATED RISK PROBABILITY

1 Use of scaffold Scaffold with out guard rail *Injuries to near by person 5
* fall from height *person partial or
*fall of material permanent disabilities

*fractures ,breaking of bones

fire hazard due flamable fire to near by materials or 4


materials, vission problem equipemnts. Injury to nearby
person. Burns, respiratory
Hot work(welding , problem,eye strain
cutting,grinding)for
sprinkler pipes in
floor & ceiling height
SK ASSESSMENT
VE 10 FEET SCAFFOLD

TALS
WED BY : APPROVED BY :

EXISTING CONTROL
SEVERITY SxP RISK LEVEL ADDITIONAL CONTROL MESSURES
MESSURES

4 20 *Training system. HIGH 1.Providing guardrailes on scaffold.


* TBT before work 2.Mobile scaffold is erected as
per Manufactures recommendations.
3.Ensure use of PPE [ safety helmet, safet
harness, safety shoes, reflected jacket.
4.Errection should be
done under supervision of scaffold expert.
5.Scaffold errection training to
be done by authorized HSE Team.

3 12 Use of fire blanket, MODERATE 1.Ensure combustible material is removed


provission of fire of welding area.
extinguisher, area 2.Ensure availability of suitable fire
barricated extinguishers. 3.Ensure
use of personal protective equipment like
welding shield, safety shoes, leather hand
gloves.
DATE :04-03-2024

POST RISK
LEVEL ACTION BY
SxP

1x4 = 4 SITE
SAFETY
TEAM
SITE
ENGINEER

2x1=2 SITE
SAFETY
TEAM
SITE
ENGINEER