You are on page 1of 87

ANNEXURE – III

ERECTION OF 400kV, 220kV, 132 kV & 33kV SUBSTATIONS

Sl.
No. Description of Item Unit
-1 -2 -3
1 Hoisting of insulators & hardware, paving conductor and Bus Section
stringing of 400kV main bus for three phases with
quadruple moose conductor to a tension of 1000kgs for
single moose conductor, bus section length is 54mtrs.

2 Hoisting of insulators & hardware, paving conductor and Bus Section


stringing of 400kV Jack bus for three phases with twin
moose conductor to a tension of 1000kgs for single
moose conductor, bus section length is 60mtrs.

3 Hoisting of Insulators and hardware, stretching the Each


conductor and stringing of 220 kV bus comprising of
three phases with Quadruple Moose conductor to a
tension of 900kgs for single moose conductor. (The
maximum length or up to a length of bus section of 40m)

4 Hoisting of Insulators and hardware, stretching the Each


conductor and stringing of 220 kV bus comprising of
three phases with single Zebra/Moose conductor to a
tension of 900kgs.( The maximum length or up to a
length of bus section of 40m)
5 Hoisting of Insulators and hardware, stretching the Each
conductor and stringing of 220 kV bus comprising of
three phases with Twin Zebra/Moose conductor to a
tension of 1800kgs, including fixing of spacer
clamps( The maximum length or up to a length of bus
section of 40m).
6 Hoisting of Insulators and hardware, stretching the Each
conductor and stringing of 132 kV bus comprising of
three phases with Single Zebra/Moose conductor to a
tension of 900kgs.( The maximum length or up to a
length of bus section of 45m).
7 Hoisting of Insulators and hardware, stretching the Each
conductor and stringing of 132 kV bus comprising of
three phases with Twin Zebra/Moose conductor to a
tension of 1800kgs including fixing of spacer clamps.
( The maximum length or up to a length of bus section of
45m).
8 Hoisting of Insulators and hardware, stretching the Each
conductor and stringing of 33 kV bus comprising of
three phases with Single Zebra/Moose conductor to a
tension of 450kgs.( The maximum length or up to a
length of bus section of 20m).
Sl.
No. Description of Item Unit
-1 -2 -3
9 Hoisting of Insulators and hardware, stretching the Each
conductor and stringing of 33 kV bus comprising of
three phases with Twin Zebra/Moose conductor to a
tension of 900kgs including fixing of spacer clamps.
(The maximum length or up to a length of bus section of
20m).
10 Hoisting of Insulators and hardware, stretching the Each
conductor and stringing of 132 kV bus comprising of two
phases with Single Zebra/Moose conductor to a tension
of 900kgs.( The maximum length or up to a length of
bus section of 45m).
11 Erection of 7/3.66 G.S. Earth wire from top of Peak RM
tower and LMs to ground and connecting to untreated
earth pits including cutting, clamping and fixing of all
hardware like Pad type compression clamp, cleat type
clamp and T clamp etc (for 400kV).
12 Fixing of spacers for Twin Moose conductor Each
13 Fixing of spacers for Quadruple Moose conductor Each
14 Fixing of Hardware, stretching the ground wire and Each
stringing of earth wire to a tension of 450kgs from
pinacle to pinacle.
15 Fixing of Hardware, stretching the ground wire and RM
stringing of earth wire to a tension of 450kgs from
pinacle to ground.
16 Connecting equipment to equipment through 4" IPS Al Meter
tube including cutting, bending, welding, testing,
clamping etc., for each meter including both side
connections.
17 Connection of equipment to bus and or another Each
equipment with single zebra / Moose conductor
including measuring, cutting, clamping and hoisting of
suspension insulator assembly to support the conductor
wherever necessary.
18 Connection of equipment to bus and or another Each
equipment with Twin zebra / Moose conductor including
measuring, cutting, clamping and hoisting of suspension
insulator assembly to support the conductor wherever
necessary.
19(i) Laying of earth mat including excavation & backfilling,
welding, connecting to all equipment, structures,
Junction boxes, and connecting lightning shield to earth
mat and earthing of fence posts, drilling and connecting
earth rods including connecting to cast iron pipes as per
approved drawings with the following sizes:(for 400kV)

M.S. Rod 40 mm dia. RM


19(ii) Fabrication and connecting to risers from earth mat to
structures, equipment, marshalling boxes, electrical
panels, PLCC panels, fencing posts etc.,.(for 400kV)

(a) M.S./ G.S. Flat 75 x 12 mm RM


(b) M.S./ G.S. Flat 50 x 8 mm (Above ground) RM
(c) Un-Treated Earth pits including installation of 40 mm dia Each
rod electrode, disconnecting links, and all required
materials and RCC collar/ chambers with bricks, cement
mortar 1:4 and completion of related civil works as
specified for LMs, LAs, Carrier couplings and CVTs.
(Cost of RCC Collar included)
20 Laying of earth mat including excavation of trenches,
welding, connecting to equipment and connecting
lightning shield to earth mat and earthing of fence posts,
drilling and connecting earth rods including connecting
cast iron pipes as per Drg. No.SET(P)/149/82 with the
following sizes of MS Flats /GI Flats.(for 220kV &
132kV) including fabrication.

(a) 100x16mm MS Flat / GI Flat. RM


(b) 50x 8mm MS Flat / GI Flat. RM
(c) For laying of earth flat in hard rock in substation / bays
extension, an additonal amount of Rs.40/-per RM to the
basic labour rate of SSR will be allowed as there is no
provision in the rate of laying of earth flat for remvoal of
hard rocks.
21 Excavation of earth pit, putting cast iron pipe with flange Each
on one end (as per ISS7181/86) of nominal dia 125mm
and 2.75 meters long in side the pit including supply and
fixing RCC collars 0.75 meter dia (OD), 50mm thick and
0.60meters long in side the pit, backfill the pit in the
25mm size granules of BHcoke for full depth of the pit
with alternate layers of BH coke and salt of 300mm thick
around the earth pipe of 150mm on all the sides of the
pipe including cost and conveyance of BH coke, salt,
clamps, C.I.Pipes and RCC collars, labour charges for
all operational and incidental items of work etc.,
complete.

22(I) Laying including termination and providing suitable


ferrules & lugs etc of armoured Control cables of size 2
core, 2.5 Sq.mm to 27 core, 2.5 Sq. mm including cost
of Cable Glands, lugs, ferrules (for 400kV)

(a) 2 to 12 core RM
(b) 14 to 19 core RM
(c) 27 core RM
22(II) Laying including termination and providing suitable
ferrules & lugs, Jointing kits etc of armoured Power
cables of the following size including cost of cable
glands, lugs, ferrules etc complete.(for 400kV)
(a) upto 50 sq.mm RM
(b) above 50 sq.mm to 300 sq.mm RM
I above 300 sq.mm to 700 sq.mm RM
23 Buried Cable Trench - Excavation for cable trench
providing 100mm thick sand layer before and after
laying the cable & Providing 4" thick brick cover over
sand, refilling, consolidation and levelling of surplus
earth including the cost and conveyance of all materials,
route markers, labour charges etc. complete for finished
item of work (for 400kV).

(a) Size : 300 x 600 mm RM


(b) Size : 1500 x 800 mm RM
24 Erection of Galvanised Cable trays with 2mm thick RM
perforated CRCA Sheet. Size : 200 and 600 mm (for
400kV)
25 Laying and termination of HF cables for PLCC system RM
(for 400kV)
26 Laying of Telephone cable of Different sizes in cable RM
trench/ PVC Conduit pipe in wall (for 400kV)
27 Laying of underground OFAC (Optical Fibre Approach RM
cable of 12 fibre capacity) through 40 mm dia PLPE
HDPE pipe (Laying of pipe included) (for 400kV)

28 Laying of control cables of all sizes (from 2 core. 2.5 / RM


4.0sqmm to 12 core, 2.5/4.0sqmm, both copper and
alluminium in cable trenches including cost of suitable
metallic cable glands with rubber lining. Note: This
includes running of cables in control room where cables
are run on cable racks in cable duct (for 220kV &
132kV).

29 Laying of power cables (for 220kV & 132kV). :-


a upto 50 sqmm RM
b above 50 sqmm RM
30 Cable terminations to the switchgear, Marshalling boxes
/ Panel terminal blocks/control & relay panels, LTAC
panel including providng suitable ferrules and lugs as
per specification (including cost of ferrules and lugs) (for
220kV & 132kV).
(i) 2.5 sqmm Copper with copper lugs each core at both Nos.
ends.
(ii) 4.0 sqmm Aluminium with Aluminium lugs each core at Nos.
both ends.
(iii) Up to 50 sqmm Power Cable with lugs each core at both Nos.
ends.
(iv) Above 50 sqmm Power Cable with lugs each core at Nos.
both ends.
31 Instalation of lighting fixtures on switch yard structures Each
including cabling and connections, labour charges etc.,
including 40mm dia G.I bent pipe of 0.75m length with
suitable clamps for fixing to structures in complete
shape (excluding cost of lighting fixtures)
32 Erection of the following equipment with Crane / Derrick
at site including handling the material / equipment
carefully at site including labour charges for all
incidental and operational items of work. (excluding cost
of transport charges from Dept. stores to the site).
Note :- In 400kV Substations only, 25% extra charges
for Testing and Commissioning of switchgear equipment
where ever applicable).

a(i) 420 KV SF6 Circuit breaker with support structure & Set
marshalling boxes
a(ii) 220 kV Circuit breakers with support structure & Each
marshalling boxes
a(iii) 132 kV Circuit breakers with support structure & Each
marshalling boxes
a(iv) 33 kV Circuit breakers Each
b(i) 420 KV Single phase current transformers with Each
secondary terminal box
b(ii) 220 kV Current Transformers. Each
b(iii) 132 kV Current Transformers. Each
b(iv) 33 kV Current Transformers. Each
c(i) 220 kV Potential Transformers. Each
c(ii) 132 kV Potential transformers. Each
c(iii) 33 kV Potential transformers. Each
d(i) 390 KV Lightning Arrestors Each
32d(ii) 220 kV Lightning Arrestors. Each

d(iii) 132 kV Lightning Arrestors. Each


d(iv) 33 kV Lightning Arrestors. Each
e(i) 420kV Single phase Capacitive Voltage transformers Each
with secondary terminal box ( with / without carrier
coupling device)
e(ii) 220 kV Capacitve Voltage Transformers. Each
e(iii) 132 kV Capacitve Voltage Transformers. Each
f(i) 400 KV Isolators, 3 pole Horizontal centre break With Set
Single earth switch
f(ii) 400 KV Isolators, 3 pole Horizontal centre break With Set
Double earth switches
f(iii) 220 KV Isolators, 3 pole Horizontal Double break With Set
Double earth switches
f(iv) 220 kV Isolators with earth swtich Each
f(v) 132 kV Isolators with earth swtich Each
f(vi) 220 kV Isolators without earth swtich Each
f(vii) 132 kV Isolators without earth swtich Each
f(viii) 33 kV Isolators Each
g(i) 400 KV Line Traps with pedestal stand Each
g(ii) 220 kV Wave traps Each
g(iii) 132 kV Wave traps Each
h(i) 400 KV Bus post insulators Each
h(ii) 220 kV Bus Post Type Insulators / Solid Core Insulators Each

h(iii) 132 kV Bus Post Type Insulators / Solid Core Insulators Each

h(iv) 33 kV Bus Post Type Insulators / Solid Core Insulators Each

33 33 kV /400 V Station Transformer and HG fuse set Each


including all necessary connections on HV & LV side
including cost of lugs (But excluding cost of transformer
and HG fuse set)
34 Erection of Control / Relay panels, LTAC panels, Each
annunciation panels etc., in the control room duly
mounting them on channels and grouting them with
foundation bolts excluding cost of channels & foundation
bolts (for 220kV & 132kV)
35 Erection of 220 V, 200 Ah/ 80 Ah battery in complete Set
shape fit for charging (for 220kV & 132kV).
36 Erection of 220 V, 200 Ah / 80Ah battery charger (for Set
220kV & 132kV).
37 Erection of PLCC battery set (Lead acid Battery) in Set
complete shape fit for charging.
38 Erection of PLCC battery set (Maintenance free) in Set
complete shape fit for charging (for 220kV & 132kV).
39 Erection of PLCC battery charger) in complete shape fit Set
for charging (for 220kV & 132kV).
40 Erection of Line Matching Unit Each
41 Erection of Capacitor Bank including series reactor of Each
7.5 MVA Capacity
42 Erection of PLCC Equipment, site handling, providing
base channel, supports in complete shape (for 400kv
sub stations)
(a) PLCC Panel Each
(b) EPAX-Decolam Table Each
(c) Battery charger cum DC DB (incl. Testing&Alumi) Each
(d) 48 V, 400 AH Battery (incl. Testing&Comm.) Each
43 Erection of Marshalling kiosk Each
44 Erection of Marshalling boxes Each
45 Erection of Lighting pillar-box in switchyard on Each
foundation laid (Excluding pillar box). (for 220kV &
132kV)
46 Fabrication of Main and Auxiliary structures, stub setting MT
templates, foundation bolts, ‘U’ bolts etc,.using raw steel
such as M.S.Angles, Plates, Channels, R.S.Joists,
M.S.rounds, excluding cost of Mild Steel and transport
charges to substation site.
47 Galvanization of Main and Auxiliary structures, stub MT
setting templates, foundation bolts, ‘U’ bolts etc, using
raw steel such as M.S.Angles, Plates, Channels,
R.S.Joists, M.S.rounds, excluding cost of zinc and
transport charges to substation site. (Cost of zinc should
be followed as per IEEMA rates.). The average quantity
of Zinc required for all angles of tower parts is 60 Kgs.

48 Setting of stubs with stub setting template for sub-


station structure: Erection of stub template, fixing of
jacks for supporting the template, alignment and leveling
of exact location of stubs of stub setting template,
dismantling of template after completion of initial curing
of CC
(a) For 220kV Towers Set
(b) For 132kV Towers Set
(c) For 33kV Towers & CPL’s Set
49 Erection of the main and auxiliary structures etc., using MT
bolts and nuts.
50 Fixing of 90lb rail poles over the transformer plinths. RM
51 Fixing of 105lb rail poles over the transformer plinths. RM
52 Erection of 33kV HG Fuse set Each
53 Painting of towers with two coats of Aluminium paint
using Aluminium paint 1st grade containing 3.6 kg of
Aluminium paste for 18 liters of thinner 1 st coat is to be
applied before erection of towers and 2 nd coat after
stringing and half round welding including cost of paint,
cost of brushes, labour charges etc., complete.

(a) First coat of 1st Grade Aluminium Paint duly scratching MT


and cleaning of towers including labour charges, cost of
paint, brushes etc.
(b) Labour charges for painting including scratching and MT
cleaning of towers of 1st coat of Aluminium with out cost
of paint & brushes.
© Second coat of 1st Grade Aluminium Paint duly MT
scratching and cleaning of towers including labour
charges, cost of paint, brushes, etc,.
(d) Labour charges for painting including scratching and MT
cleaning of towers of 2nd coat of Aluminium with out cost
of paint & brushes.
54 Painting of towers single coat of red oxide paint of 1 st
Grade, including scratching and cleaning of towers.
(a) One coat of 1st Grade Red Oxide Paint including labour MT
charges for scratching and cleaning of towers including
cost of paint, brushes etc,.
(b) Labour charges for painting of towers including MT
scratching and cleaning of towers without cost of paint &
brushes.
55 Preparation of contour plan of Substation switch yard One Acre
sites by taking levels at 10m X 10m grid interval (where
ever the ground level variation are in substation or hilly
areas 5 m x 5m grid may be adopted). Plotting the
contours at each 1 Mtr. Intervals duly showing the
boundaries of the site, existing structures/features,
roads, natural drain and ponds. There alternative
formation levels along with cutting and filling quantities
of earth in a most economical way are to be prepared
and submitted. The rates are inclusive of cost and
conveyance of materials, labour charges, hire charges
of equipment and tools & plants.
BSTATIONS

SS Rate for 2009-


10 (Rs.)
-4
22257

11289

12930

3233

6468

3233
6468

2425

SS Rate for 2009-


10 (Rs.)
-4
4044

2155

33

64
96
484

33

143
193

299

86

75
32
1204

50
39.4
7819

29
33
39

50
64
81

140
372
33

16

7.4

7.4
10.2

20.2

21.5

39.3

73.2

647
13522

11318

8085

2506
3854

2750
1779
647
2750
1779
647
3718
1779

840
357
3854

2587
1779
7829

9395

5239

4366
3233
4044
2910
1051
2498
1213
840
3718
1779

840

357

4044

1131

6953

2506

3721

2291

1146

235
2900

3000
732
4413
4413
484
235
647

5738

3361

2268
1628
407
1617

322
376
390

2618
734

1532

416

1640

910

2000
ANNEXURE-IX

EQUIPMENT / MATERIAL RATES

Sl. Description of Item Unit SS Rate for 2009-10


No. (Rs.)
(1) (2) (3) (4)
SUBSTATION MATERIALS
1 100kVA 33/0.4kV Stn. Transformer with HG Fuse set Each 250998.00
2 250kVA 33/0.4kV Stn. Transformer with HG Fuse set Each 430186.00
3 220kV SF6 Circuit Breakers Each 1364414.00

4 132kV SF6 Circuit Breakers Each 735630.00

5 33kV Vacuum Circuit Breakers Each 277989.00

6 220kV PTR CTs 300Amps. Each 380855.00

7 220kV Feeder CTs 800 Amps Each 375855.00

8 132kV PTR CT’s 300A (Differential Core) Each 121582.00

9 132kV Feeder CTs 600 A Each 89637.00

10 33kV CTs 1200 A Each 34671.00

11 33kV CTs 400 A Each 21558.00

12 220kV Potential Transformers Each 371857.00

13 132kV Potential Transformers Each 143784.00

14 33kV Potential Transformers Each 28431.00

15 220kV CVTs Each 324342.00

16 132kV CVTs Each 220131.00

17a 220kV Lightning Arrestors Each 50769.00

17b 132kV Lightning Arrestors Each 36033.00


17c 33kV Lightning Arrestors Each 4300.00

18 220kV, 800A Isolators with E/s Each 158851.00

19 220kV, 800A Isolators without E/s Each 136158.00

20 220kV,1600A Isolators with E/s Each 195000.00

21 220kV, 1600A Isolators without E/s Each 185000.00

22 132kV 800A Isolators with E/s Each 102118.00

23 132 kV 800A Isolators W/O E/s Each 79425.00

24 33 kV Isolators - 800 Amps Each 34039.00

25 220kV Solid Core Insulator Each 16736.00

26 132kV Solid Core Insulator Each 9191.00

27 33kV Solid Core Insulator Each 2042.00

28 220V, 200AH Battery Set Set 351741.00

29 220V 200Ah Battery set (M.F.) Set 499245.00

30 220V 200Ah Charger with DCDB Set 209910.00

31 220V 80Ah Battery set(MF) Set 249623.00

32 220V 80Ah / 100 Ah Charger with DCDB Set 204237.00

33 220kV Transformer C&R Panel Each 1097534.00

34 220kV Feeder C&R Panel Each 1057516.00

35 220kV Bus bar Protection Panels Each 2496226.00

36 220kV Bus-Coupler C & R Panels Each 366000.00

37 132kV feeder C&R panel Each 743564.00

38 132kV Transformer panel. Each 964451.00

39 LTAC panel Each 249623.00

40 33kV Twin feeder panel Each 243949.00

41 11kV , 2500 Amps VCB Kiosk Each 775000.00


41 11kV , 2500 Amps VCB Kiosk Each 775000.00

42 11kV , 1250 Amps VCB Kiosk Each 480000.00

43 2C x 2.5 Sq.mm KM 26214.00

44 4C x 2.5 Sq.mm KM 47022.00

45 6C x 2.5 Sq.mm KM 67830.00

46 10C x 2.5 Sq.mm KM 109140.00

47 12C x 2.5 Sq.mm KM 130050.00


CLAMPS AND CONNECTORS FOR SS
51 5-Bolted type tension H/W for Twin Moose or Zebra Conductor Set
with 400mm spacing for 220KV and 132KV
52 Spacer clamps suitable for Moose or Zebra ACSR conductor with Set
400mm spacing for 220KV and 132KV
53 Spacer T-clamps suitable for Moose or Zebra ACSR conductor Set
with 400mm spacing for 220KV and 132KV
54 Suspension clamps suitable for Twin Moose / Zebra conductor for Set
220KV and 132KV
55 5-Bolted type single tension H/W for single Moose or Zebra Set
Conductor for 220KV and 132KV
56 3-Bolted type single tension H/W suitable for single Moose or Set
Zebra ACSR Conductor for 33KV
57 3-Bolted type single tension H/W suitable for Twin Moose or Set
Zebra ACSR Conductor with 150mm spacing for 33KV
58 Spacer clamps suitable for Moose or Zebra ACSR conductor with Set
150mm spacing
59 Spacer T-clamps suitable for Moose or Zebra ACSR conductor Set
with 150mm spacing
60 T-clamps suitable for Moose or Zebra all three ways Each
61 3-bolted Earth wire Tension clamp Set

62 CT Stud clamps suitable for Moose or Zebra ACSR conductor on Each


one side and CT Stud on other side with stud size for single Zebra

63 CT Stud clamps suitable for Moose or Zebra ACSR conductor on Each


one side and CT Stud on other side with stud size for Twin Zebra

64 PT clamp for Single Zebra / Moose Each

65 PT clamp for twin Zebra / Moose Each

66 LA clamps for single Zebra / Moose Each

67 LA clamps for twin Zebra / Moose Each

68 Pad clamps suitable for twin Zebra/Moose/Panther Each

69 Pad clamps suitable for single Zebra/Moose/Panther Each

70 T-clamps suitable for any conductor Each

71 Post type insulator support clamps for twin conductor for 220KV Each
and 132KV
72 Post type insulator support clamps for single conductor for 220KV Each
and 132KV
73 Post type insulator support clamps for twin conductor for 33KV Each

74 Post type insulator support clamps for single conductor for 33KV Each

75 Suspension clamp suitable for single conductor Each

76 Spacer T-clamp with double dropper suitable for Moose/Zebra Each

77 5-bolted type tension hardware for quadruple Moose Set


78 Suspension hardware for quadruple Moose Set

79 Spacers for quadruple Moose Each

80 16mm U-Bolts Each

81 Hot Dip Galvanized Bolts & Nuts including Spring washers, Pack MT
washers and flat washers etc.,
3203.00

439.00

901.00

3016.00

2012.00

1957.00

3040.00

314.00

806.00

399.00
681.00

484.00

917.00

550.00

911.00

447.00

911.00

911.00

444.00

399.00

893.00
643.00

705.00

574.00

1307.00

1017.00

8199.00
8025.00

1063.00

146.00

86629.00
DATA
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.
SCHEDULE - IV : ERECTION WORKS IN SWITCH YARD & CONTROL ROOM (ELECTRICAL)
Up to 5KM 5 33.53
DATE OF ESTIMATE :- Every KM beyond 5 up to 30 25 125.75
SSR ADOPTE2010-2011 Every Km beyond 30KM 15 62.85
LI & LA 14.00% AA 0% Transport steel 222.13
AREA ALLOWANCE 25.00% LI & LA 13%
INDUSTRIAL AREA ALLOWANCE 20.00%
LABOUR CESS 1.00%
DISTANCE FROM HYDERABAD 45 Km Add 80 Km
All amountsare in Rupees

2 Supply G I structure parts including cost & conveyance, fabrication and galvanisation etc., complete for finished item of work Rail poles RM
Cost of G I structure parts per MT (cost of galv.ss structure-cost of galvanisation as per Memo No CPT310/SE/P II/DE-3/D No = Rs. 54667.00 54667.00
49/10 Dt 18.02.2010
Add E.D @ 8.24% = Rs. 4505.00
Transportation charges for steel up to site as per Common SSR 2010-11(Distance from Hyderabad per MT (in Rupees) per MT 222.13

Transportation charges per RM = Rs. 222.13

Add Area Allowances at the rate applicable 25.00% = Rs. 0.00


LI & LA 14.00% = Rs. 0.00
Ind Area Allowance
Basic Rate = Rs. 59394.13 59394.00

3 Supply of G I bolts & Nuts including cost of conveyance, duties & taxes and insurance 86629.00 86629.00

Add Area Allowances at the rate applicable 25.00% = Rs. 0.00


LI & LA 14.00% = Rs. 0.00
Basic Rate = Rs. 86629.00 86629.00

4 Setting of stubs with stub setting template for sub-station structure: Erection of stub template, fixing of jacks for supporting
the template, alignment and leveling of exact location of stubs of stub setting template, dismantling of template after
completion of initial curing of CC
Erection of stu setting template cost as per SSR2009-10 220kv = Rs. 2268.00 = Rs. 2268.00
Add Area Allowances at the rate applicable 25.00% = Rs. 567.00
LI & LA 14.00% = Rs. 317.52

Basic Rate = Rs. 3152.52 3153.00


Erection of stu setting template cost as per SSR2009-10 132kv = Rs. 1628.00 = Rs. 1628.00
1628.00
Add Area Allowances at the rate applicable 25.00% = Rs. 407.00
LI & LA 14.00% = Rs. 227.92

Basic Rate = Rs. 2262.92 2263.00


Erection of stu setting template cost as per SSR2009-10 33kv = Rs. 407.00 = Rs. 407.00
407.00
Add Area Allowances at the rate applicable 25.00% = Rs. 101.75
LI & LA 14.00% = Rs. 56.98

Basic Rate = Rs. 565.73 566.00


6 Erection of all types of structures fabricated from RS joists, M.S.Angles, channels, plates,rods etc.(Super structures and Bolts & Nuts) Structure SED 3 MT
erection

Erection of structures cost as per SSR2009-10 = Rs. 1617.00 = Rs. 1617.00


1617.00
Add Area Allowances at the rate applicable 25.00% = Rs. 404.25
LI & LA 14.00% = Rs. 226.38
Basic Rate = Rs. 2247.63 2248.00

10 Fixing hardware, stretching the groundwire and stringing of over head earth bus from pinacle to pinacle excluding cost of ground wire, SED 5 Each
but including cost of tension clamps etc.,
Stringing Labour cost as per SSR 2009-10 Each = Rs. 484.00
484.00
Add Area Allowances at the rate applicable 25.00% = Rs. 121.00
LI & LA 14.00% = Rs. 67.76
Add Cost of 3 Bolted single tension clamps (2 Nos.) 681.00 per set = Rs. 1362.00
(2 Nos. per phase)
Basic Rate = Rs. 2034.76 2035.00

11 Connecting equipment to bus and/or another equipment with SINGLE MOOSE / ZEBRA conductor including measuring,cutting SED 6 Each
clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary including cost of tee connector

Without clamps
Jumpering Labour cost as per SSR 2009-10 = Rs. 193.00
Add Area Allowances at the rate applicable 25.00% = Rs. 48.25
LI & LA 14.00% = Rs. 27.02
Laour charges for 1 jumper 268.27
No.of Jumpers 45 Nos
Labour charges for …10…...jumpers = Rs. 12072.15
Basic rate (Cost per jumper) = Rs. 268.27 268.00

Dismantling of jumpers of single zebra conductor 268.27 x 75% 201.20


201.00

12 Connecting equipment to bus and/or another equipment with SINGLE MOOSE / ZEBRA conductor including measuring,cutting Twin Jumper SED 6b Each
clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary including cost of tee connector

With clamps
Jumpering Labour cost as per SSR 2009-10 = Rs. 193.00
193.00
Add Area Allowances at the rate applicable 25.00% = Rs. 48.25
LI & LA 14.00% = Rs. 27.02
Laour charges for 1 jumper 268.27
No.of Jumpers 48 Nos
Labour charges for …29…...jumpers = Rs. 12876.96
Cost of Suspension hardware for Single Zebra 3 3016.00 9048.00
Cost of T clamps 15 399.00 5985.00
Add Cost of clamps 15033.00
Cost of 29.. Jumpers 27909.96
Basic rate = Rs. 581.46 581.00

13 a&b laying of earth mat gi/ms 100X16 mm 100x16mm GI MS


Cost of GI steel Per kg = Rs. 44.91 30.00
Add 10% extra towards wastage, cleats, overlap etc as per SSR 2009-10 4.49 3.00
Total cost of earth material per Kgs 49.40 33.00
Cost of GI steel required for earth flat per RM (12.6Kg/RM) kg/RM 12.6 = Rs. 622.45 415.80
Laying cost of Earth mat as per SSR 2010-11 per RM = Rs. 50.00
50.00
Add Area Allowances at the rate applicable 25.00% 12.50
LI & LA 14.00% = Rs. 7.00
Laour charges
Basic rate = Rs. 69.50 70.00
Basic rate including supply of material 692.00 485.00

14 a&b Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to 50x8mm flat SED 7 c GI MS
earth mat and earthing of fence posts,drilling and connecting earthrods with - 50 x 8mm MS Flat

Basic Rate -(Total cost of MS steel including all taxes and duties including transportation to site.) per MT As per SED
1b
Cost of MS steel Per kg = Rs. 44.91 30.00
Add 10% extra towards wastage, cleats, overlap etc as per SSR 2009-10 4.49 3.00
Total cost of earth material per Kgs 49.40 33.00
Cost of steel required for earth flat per RM (3.1Kg/RM) kg/RM 3.1 139.22 93.00
Laying cost of Earth mat as per SSR 2009-10 per RM = Rs. 39.40
Add Area Allowances at the rate applicable 25.00% 9.85
LI & LA 14.00% = Rs. 5.52
Labour charges 54.77
Basic rate = Rs. 54.77 55.00
Basic rate including supply of material 194.00 148.00

15 Excavation of earth pit, putting cast iron pipe with flange on one end ( as per relevant ISS ), of nominal dia 125 mm and 2.75 metres long Earth Pit SED 8 Each
inside the pit including supply and fixing of RCC Collars 1mtr dia and 0.6 mtrs long inside the pit, and backfill t

Erection cost as per SSR 2009-10 = Rs. 7819.00


7819.00
Add Area Allowances at the rate applicable 25.00% 1954.75
LI & LA 14.00% = Rs. 1094.66
Labour charges 10868.41
Add Transportation cost of C.I.Pipes (One C.I Pipe weight-95 Kgs)
(Steel transportation cost per MT*95/1000 for 100KM) (471*95/1000) = Rs. 0.00
= Rs. 10868.41 10868.00

16 Laying of control cables of all sizes (from 2 core, 2.5 sqmm to12 core,2.5 sqmm both copper and aluminium) in cable trenches including Control Cable SED 9 RM
cost of suitable metallic glands with rubber lining & dressing. This includes running of cables in control room where ca laynig

Laying cost as per SSR 2009-10 = Rs. 7.40


7.40
Add Area Allowances at the rate applicable 25.00% = Rs. 1.85
LI & LA 14.00% = Rs. 1.04
Basic rate = Rs. 10.29

17a Cable termination to the switch-gear, marshalling boxes/panel terminal blocks/control & relay panels, LTAC panel, including providing Cu.. Cable SED 10 a Each
suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted for termina Termination

cost as per SSR 2008-09 = Rs. 20.20


20.20
Add Area Allowances at the rate applicable 25.00% = Rs. 5.05
LI & LA 14.00% = Rs. 2.83
Basic rate = Rs. 28.08 28.00
17b Cable termination to the switch-gear, marshalling boxes/panel terminal blocks/control & relay panels, LTAC panel, including providing Al.. Cable SED 10 b Each
suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted is for term Termination

cost as per SSR 2009-10 = Rs. 20.20


20.20
Add Area Allowances at the rate applicable 25.00% = Rs. 5.05
LI & LA 14.00% = Rs. 2.83
Basic rate = Rs. 28.08 28.00

18 Installation of lighting fixtures of 250 Watts HPSV of Crompton Greveas / Phillips make, on switchyard structures including cost of Lighting SED 11 b Each
lighting fixtures and cabling and connections Fixtures
Cost of Lighting Fixture with lamp complete including all taxes & duties =Rs. 6500.00
cost as per SSR 2009-10 =Rs. 647.00
647.00
Add Area Allowances at the rate applicable 25.00% 161.75
LI & LA 14.00% = Rs. 90.58
Basic rate = Rs. 7237.58 7238.00

20 Erection of marshalling box on the structures of equipment including cost of marshalling boxes Erection - SED- 14 Each
Marshelling
Box
Cost of marshalling box 5200.00
Erection cost as per SSR 2009-10 235.00
235.00
Add Area Allowances at the rate applicable 25.00% 58.75
LI & LA 14.00% 32.90
labour = Rs. 326.65
Basic rate = Rs. 5526.65 5527.00

25 Writing of names in the control room for identification of rooms, on panels, equipment, marshalling boxes, kiosks, with CT 2000.00
ratio etc., & on maingates neatly with superior quality paint brushes & labour etc., complete on the main gate with superior
quality synthetic enamel paint with two coats including cost of paint, brushes and labour charges etc complete.

27 Supply of Insulation of Rubber mats of size 2m x 1m x 6mm confirming to IS 5424/96 and laying in front of panels in the Rubber mats SED 18 Each
Control Room

Cost of Insulation Rubber mats (Including all Taxes & duties) = Rs. 1200.00
Basic rate = Rs. 1200.00

30 Supply and fixing of Glow sign board, using 1" (25.4mm) square pipe for outer frame box, using best quality flex with Glow sign SED 22 h 12000
computerised cut letters and symbol ( APTRANSCO logo, name and capacity) using good quality tubes, aluminium chokes of board
Phillips / Crompt

31 a Providing of "Caution Boards" of size 12"x8" painted as Danger including cost of paint, brushes and labour charges etc., Danger SED 22 d Each
complete as directed by the engineer in charge. Board

Cost of Danger Board(Including all Taxes & duties) = Rs. 200.00


Basic rate = Rs. 200.00

31 b Providing of "Caution Boards" of size 12"x8" painted as Line Clear including cost of paint, brushes and labour charges etc., L/C Board SED 22 b Each
complete as directed by the engineer in charge.

Cost of L/C Board(Including all Taxes & duties) = Rs. 200.00


Basic rate = Rs. 200.00

32 a Providing of "Caution Boards" of size 12"x8" painted as Load Relief including cost of paint, brushes and labour charges etc., L/R Board SED 22 a Each
complete as directed by the engineer in charge.

Cost of L/R Board(Including all Taxes & duties) = Rs. 200.00


Basic rate = Rs. 200.00

32 b Providing of "Caution Boards" of size 12"x8" painted as Break down including cost of paint, brushes and labour charges etc., B/D Board SED 22 c Each
complete as directed by the engineer in charge.
Cost of B/D Board(Including all Taxes & duties) = Rs. 200.00
Basic rate = Rs. 200.00

33 Supply and fixing of Portable Emergency twin tube fittings of 20Watts capacity make Bajaj/Panasonic 2500.00
Basic rate

34 Supply and fixing of 15 lbs CO2 portable fire extinguishers of standard make with ISI certification like Fire flex / Sharathy 15 lbs CO2 SED 19 a Each
industries complete with first filling Horn and Hose.

Cost of 15lbs Co2 portable fire extinguishers (Including all Taxes & duties) = Rs. 5100.00
Basic rate = Rs. 5100.00

35 Supply and fixing of 50 lbs CO2 portable fire extinguishers (with Trolly) of standard make with ISI certification like Fire flex / 50 lbs CO2 SED 19 b Each
Sharathy industries complete with first filling Horn and Hose.

Cost of 50lbs Co2 portable fire extinguishers(Including all Taxes & duties) = Rs. 13900.00
Basic rate = Rs. 13900.00

Cost of Supply & Fixing of GI Flexible earth Bonds = Rs. 150.00


Basic rate = Rs. 150.00

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.
COST DATA FOR STEEL

Apr-09 May-09 Jun-09 Jul-09 Aug-09


1 G I Tower parts MT 64824 65097 63017 62656 62276
2 G I structure parts MT 55781 55818 54124 53839 52811
3 MS Flat MT 33000 33000 32500 31500 30000
4 G I Flat MT 44789 45367 44838 44005 43054
Sep-09 Oct-09 Nov-09 Dec-09
63681 63126 63844 64818
54489 53515 53753 54667
31000 30000 29000 30000
44681 43758 43047 44910
STANDARD ELECTRICAL DISCRIPTIONS OF ITEMS IN SUBSTATION ESTIMATES.
ABSTRCT ESTIMATE
NAME OF WORK :- ERECTION OF 132KV BAY EXTENSION IN132/33KV KOTHUR SS FOR SHAMSHABAD FEEDER

SCHEDULE - IV : ERECTION WORKS IN SWITCH YARD & CONTROL ROOM (ELECTRICAL)


Tax
Std. Electl. Unit of
Labour @10.3
S.L. Measu VAT @
QTY Description Item Short Discription Disc. No. Basic Rate Cess % on RATE Amount
No. re- 4%)
@1% 33% of
(SED No.) ment
Basic
(1) (2) (3) (5) (4) (5) (6) (7) (8) (9) (10) (11)
1 Setting of stubs with stub setting template for sub-station Stub setting
structure: Erection of stub template, fixing of jacks for supporting
the template, alignment and leveling of exact location of stubs of
stub setting template, dismantling of template after completion of
initial curing of CC
19 a. 220kv stuctures 3152.52 31.53 Each 126.10 107.15 3417.30 64928.70
8 b. 132kv structures 2262.92 22.63 Each 90.52 76.92 2452.99 19623.92
62 c. 33kv structures and CPLs 565.73 5.66 Each 22.63 19.23 613.25 38021.50
2 63.00 Erection of all types of structures fabricated from RS joists, Structure erection SED 3 3152.52 31.53 MT 126.10 107.15 3417.30 215289.90
M.S.Angles, channels, plates,rods etc.(Super structures and Bolts
& Nuts)
3 28 Fixing hardware, stretching the groundwire and stringing of over Earth Bus SED 5 2034.76 20.35 Each 81.39 69.16 2205.66 61758.48
head earth bus from pinacle to pinacle excluding cost of ground
wire, but including cost of tension clamps etc.,

4 45 Connecting equipment to bus and/or another equipment with Twin Jumper SED 6 268.27 2.68 Each 10.73 9.12 290.80 13086.00
SINGLE MOOSE / ZEBRA conductor including
measuring,cutting clamping and also hoisting of suspension
insulator assembly to support the conductor wherever necessary
including cost of tee connectors etc.,without clamps

5 48 Connecting equipment to bus and/or another equipment with Single Jumper SED 6 c 581.46 5.81 Each 23.26 19.76 630.29 30253.92
SINGLE MOOSE / ZEBRA conductor including
measuring,cutting clamping and also hoisting of suspension
insulator assembly to support the conductor wherever necessary
including cost of tee connectors,suspension clamps and spacer
clamps etc.with Clamps

6 Dismantling of jumpers of single Zebra from the dismantled


201.00 2.01 Each 8.04 6.83 217.88 4575.48
21 equipment
7 200 Laying of earth mat including excavation of trenches,welding and 100 x 16mm MS Flat SED 7 a 69.50 0.70 RM 2.78 2.36 75.34 15068.00
fixing lugs,connecting to equipment and connecting lightning
shield to earth mat and earthing of fence posts,drilling and
connecting earthrods with - 100 x 16mm MS Flat

7A 30 Laying of earth mat including excavation of trenches, welding 100 x 16mm GI Flat SED 7 b 69.50 0.70 RM 2.78 2.36 75.34 2260.20
and fixing lugs,connecting to equipment and connecting lightning
shield to earth mat and earthing of fence posts,drilling and
connecting earthrods with 100 x 16mm GI Flat

7B 325 Laying of earth mat including excavation of trenches,welding and 50 x 8mm MS Flat SED 7 c 54.77 0.55 RM 2.19 1.86 59.37 19295.25
fixing lugs,connecting to equipment and connecting lightning
shield to earth mat and earthing of fence posts,drilling and
connecting earthrods with - 50 x 8mm MS Flat

7C 200 Laying of earth mat including excavation of trenches,welding and 50 x 8mm GI Flat SED 7 d 54.77 0.55 RM 2.19 1.86 59.37 11874.00
fixing lugs,connecting to equipment and connecting lightning
shield to earth mat and earthing of fence posts,drilling and
connecting earthrods with 50 x 8mm GI Flat

8 15 Excavation of earth pit, putting cast iron pipe with flange on one Earth Pit SED 8 10868.41 108.68 Each 434.74 369.42 11781.25 176718.75
end ( as per relevant ISS ), of nominal dia 125 mm and 2.75
metres long inside the pit including supply and fixing of RCC
Collars 1mtr dia and 0.6 mtrs long inside the pit, and backfill the
pit in 25mm size granules of BH coke for full depth of the pit with
alternate layers of BH Coke and salt of 300mm thick (or back fill
with bentonite compound) around the earth pipe of 150mm on all
the sides of the pipe including cost and conveyance of BH Coke
(or bentonite compound), salt, C.I.Pipe and RCC collars, labour
charges for all operational and incidental items of work etc., as
directed by the engineer in charge. All earth pits should be
connected to the earth mat.

9 150 Laying of control cables of all sizes (from 2 core, 2.5 sqmm to12 Control Cable laynig SED 9 10.29 0.10 RM 0.41 0.35 11.15 1672.50
core,2.5 sqmm both copper and aluminium) in cable trenches
including cost of suitable metallic glands with rubber lining &
dressing. This includes running of cables in control room where
cables are run on cable racks in cable duct.

10 100 Cable termination to the switch-gear, marshalling boxes/panel Cu.. Cable Termination SED 10 a 28.08 0.28 Each 1.12 0.95 30.43 3043.00
terminal blocks/control & relay panels, LTAC panel, including
providing suitable ferrules and lugs as per specification (including
cost of ferrules and lugs).Note: Rate to be quoted for termination
of one core of cable at both ends.- 2.5 sq.mm. copper
11 5 Installation of lighting fixtures of 250 Watts HPSV of Crompton Lighting Fixtures SED 11 b 7237.58 72.38 Each 289.50 246.01 7845.47 39227.35
Greveas / Phillips make, on switchyard structures including cost
of lighting fixtures and cabling and connections

12 Erection of the following equipment at site including insurance


etc., and made fit for commissioning
12A 1 132 kV Circuit Breakers. Erection 132Kv CB SED 12 - 20989.00 209.89 Each 839.56 713.42 22751.87 22751.87
12B 3 132 kV Current Transformers. Erection 132kv CT SED 12 - 4304.00 43.04 Each 172.16 146.29 4665.49 13996.47
12C 3 132kV Potential Transformers. Erection 132kv PT SED 12 - 4856.00 48.56 Each 194.24 165.06 5263.86 15791.58
12D 3 132kV Lightning Arrestors. Erection 132kv LA SED 12 - 2028.00 20.28 Each 81.12 68.93 2198.33 6594.99
11
12E 3 132 kV Capacitive Voltage Transformers. Erection 132kv CVT SED 12 - 4606.00 46.06 Each 184.24 156.56 4992.86 14978.58
14
12F 1 132 kV Isolators with earth switch. Erection 132kv Isol. SED 12 - 8540.00 85.40 Each 341.60 290.27 9257.27 9257.27
with ES 16
12G 1 132 kV Isolators without earth switch. Erection 132kv Isol. SED 12 - 6703.00 67.03 Each 268.12 227.83 7265.98 7265.98
12H 0 132kV Wave Traps. w/o ES 132kv
Erection 18
SED 12 - #DIV/0! #DIV/0! Each #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Wavetrap 21
13 2 Erection of control/relay panels, LTAC panels, annunciation Erection - Panels SED 12 - 6661.00 66.61 Each 266.44 226.41 7220.46 14440.92
panels, PLCC&EPAX pannels etc., in the control room duly 36
mounting them on channels provided on the cable duct and
grouting them with foundation bolts.
14 3 Erection of marshalling box on the structures of equipment Erection Marshelling SED- 14 5526.65 55.27 Each 221.07 187.85 5990.84 17972.52
including cost of marshalling boxes Box
15 Dismantling of following euipment and devoluting to TLC stores
Erragadda including cost of handling, transport, insurance and all
other incidental chargs complete
15A 1 132 kV Circuit Breakers. 17755.00 177.55 Each 710.20 603.49 19246.24 19246.24
15B 3 132 kV Current Transformers. 3592.00 35.92 Each 143.68 122.09 3893.69 11681.07
15C 3 132kV Potential Transformers. 4144.00 41.44 Each 165.76 140.85 4492.05 13476.15
15D 3 132kV Lightning Arrestors. 1692.00 16.92 Each 67.68 57.51 1834.11 5502.33
15E 0 132 kV Capacitive Voltage Transformers. 5841.00 58.41 Each 233.64 198.54 6331.59 0.00
15F 1 132 kV Isolators with earth switch. 7246.00 72.46 Each 289.84 246.29 7854.59 7854.59
15G 1 132 kV Isolators without earth switch. 5895.00 58.95 Each 235.80 200.37 6390.12 6390.12
15H 0 132kV Wave Traps. 250.00 2.50 Each 10.00 8.50 271.00 0.00
15I 2 Contrl & relay panels mounted in control room 14275.00 142.75 Each 571.00 485.21 15473.96 30947.92
16 LS Writing of names in the control room for identification of rooms, Writing name 2000.00 20.00 Each 80.00 67.98 2167.98 2167.98
on panels, equipment, marshalling boxes, kiosks, with CT ratio
etc., & on maingates neatly with superior quality paint brushes &
labour etc., complete on the main gate with superior quality
synthetic enamel paint with two coats including cost of paint,
brushes and labour charges etc complete.
17 5 Supply of Insulation of Rubber mats of size 2m x 1m x 6mm Rubber mats SED 18 1200.00 12.00 Each 48.00 40.79 1300.79 6503.95
confirming to IS 5424/96 and laying in front of panels in the
Control Room
18 1 Supply and fixing of Glow sign board 10' x 4' including cost of Glow sign board 12000.00 120.00 LS 480.00 407.88 13007.88 13007.88
transportation to site labour charges etc., in complete finished item
of work.
19 3 Supply and fixing of Caution boards painted as' Danger ' made up Caution board 200.00 2.00 LS 8.00 6.80 216.80 650.40
of MS sheet size 300x200x2mm painted with superior quality
synthetic enamel paint of 2 coats including cost of paint, brushes
and labour charges etc ., in complete finished item of work.

19A 3 Supply and fixing of Caution boards painted as' On Line Clear ' Caution board 200.00 2.00 LS 8.00 6.80 216.80 650.40
made up of MS sheet size 300x200x2mm painted with superior
quality synthetic enamel paint of 2 coats including cost of paint,
brushes and labour charges etc ., in complete finished item of
work.
19B 3 Supply and fixing of Caution boards painted as' Load Relief ' Glow sign board 200.00 2.00 LS 8.00 6.80 216.80 650.40
made up of MS sheet size 300x200x2mm painted with superior
quality synthetic enamel paint of 2 coats including cost of paint,
brushes and labour charges etc ., in complete finished item of
work.
19C 3 Supply and fixing of Caution boards painted as' Break Down ' Caution board 200.00 2.00 LS 8.00 6.80 216.80 650.40
made up of MS sheet size 300x200x2mm painted with superior
quality synthetic enamel paint of 2 coats including cost of paint,
brushes and labour charges etc ., in complete finished item of
work.
20 2 Supply and fixing of 15 lbs CO2 portable fire extinguishers of Fire extinguisher SED 19 a 5100.00 51.00 Each 204.00 173.35 5528.35 11056.70
standard make with ISI certification like Fire flex / Sharathy
industries complete with first filling Horn and Hose.
20A 1 Supply and fixing of 50 lbs CO2 portable fire extinguishers (with Fire extinguisher SED 19 b 13900.00 139.00 Each 556.00 472.46 15067.46 15067.46
Trolly) of standard make with ISI certification like Fire flex /
Sharathy industries complete with first filling Horn and Hose.
21 40 Supply & Fixing of GI Flexible earth Bonds 150.00 1.50 Each 6.00 5.10 162.60 6504.00
'file:///conversion/tmp/scratch/383830001.xls'#$estm abstract TOTAL #DIV/0!

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.
Transportin, Loading & Unloading & Insurance Charges
Total Insuranc
Transpo Total
Loading Loading e@ Total
Dismantling rate No.Of rt Erection Dismantlin
Sno Description Cost Qty Erection Charges & & 0.5% on Erection
as per SSR Loads Charges cost per g Cost
Unloadi Unloadi cost & cost
@ unit
ng ng erection
SSR SSR
Total Total 1999.17
RATE Rate
1 132 KV Circuit Breaker 735630.00 1.00 12936.00 ### 9702.00 ### 1.50 2998.76 1311.00 1311.00 3742.83 20988.59 20989.00 17755.00
3 132 KV Current Transformer 89637.00 3.00 2847.00 8541.00 2135.25 ### 1.00 1999.17 328.00 984.00 1387.26 12911.43 4304.00 3592.00
(protection)
5 132 KV CT (metering) 150000.00 3.00 2847.00 8541.00 2135.25 ### 1.00 1999.17 328.00 984.00 2292.71 13816.88 4606.00
5841.00
6 132 KV Potential Transformer 200000.00 3.00 2847.00 8541.00 2135.25 ### 1.00 1999.17 328.00 984.00 3042.71 14566.88 4856.00
(metering) 4144.00
8 132 KV Lightning Arrestors 36033.00 3.00 1344.00 4032.00 1008.00 ### 0.50 999.59 164.00 492.00 560.66 6084.24 2028.00 1692.00
10 132 KV Isolator With Out E/S with 170500.00 1.00 5173.00 5173.00 3879.75 ### 1.00 1999.17 489.00 489.00 878.37 8539.54 8540.00
SCI 7246.00
11 132 KV Isolator With E/S With 193200.00 1.00 3233.00 3233.00 2424.75 ### 1.00 1999.17 489.00 489.00 982.17 6703.34 6703.00
SCI 5895.00
13 70 KN Disc Insulators 375.00 192.00 0.19 383.84 1.10 211.20 360.00 955.04 5.00
14 ACSR Moose/Zebra Conductor 220000.00 0.86 0.22 431.82 198.72 171.69 950.40 1553.91 1799.00
15 HTGS Earth Wire 25000.00 0.57 0.07 141.94 55.66 31.62 71.00 244.56 431.00
16 Copper control cables 100000.00 150.00 6.80 1020.00 0.02 29.99 19.65 2.95 75.01 1127.94 8.00
18 132 KV Wave Trap 125000.00 0.00 1344.00 0.00 1008.00 0.00 0.13 249.90 87.00 0.00 0.00 249.90 #DIV/0! 250.00
20 Control & Relay Panels 500000.00 2.00 1809.00 1760.00 1356.75 ### 3.00 5997.51 273.00 546.00 5018.09 13321.60 6661.00 14275.00

LEAD STATEMENT

Lead Distance 45 KM

Upto 5km 5 33.53


Every 5km beyond 5 up to 30km 25 125.75
Every 5km beyond 30km 15 62.85
222.13

Transport Charges for 9 MT 9 X 222.13 = 1999.17


or say 2000
Asst. Executive Engineer,
T.L.C.SD-Mahabubnagar.
APTRANSCO

From To
Assistant Executive Engineer Assistant Executive Engineer
TLC, SD - Mahabubnagar -1 Civil, TLC, SD - Mahabubnagar

Lr No AEE/TLC/SD - MBNR 1/F 220/33KV SNGTM SS/D No /10 Dt 29-12-10

SUB Erection of 220/33kv Singawattam SS - Civil quantities submitted - Estimate requested - Reg

The civil items work required for erection of 220/33kv Singottam SS are furnished as below. It is
requested to arrange to submit the estimate for civil quantities for the above SS.

S.NO Description Qty Reqd


1 220 KV TA 0
2 220KV TB 10
3 220KV TC 0
4 220KV isolator 5
5 220KV BP Boom 6
6 220KV BQ Boom 0
7 132KV TNS 8
8 132KV TND 0
9 132KV TA 0
10 132KV Isolator 0
11 132KV BNC 0
12 132KV BNS 4
13 132KV BN 0
14 132KV BA 0
15 CPL 23
16 33 KV TB 4
17 33 KV TC 13
18 33 KV TD 16
19 33KV BD Boom 43
20 CB
A 220kv 4
B 132kv 0
C 33kv 6
21 Stn Transformer 1
22 220kv Bay Kiosk 1
23 33kv Bay Kiosk 1
24 Control romm for 220/33kv SS 1
25 Cable duct in switch yard 275RM
26 PTR plinths for 20MVA transformers 2
27 Roads 250RM

Assistant Executive Engineer


TLC, SD - Mahabubnagar
NAME OF WORK :- ERECTION OF 132KV BAY EXTENSION IN132/33KV KOTHUR SS FOR SHAMSHABAD FEEDER

S.L. Labour Area LILA Labour Ind Area Erection


Std. Electl.
No. charges Allow. Cess Allowance charges
Item Short Discription Disc. No.
as per including
(SED No.) ssr- 25.00% 14.00% 1% 20% area
2009-10 allowance
(1) (2) (3) (5) (6) (7) (8) (9) (10)
16 a Erection 132Kv CB SED 12 - 2 8085.00 2021.00 1132.00 81.00 1617.00 12936.00
16 c Erection 132kv CT SED 12 - 3 1779.00 445.00 249.00 18.00 356.00 2847.00
16 e Erection 132kv PT SED 12 - 8 1779.00 445.00 249.00 18.00 356.00 2847.00
16 g Erection 132kv LA SED 12 - 11 840.00 210.00 118.00 8.00 168.00 1344.00
16 j Erection 132kv Isol. with Earth Switch SED 12 - 16 3233.00 808.00 453.00 32.00 647.00 5173.00
16 k Erection 132kv Isol. w/o Earth Switch SED 12 - 18 2910.00 728.00 407.00 29.00 582.00 4656.00
17 Erection of C&R Panels,LTAC
SED 12 - 36 1131.00 283.00 158.00 11.00 226.00 1809.00
panels,PLCC panels EPAX panels etc

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.

Weight of Structures & Bolts in Kgs


Weight of
Qty Weight of Bolts & Erection
Stubs/Foundation Structure Weight
S.NO Description reqd Nuts Weight
Bolts
Per Total Per Total Per Total
1 220 KV TA 0 203.57 0 1812.02 0 85.36 0 0
2 220KV TB 10 120.86 1208.6 1121.89 11218.9 51.13 511.3 0
3 220KV TC 0 177.01 0 1963.37 0 95.73 0 0
4 220KV isolator 5 60.8 304 1310.976 6554.88 43.72 218.6 0
15
5 220KV BP Boom 6 0 0 953.25 5719.5 51.74 310.44 0
6 220KV BQ Boom 0 0 0 1142.93 0 51.74 0 0

1 132KV TNS 8 92.84 742.72 869.41 6955.28 55.04 440.32 0


2 132KV TND 0 133.44 0 1015.7 0 55.04 0 0
3 132KV Isolator 0 37.56 0 606.85 0 29.84 0 0
8
4 132KV BNC 0 0 0 571.22 0 36.2 0 0
5 132KV BNS 4 0 0 619.56 2478.24 37.13 148.52 0
6 132KV BN 0 0 0 800.6 0 53.63 0 0
7 132KV BA 0 0 0 617.71 0 45.43 0 0

8 CPL 23 17.92 412.16 193.22 4444.06 12.3 282.9 0


9 33 KV TB 4 66.4 265.6 690.88 2763.52 47 188 0
10 33 KV TC 13 71.04 923.52 480.96 6252.48 30.4 395.2 0
11 33 KV TD 16 17.28 276.48 200.7 3211.2 12.87 205.92 0
56
12 33KV BD Boom 43 0 0 199.09 8560.87 26.6 1143.8 0
PTR Neutral & 33kv CT Support
13 6 150
Structure(if required) 0 900 0 0
14 Bolts & Nuts LS 0 0 80 80
4133.08 59058.93 3925 80
Struc CB Total
220kv towers 15 4 19
132kv Towers 8 0 8
33kv Towers & CPLs 56 6 62

2.Procurement of Raw Steel


Weight of Stubs/Foundation bolts 4133.08
Weight of Structuress 59058.93
TOTAL 63.19201 or say 63 MT

3.Weight Of Bolts & Nuts


Weight of Bolts&Nuts 3925
Add 2% Wastage 78.5
4003.5 Or say 4 MT
4.Sructure Erection
Erection Weight of Structures Structure parts 59058.93
Bolts & nuts 4003.5
Total 63062.43 Or say 63 MT

Stringing of 220, 132, 33 KV Bus


No of Bus Rqmt of No of Rqmt of
Description of he work Qty Cond/phase width cond ins /string Insulators
5.220 KV Twin Bus (Main) 0 2 34 0
5.220 KV Single Bus (Main) 1 1 34 102
5.220 KV Single Bus (Aux) 0 1 34 0
1 102 14 84
10.132 KV Single Main.Bus 0 1 36 0
6.132 KV Twin Bus (Main) 0 2 36 0
9.132 KV Twin Aux. Bus 0 2 12 0
10.132 KV Single Aux.Bus 0 1 12 0
0 10 0

pilot insulator for 132kv bus 0 10 0


0 0
6.33 KV Twin Bus 2 2 20 240
11.33 KV Twin Aux. Bus 0 2 12 0
7.33 KV Single Aux. Bus 2 1 20 120
7.33 KV Single Aux. Bus 2 1 12 72
7.33 KV Single Aux. Bus 2 1 36 216
8 648 4 192
Total requirement with wastage 750 192
Or say 750 192

EARTH WIRE
No of EW per
Length/jump Rqmt of
Qty main
er E/W
struc strruc
220kv 2 0.036 0.072 10 18 0.18
220kv 12 0.018 0.216
132kv 14 0.02 0.28 8 12 0.1
Total 28 0.568 0.848
or say 1 KM
REQUIREMENT OF JUMPERS AND CONDUCTOR
220KV 132KV 33kv
Number of Feeder bays 2 0 4
Number of bus coupler bays 0 0 0
Number of Transformer bays 2 0 2
Number of PTs 1 0 1

For Feeder Bays


220KV 33KV
Jumper Jumper
Lengt
With W/O conductor Length With W/O conductor
h
clamp clamp clamp clamp
Line - Las 6 3 0 18 1 3 0 3

line - Isoaltor 6 0 3 18 0 0 0 0
Line - WT 6 0 0 0 0 0 0 0
WT - Isolator 5 0 0 0 0 0 0 0
line - Isoaltor 6 0 0 0 2 3 0 6
Isolator - CT(P) 3 0 3 9 2 0 3 6
CT(P) - CT (M) 3 0 3 9 2 0 3 6
CT (M) - PT (M) 3 0 3 9
PT (M) - CB 3 0 3 9
CB - iso 4 0 3 12 3 0 3 9
Iso - Bus 6 3 0 18 3 3 0 9
Total / Bay 6 18 102 9 9 39
Grand Total for all bays 0 0 0 36 36 156

TOTAL REQUIREMENT OF JUMPERS & CONDUCTOR


132KV 33KV
Jumper Jumper
With W/O conductor With W/O conductor
clamp clamp clamp clamp
For Bus 0 648
For Feeder Bays 0 0 0 36 36 156
For Trans Bays 0 0 0 0 0 0
For PTs 0 0 0 6 9 15
For Bus - Bus Jumper 6 0 36 0 0 0
Total with single cond 6 0 36 42 45 171
Grand Total of Cond 36 819

132kv 33KV
Total no of single Zebra/Moose jumpers with clamps 6 42 48
Total no of single Zebra/Moose jumpers without clamps 0 45 45
Total no of twin Zebra/Moose jumpers with clamps 0 0 0
Total no of twin Zebra/Moose jumpers without clamps 0 0 0
Total requirement of conductor 36 819 855
Total requirement of conductor including wastage @1% 863.55 864

Dismantling of Jumpers of Single Zebra 21

REQUIREMENT OF EARTH FLAT


EARTH MAT 25
100X16MS 86
18 18
50x8 MS Hor 65
50x8 GI Vert 71
136 25
Equipment Qty Rqmt per equipment Total requirement
GI MS GI MS
100x16 50x8 100x16 50x8 100x16 50x8 100x16 50x8
Las 3 2.75 3 2.5 5 8.25 9 7.5 15
CVT 0 0 0 0 5 0 0 0 0
CVT - MB 0 0 6 0 5 0 0 0 0
Wave Trap 0 0 8.5 0 5 0 0 0 0
Isolators 2 0 21 0 5 0 42 0 10
Iso - MOM Box 2 0 5 0 5 0 10 0 10
Iso - ES box 1 0 5 0 5 0 5 0 5
CTs (METERING) 3 0 8.5 0 5 0 25.5 0 15
CT - MB 1 0 6 0 5 0 6 0 5
PTs 3 0 8.5 0 5 0 25.5 0 15
PT - MB 1 0 6 0 5 0 6 0 5
CTs (PROTECTION) 3 0 8.5 0 5 0 25.5 0 15
CT - MB 1 0 6 0 5 0 6 0 5
CB - 132kv 1 0 6 0 5 0 6 0 5
CB - 132kv box 1 0 6 0 5 0 6 0 5
Cable trench 50 0 0 0 1 0 0 0 50
132kv main structure 2 0 2.5 0 5 0 5 0 10
Earth pits (Total) 15 3.5 0 0 2.5 52.5 0 100 37.5
60.75 177.5 107.5 207.5

Total requirement of Earth Flat


For Earth mat 0 0 86 136
For equipment & structure earthing 60.75 177.5 107.5 207.5
TOTAL 60.75 177.5 193.5 343.5
Total requirement of earth flat including 2% extra towards over laps 62 181 197 350

10.Laying Of Earth Mat With The Following Sizes of MS/GI Flats


a)100X16 MM MS Flat 197 200 RMT
b)100X16 MM GI Flat 62 30 RMT
c)50X8 MM MS Flat 350 325 RMT
d)50X8 MM GI Flat 181 200 RMT

e.Excavation Of Earth Pits


220KV 132KV 33kv
Number of Feeder bays 2 0 4
Number of bus coupler bays 0 0 0
Number of Transformer bays 2 0 2

CB &
Qty Transformer LAS
CTS Extra Pits
Transformer Bay 0 0 0 0
132 KV Bay 0 0 0 0
33 KV Bay 4 4 2 0
132 KV Bus PT 0 0
33 KV Bus PT & stn Tf 0 0
Control Room 0
Equilising earth pits 2 0
0 10 4 1
Total No.Of Earth Pits 15

LAYING OF CONTROL CABLES

length No of No of cables required


bays 2core 4core 6core 10core 12core

132kv feeder 150 0 3 8 8 2


loops 15 0 2 4 5
Sub total 0 0 0 0 0
Lighting 30 5
150
Grand Total 150 0 0 0 0

11.Laying Of Control Cables


Total KM of 12CX2.5 Sqmm Copper Control Cable 0 RMT
Total KM of 10CX2.5 Sqmm Copper Control Cable 0 RMT
Total KM of 6CX2.5 Sqmm Copper Control Cable 0 RMT
Total KM of 4CX2.5 Sqmm Copper Control Cable 0 RMT
Total KM of 2CX2.5 Sqmm Copper Control Cable 150 RMT
Total KM of copper control cable required 150 RMT
or say 0.15 Km
13.Cable Terminations to the Switch Gear
2.5 Sqmm Copper with copper lugs each core at both ends 100 Each
120 Sqmm Aluminium with Aluminium lugs each core at both end 0 Each

Erection of change over switch 63A 3phase 0 Each

14.Installation of Ligtning Fixtures


Installation Of Lightning Fixtures 5 NO.S

15.Erection Of the Following Equipment


132 KV Circuit Breaker 1 Nos
132 KV Current Transformer(protection) 3 Nos
132 KV Potential Transformer (metering) 3 Nos
132 KV Lightning Arrestors 3 Nos
132 KV Current Transformer(metering) 3 Nos
132 KV isolator With E/S 1 Nos
132 Kv Isolator With Out E/S 1 Nos
132 KV Wave Trap 0 Nos
132 KV Solid Core Insulators 18 Nos
Line matching unit 0 Nos

Dismantling of following equipment


132 KV Circuit Breaker 1 Nos
132 KV Current Transformer(Feeder) 3 Nos
132 KV Potential Transformer 0 Nos
132 KV Lightning Arrestors 3 Nos
132 KV Capacitance Voltage Transformer 2 Nos
132 KV isolator With E/S 1 Nos
132 Kv Isolator With Out E/S 1 Nos
132 KV Wave Trap 1 Nos
132 KV Solid Core Insulators 18 Nos
Line matching unit 1 Nos
132 KV Control & Relay Panel for feeder 2 Sets
Marshalling Boxes 3 Nos

16.Erection Of the Control & Relay Panels


220 KV Control & Relay Panel 0 Sets
132 KV Control & Relay Panel for feeder 2 Sets
Total No.Of Control & Relay Panels 2 Sets

Erection Of the Following


25.Marshalling Kiosk 0 Each
19.Marshalling Boxes 3 Each

26.Supply & Fixing of 15 lbs capacity CO2 portable fire


2 Each
extinguishers (with out trolleys)

27.Supply & Fixing of 50 lbs capacity CO2 portable fire


1 Each
extinguishers (with trolleys)

30.Supply & Fixing of insulation rubber mats and laying in the


5 Each
control room

34.Supply & Fixing of Flexible GI earth Bonds 40 Each

36. Writing of Names in the control Room & Switch Yard 25 Each

39.Supply and fixing of glow sign board 10' X 4' 1 Each

40.Supply of caution Boards


A) DANGER with logo 3 Each
B) LINE CLEAR 3 Each
C) BREAK DOWN 3 Each
D) LOAD RELIEF 3 Each

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.
ELECTRICAL PORTION

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


ABSTRACT

Material Portion 15976145.97


Labour Portion #DIV/0!
Total #DIV/0!
Add 3% Contingencies #DIV/0!
Add 10.75% General & Adm Charges #DIV/0!
Grand Total #DIV/0!
Or Say #DIV/0!

MATERIAL PORTION

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.

SNO Description Material QTY Rate Per Amount


3 GI Structure parts 63 59394.13 Each 3741830.19
4 Supply of GI bolts & nuts 4 86629.00 MT 346516.00
5 Supply of 100x16mm MS earth flat 200 415.80 RMT 83160.00
6 Supply of 100x16mm GI earth flat 30 622.45 RMT 18673.58
7 Supply of 50x8mm MS earth flat 325 93.00 RMT 30225.00
8 Supply of 50x16mm MS earth flat 200 139.22 RMT 27844.20
9 132 KV Circuit Breaker 1 735630.00 Each 735630.00
12 132 KV Current Transformer(protection) 3 89637.00 Each 268911.00
15 132 KV Potential Transformer (metering) 3 143784.00 Each 431352.00
17 132 KV Lightning Arrestors 3 36033.00 Each 108099.00
19 132 KV Current Transformer(metering) 3 220131.00 Each 660393.00
20 132 KV isolator With E/S 1 102118.00 Each 102118.00
21 132 Kv Isolator With Out E/S 1 79425.00 Each 79425.00
23 132 KV Wave Trap 0 125000.00 Each 0.00
24 33 KV/400 V Station Transformer(100 KVA) 1 250998.00 Each 250998.00
25 132 KV Solid Core Insulators 18 9191.00 Each 165438.00
31 70 KN Disc Insulators 192 375.00 Each 72000.00
32 ACSR Moose Conductor 0 260000.00 KM 234000.00
33 ACSR Moose/Zebra Conductor 0.9 220000.00 KM 124960.00
34 HTGS Earth Wire 0.568 25000.00 KM 14200.00
36 Copper Control Cable 0.15 100000.00 KM 15000.00
15976145.97

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.
DETAILED ESTIMATE
Sno Description Of Work Qty Rate Per
Electrical Portion
2 Procurement of raw steel such as MS angles, plates, channels, RS joist, MS rounds etc and 63 59394.00
fabrication and galvanisation of main and auxilary structure, stubs, stub setting template and
foundation bolts, U bolts with suitable galvanised nuts for foundation
3 Providing and fixing of GI bolts & nuts including cost of material for fabricated structures. 4 86629.00
Setting of stubs with stub setting template for sub-station structure: Erection of stub template,
fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of
stub setting template, dismantling of template after completion of initial curing of CC

a. 220kv stuctures 15 3153.00


b. 132kv structures 8 2263.00
c. 33kv structures and CPLs 56 566.00
4 Erection of structures fabricated from RS Joists, channels, M.S Angles. 63 2248.00 MT
5 Hoisting of insulators and hard ware stretching the conductor and stringing of 132 KV main Bus 0 16566.00
comprising of Three phases with Single Zebra/Moose conductor to a tensin of 900Kgs including
fixing of spacer clamps( The approximate length of bus section will be 40mts.)
6 Hoisting of insulators and hard ware stretching the conductor and stringing of 33 KV Main Bus 2 26687.00 E
comprising of Three phases with Twin /Moose conductor to a tensin of 900Kgs including fixing
of spacer clamps( The approximate length of bus section will be 20mts.)

7 Hoisting of insulators and hard ware stretching the conductor and stringing of 132 KV Aux.Bus 2 14737.00
comprising of Three phases with Single Zebra/Moose conductor to a tensin of 900Kgs including
fixing of spacer clamps( The approximate length of bus section will be 40mts.)

8 Fixing hard ware, stretching the groundwire and stringing of over head earth bus from pinacle to 28 2035.00 E
pinacle including supply of tension clamps
9 Connecting equpiment to bus and/or another equipment with Single Moose/Zebra including
measuring,cutting, clamping & also hoisting of suspension insulator assembly to support the
conductor whereever necessary.
a) with out clamps 45 268.00 E
b) with clamps 48 581.00 E
11 Laying of earth mat including excavation of trenches, welding & fixing of lugs, connecting to
equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and
connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with
the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods
a) 100 X1 6 MM MS Flat 197 568.00 RMT
b) 100 X 16 MM GI Flat 62 692.00 RMT
c) 50 X 8 MM MS Flat 350 148.00 RMT
d) 50 X8 GI Flat 181 194.00 RMT
12 Excavation of earth pits, putting cast iron pipe with flange on one end ( as per ISS 7181/74), of 15 10868.00 0
nominal dia 125mm & 2.75 Mts long inside the pit and back filing the pit with BH coke Incl.
COST OF C.I PIPES & BH COKE
13 Laying of control cables of all sizes (from 2core, 2.5 sqmm to 12 core, from 2.5sqmm to 120Sq
mm of both copper and aluminium) in cable trenchesincluding cost of suitable metallic glands
and rubber lining & dressing. Note : This incl. running the cable in control room where cables
are run on cable racks in the cab duct
a. 2.5Sq mm 150 10.29 RMT
b. 70Sq mm 0 28.00
15 Cable termination to the switch gear, marshalling boxes/panel terminal blocks/C&R panels,
LTAC panel incl. providing suitable ferrules and lugs as per specification (incl. cost of ferrules
and lugs Note :
Rate to be quoted is for termination of one core of cable at both ends)
a) 2.5 sqmm copper with copper lugs each at both ends 100 28.00 E
b) 4 C X 120 sqmm Aluminium with Aluminium lugs each core at both ends 0 102.00 E
16 Installation of lighting fixtures on switch yard structures incl. cost of lightning fixtures & cabling 5 7238.00 E
connections
17 Erection of the following equipment incl. loading & unloading, transport to site from
APTRANSCO's stores and the incidental handling charges
132 KV Circuit Breaker 1 10268.00 E
33 KV Circuit Breaker 0 3183.00 E
132 KV Current Transformer 3 2259.00 E
33 KV Current Transformer 0 822.00 E
132 KV Potential Transformer 3 2259.00 E
33 KV Potential Transformer 0 822.00 E
132 KV Lightning Arrestors 3 1067.00 E
33 KV Lightning Arrestors 0 453.00 E
132 KV Capacitance Voltage Transformer 3 2259.00 E
132 KV isolator With E/S 1 4106.00 E
132 Kv Isolator Without E/S 1 3696.00 E
33 KV Isolator 0 1335.00 E
132 KV Wave Trap 0 1335.00 E
33kv Solid core insulator 6 453.00 E
18 Erection of control/relay panels LTAC panels annunication panels, PLCC&EPAX panels etc., in 2 1436.00 E
the control room duly mounting them on channels & grouting them with foundations bolts to be
supplied by the contractor incl.GI channels.
Erection of line matching unit 0 298.00 E
19 Erection of the battery set incl. loading & unloading, transport to site from APTRANSCO's stores
and the icidental handling charges
220 V 80 Ah Battery 0 8830.00 E
48 V PLCC Battery Set 0 4726.00 E
20 Erection of the battery charger incl. loading & unloading, transport to site from APTRANSCO's
stores and the incidental handling charges
a) 220 V Battery Charger with DC Distribution 0 3183.00 E
b) 48 V Battery Charger 0 1455.00 E
21 Erection of Marshalling boxes on the structures of equipment including cost of Marshalling boxes 3 5527.00 E

22 Erection of Station Transformer including cost of Stn Ptf, HG fuse set etc in complete shape 0 288930.00 E
23 Supply & fixing of CT operated electronic energy meter for 250KVA 33kv/400V-100/5A class of 0 10607.44 E
accuracy, fixed in out door pilfer proof box
24 Supply & Erection of LT Distribution box containing three sets for distribution with MCCB Units 0 11877.00 E

25 Erection of Lightning pillar box in the switchyard on foundation to be laid as per drawings no at 0 10899.00 E
contractors cost including cost of all materials required that includes cost of pillar box & cement

26 Supply & Fixing of 15 lbs capacity CO2 portable fire extinguishers (with out trolleys) complete 2 5100.00 E
with first filling Horn & Hose
27 Supply & Fixing of 50 lbs capacity CO2 portable fire extinguishers 9with trolley) complete with 1 13900.00 E
first filling Horn & Hose
28 Fabrication of name board for SS with 16 SWG MS Tin and support framing with suitable angle 0 17200.00 E
and side angles 10 feet length for erection of the name board with suitable colours indicating the
particulars of SS including erection complete
29 Supply of MDF(Medium density Fibre) boards with 12mm thick 3' X 4' size with teakwood 0 12000.00 E
beading and painting with two coats of white paint and drawings of SS single line diagram with
various colours.
30 Supply & Fixing of insulation rubber mats and laying in the control room 5 1200.00 E
31 Supply & Fixing of GI Flexible earth Bonds 40 150.00 E
32 Supply & Fixing of Copper Flexible earth Bonds suitable for PTR Neutrals 0 500.00 E
Supply and fixing of threaded LV bushing clamps 0 3000.00 E
33 Writing of names in the control room for identification of rooms on panels, equipment, 25 50.00 LS
marshalling boxes, kiosks, with CT Ratio etc., & on main gates neatly with superior quantity
paint brushes & labour etc., complete
34 Supply and fixing of keyboard made up of teak wood of size 750X500X250 mm with wood 0 5000.00 E
framed glass shutters, lock & key arrangement for providing of all keys including cost of
transportation to site labour charges etc. in complee finished item of work as directed by engineer
at site
35 Supply and fixing of glow sign board 10' X 4' including cost of transportation to site labour 1 12000.00 E
charges etc. in complee finished item of work
36 Supply & fixing of caution boards made up of M S sheet size 300X200X2 mm painted with
superior quality synthetic enamel paint of 2 coats including cost of paint , brushes and labour
charges etc in complete as follows
A) DANGER with LOGO 3 200.00 E
B) LINE CLEAR 3 200.00 E
C) BREAK DOWN 3 200.00 E
D) LOAD RELIEF 3 200.00
Supply and fixing of "Ajanta" quartz wall clock with music bell. 0 450.00
Supply of furniture (GODREJ make) in the control room 0 100000.00
Supply of tool box containing spanners cutting pilers etc.,
Supply of latest Pentium personal computer with all accessories, laser printer, 0 57000.00
UPS, computer table, printer table and computer chair
Supply including transportation and installation of 1.5 T Air conditioners (Split 0 30000.00
Type ) (LG/Carrier/Voltas/Samsung)complete with cable work etc and with
stablizer

Add 2.8% W.C.T


Add 12.36% OF 33% total as S.T
Total
Or Say

Assistant Executive Engineer,


T.L.C.SD - Mahabubnagar.
Amount

3741822.00

346516.00

47295.00
18104.00
31696.00
141624.00
0.00

53374.00

29474.00

56980.00

12060.00
27888.00

111896.00
42904.00
51800.00
35114.00
163020.00

1542.90
0.00

2800.00
0.00
36190.00

10268.00
0.00
6777.00
0.00
6777.00
0.00
3201.00
0.00
6777.00
4106.00
3696.00
0.00
0.00
2718.00
2872.00

0.00

0.00
0.00

0.00
0.00
16581.00

0.00
0.00

0.00

0.00

10200.00

13900.00

0.00

0.00

6000.00
6000.00
0.00
0.00
1250.00

0.00

12000.00

600.00
600.00
600.00
600.00
0.00
0.00

0.00

0.00

5140115.27
143923.23
209655.02
5493693.52
5493694.00

utive Engineer,
abubnagar.
ANNEXURE – VII

(I). Loading / Unloading of materials from departmental / Private vehicles in to the stores
yard and stacking and vice-versa

Sl.

No. Description of Item Unit


-1 -2 -3
I Cement MT
2 All othe materials
(I) Steel MT
(ii) Tower parts MT
(iii) RS Joists and rail poles and MS Sheets pf various sizes. MT

3 Cable / Conductor drums (for loading / un loading )


a Panther ACSR Each
Drum
b Zebra ACSR Each
Drum
c Moose ACSR Each
Drum
d Moose ACSR (Huge Drums of 1.75KM and above) Each
Drum
e Earth wire Each
Drum
f Control cables up to 6 Core Each
Drum
g Control cables above 6 Core Each
Drum
h 3 1/2 Core LTAC cable drum Each
Drum
4 Other materials received in cases.
(i) Case weighing not more than 100kgs. Each
case
(ii) Case weighing from101kgs to 500kgs. Each
case
(iii) Case containg fragile items and weighing more than Each
501kgs and up to 1MT case
(iv) for LTAC panel Each
(v) 70/120/160 KN disc insulator (Normal) Each
(vi) 70/120/160 KN disc insulator (Anti- fog) Each
(vii) Loading / Un loading and stacking charges for 70KN /
120KN SRC insulators.
(a) 132kV Each
string
(b) 220kV Each
string
(viii) Loading / Un loading and stacking charges for 120KN / Each
160KN SRC insulators for 400kV . string
5 Cases containing Control & Relay Panels
(a) 33kV Each
(b) 132kV and 220kV Each
6 Cases containing CTs, PTs, CVTs
(i) 11kV to 33kV Rating Each
case
(ii) Above 33kV and up to 132kV Each
case
(iii) 220kV Rating Each
case
7 Cases containing LAs
(i) 33kV Each
case
(ii) 132kV Each
case
(iii) 220kV Each
case
8 Loading / Un-Loading of
1 33kV Breaker Each
set
2 132kV CB Each
set
3 220kV SF6 CB Each
set
4 Station Transformer (100KVA) Each
set
5 Station Transformer (250KVA) Each
set
6 132kV Wave Trap Each
7 220kV Wave Trap Each
8 220V 80AH Battery (Conventional) Set
9 220V 80AH Battery (VRLA) Set
10 220V 200AH Battery Set
11 220V 400AH Battery Set
12 48V PLCC battery 150 AH Set
13 48V PLCC battery 250 AH Set
14 48V Battery Charger 10A Set
15 48V Battery Charger 35/50A Set
16 48V Battery Charger 100A Set
17 220V Battert Charger with DC distribution Board Set
18 DCDB for battery Charger. Each
19 132kV Hardware single Set
20 132 KV Hardware double Set
21 220 kV Hardware single Set
22 220 KV Hardware double Set
23 220 KV Isolators, without insulators including Set
machanism box
24 220kV Solid core insulators Each
25 132 KV Isolators (without soild core insulators) Each
26 132kV Solid core insulators Each
27 33 KV Isolators (without soild core insulators) Each
28 33kV Solid core insulators Each
29 Vibration dampers, mid span compression joints, repair 100 Nos
sleeves, clamps & connectors etc
30 Capacitor Banks
a 5 MVAR Set
b Neutral C.T. Each
31 Scrap items like MS Scrap, GI Scrap, Ferrous Scrap Per MT
etc,.
32 Scrap items like Conductor scrap, Earth wire Scrap, Per MT
etc,.
33 Single channel PLCC Panel Each
34 Twin Channel PLCC Panel Each
35 Phase to Phase couplings units (LMU) Set
36 Bolts & Nuts weighing 50 Kgs bags including springs Each
washers, flat washers. bag
37 3 1/2 Core LTAC Cable bits (loose) by measuring and Mts
load / unload
38 Cable bits (loose) up to 6 Core by measuring and load / Mts
un load
39 Cable bits (loose) above 6 Core by measuring and Mts
load / un load
40 Copper Scrap Per MT
41 Battery Scrap Per MT
42 Capacitor units Scrap Each
43 33kV Breaker Limb Each
44 132kV Breaker Limb Each
45 220kV Breaker Limb Each
46 Tyres scrap of all sizes Each
47 Empty oi drums Barrel
48 Full oil drums Barrel

(III). Crane Hire charges:(for departmental works at the premises)

Sl. Description of Item Unit


No.
-1 -2 -3
a) For 2 to 8 Tonne Capacity crane
i.For Ist hour Hour
ii.For every hour or part thereof after Ist hour Hour
b) For 8 to 20 Tonne Capacity crane
i.For Ist hour Hour
ii.For every hour or part thereof after Ist hour Hour
c) For above 20 Tonne Capacity crane
i.For Ist hour Hour
ii.For every hour or part thereof after Ist hour Hour

(IV). Sparing of Departmental vehicle to the contractor:

Sl. Description of Item Unit


No.
-1 -2 -3
1 Sparing of Departmental vehicle(Lorry) to the contractor Per day
is under emergency only. When departmental lorry is
engaged to the Contractor on a particular day an
amount of Rs2102/- per day or part there of should be
recovered for a total KM run up to 100KM on that day
plus for every additional KM at Rs.17.50 per KM Which
ever is higher. The run to be worked out taking initial
reading at starting point and closing reading after
returing the same starting point duly completing the
transport work.
engaged to the Contractor on a particular day an
amount of Rs2102/- per day or part there of should be
recovered for a total KM run up to 100KM on that day
plus for every additional KM at Rs.17.50 per KM Which
ever is higher. The run to be worked out taking initial
reading at starting point and closing reading after
returing the same starting point duly completing the Plus
transport work. addition
al KM

Note:-

When the departmental lorry is used for transport of


fragile and costly equipment, they have to be insured by
the contractor in first place before transport and the
1. same will be claimed in the respective work bill.

If the crane is given on hire to other than APTRANSCO


works, the rate is a minimum of Rs18984/-(Rs.791/-per
hr X 24Hrs) + (Fuel cost & lubricants) per day or part
there of and the time is to be reckoned from the time of
2 leaving department premises till reaching back.

ANNEXURE -VIII

TRANSPORT OF PROTECTION AND CONTROL EQUIPMENT & LINE MATERIALS

The following are the minimum materials / equipment, for each load
One Load=9.0MT
1 CTs, PTs, & CVTs:
a). 220kV
b).132kV
c).33kV

NOTE: For transport of 220kV CTs, PTs &CVTs extra provison of Rs.197/- may be
added for each load towards labour for clearing the obstructions like electrically and telephone l

2 SF6 Circuit Breakers:


a). 220kV
b).132kV
c).33kV
3 Isolators with or without Earth switch including post type insulators:
a). 220kV
b).132kV
c).33kV
4 Lighting Arrestors:
a). 220kV
b).132kV
c).33kV
5 Control & Relay panels:
6 ACSR Conductor and Earth wire drums:
a)ACSR moose
b)ACSR Zebra
c)ACSR Panther
d)Earth wire
e)CABLE DRUMS
7 Solid Core Insulators
(a) 70 KN
(b) 120KN
8 Silicon Rubber Insulators
(a) 70 KN
(b) 120KN
9 Wave Traps
a). 220kV
b).132kV
Private vehicles in to the stores

SS Rate for 2009-10 (Rs.)


Loading Un
loading
-4 -5
66 77

131 131
131 131
131 131

164 164

230 230

230 230

262 262

98 98

98 98

131 131

87 87

87 87

164 164
328 262

219 219
1.1 1.1
2.2 2.2

2 2

2 2

3 3

219 219
273 273

66 66

328 328

492 492

15 15

164 164

219 219

656 656

1311 1311

1639 1639

273 273

328 328

87 87
328 328
546 546
383 383
600 600
874 874
219 191
328 273
219 219
273 273
383 383
328 328
109 109
7.7 7.7
7.7 7.7
10.9 10.9
10.9 10.9
328 328

44 44
246 246
27 27
109 109
3 3
109 109

874 874
60 60
164 164

219 219

164 164
219 219
109 109
5 5

0.55 0.45

0.5 0.5
0.75 0.75

131 131
137 137
5 3
164 164
273 273
393 393
13.1 6.6
4.6 4.6
27.3 27.3

at the premises)

SS Rate for 2009-


10 (Rs.)
-4

1742
791

2716
905

4188
1472

SS Rate for 2009-


10 (Rs.)
-4
2102
17.5

NT & LINE MATERIALS

r each load

2 Nos.
3 Nos.
12 Nos.

f Rs.197/- may be
tructions like electrically and telephone lines as the equipment are very tall.

1/2 sets
2/3 sets
1 No.
type insulators:
1 set in 2 Loads.
1 No.
8 Nos.
6 Nos.
6 Nos.
24 Nos.
6 Nos.

3Nos.
4Nos.
6Nos.
8Nos.
10Nos.

- 1000 Nos.
- 800 Nos.

- 275 Nos.
- 228 Nos.

6 Nos.
16 Nos.
TENTATIVE DEVIATION STATEMENT
Name of the work : Erection of 220/132KV SUB-STATION AT JURALA
Name of the Coctractor : M/S.STANDARD CONSULTANTS LIMITED, Hyderabad
Contract Award No. LR. No. CPT 210/SE-PM-I/220KV JURALA SS/RC -3920/2008 Dt. 4-12-2008.
L.S. Agrmt No. /2008 - 09 of SE/TLC/HYDERABAD.

Above 25% with Remarks/


Upto 25% 4.99% Excess Less Reasons
Sl.No. DESCRIPTION tender %age
for excess
Qty Rate Amount Qty Rate Amount Qty Amount Qty Amount or less Qty.
1 2 7 8 9 10 11 12 15 16 17 18 19
1 #REF! 4.5 2796.00 12582.00 -3 2172.24 -5430.61 2 5592.00
2 Erection of structures fabricated from RS Joists,
channels, M.S Angles. 21.8 2248.00 49006.40 -46 1320.77 -60755.61 -24 -54401.60

3 Hoisting of insulators and hard ware stretching the


conductor and stringing of 220 KV Bus comprising of
Three phases with Single Zebra/Moose conductor to a
tensin of 900Kgs including fixing of spacer
clamps( The approximate length of bus section will be 0.75 16572.37 12429.28 -3 9989.80 -27471.95 -2 -33144.74
40mts.)

4 Hoisting of insulators and hard ware stretching the


conductor and stringing of 132 KV Bus comprising of
Three phases with Twin Zebra/Moose conductor to a
tensin of 900Kgs including fixing of spacer
clamps( The approximate length of bus section will be -2.00 33433.29 -66866.58 0 19936.03 0.00 -2 -66866.58
40mts.)

5 Hoisting of insulators and hard ware stretching the


conductor and stringing of 132 KV Aux.Bus
comprising of Three phases with Single Zebra/Moose
conductor to a tensin of 450Kgs including fixing of
spacer clamps( The approximate length of bus section -1 26687.00 -26687.00 -1 17288.97 -17288.97 -2 -53374.00
will be 40mts.)

6 Fixing hard ware, stretching the groundwire and


stringing of over head earth bus from pinacle to pinacle 7.5 2035.00 15262.50 -10 1676.69 -15928.56 -2 -4070.00
including supply of tension clamps

7 Connecting equpiment to bus and/or another equipment


with Single Moose/Zebra including measuring,cutting,
clamping & also hoisting of suspension insulator
0 0.00 0.00 0 0.00 0.00 0 0.00
assembly to support the conductor whereever
necessary.

(a) a) with out clamps 22 268.00 5896.00 -65 173.23 -11260.18 -43 -11524.00
(b) b) with clamps 27.25 581.00 15832.25 -88 342.27 -30205.10 -61 -35441.00
8 Connecting equpiment to bus and/or another equipment
with Twin Zebra/Moose including measuring,cutting,
clamping & also hoisting of suspension insulator
assembly to support the conductor whereever
necessary.

b) with clamps -42.00 0.00 0.00 0 342.27 0.00 -42 0.00


9 Laying of earth mat including excavation of trenches,
welding & fixing of lugs, connecting to equipment &
connecting lightninig shield to earthmat & earthing of
fence posts, driling and connecting earthrods including
connecting cast iron pipes as per
Drg.Drg.No.SET(SS)1/99 with the following sizes of
M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods

a) 100 X1 6 MM MS Flat
-653.00 568.00 -370904.00 0 31.50 0.00 -653 -370904.00

b) 100 X 16 MM GI Flat
-238.00 692.00 -164696.00 0 31.50 0.00 -238 -164696.00

c) 50 X 8 MM MS Flat
1000 148.00 148000.00 -4650 25.20 -117168.84 ### -540200.00

d) 50 X8 GI Flat -2219.00 194.00 -430486.00 0 25.20 0.00 ### -430486.00


10 e) Excavation of earth pits, putting cast iron pipe with
flange on one end ( as per ISS 7181/74), of nominal dia
125mm & 2.75 Mts long inside the pit and back filing
the pit with BH coke Incl. COST OF C.I PIPES & BH -46.00 10868.00 -499928.00 0 6387.59 0.00 -46 -499928.00
COKE

11 Laying of control cables of all sizes (from 2core, 2.5


sqmm to 12 core, 2.5sqmm both copper and allminium)
in cable trenches.
Note : This incl. running the cable in 6500 10.29 66859.00 ### 7.95 -257109.49 ### -265893.10
control room where cables are run on cable racks in the
cab duct

12 Laying of Power cables of all sizes (4 C X 120 sqmm


Aluminium cable)
Note : This incl. running the
cable in control room where cables are run on cable
racks in the cab duct

a) upto 50 sqmm
0 0.00 0.00 0 0.00 0.00 0 0.00

b) above 50 sqmm
-250.00 10.85 -2712.50 0 11.23 0.00 -250 -2712.50

13 Cable termination to the switch gear, marshalling


boxes/panel terminal blocks/C&R panels, LTAC panel
incl. providing suitable ferrules and lugs as per
specification (incl. cost of ferrules and lugs

Note : Rate to be quoted is for termination


of one core of cable at both ends)

a) 2.5 sqmm copper with copper lugs each at both ends


-3400.00 28.00 -95200.00 0 28.00 0.00 ### -95200.00

b) 4 C X 120 sqmm Aluminium with Aluminium lugs


each core at both ends -50.00 102.00 -5100.00 0 0.00 0.00 -50 -5100.00

14 Installation of lighting fixtures on switch yard


structures incl. cost of lightning fixtures & cabling -20.00 7238.00 -144760.00 0 7352.45 0.00 -20 -144760.00
connections
15 Erection of the following equipment incl. loading &
unloading, transport to site from APTRANSCO's stores
and the incidental handling charges

220 KV Circuit Breaker -6 10268.00 -61608.00 0 10268.00 0.00 -6 -61608.00


a) 132 KV Circuit Breaker -3 22096.72 -66290.16 0 22096.72 0.00 -3 -66290.16
220 KV Current Transformer 5 4564.07 20538.32 1 4564.07 4564.07 6 25102.39
c) 132 KV Current Transformer 3 2259.00 6777.00 -12 2259.00 -27108.00 -9 -20331.00
220 KV Potential Transformer 1 4161.44 3121.08 -4 4161.44 -15605.40 -3 -12484.32
e) 132 KV Potential Transformer 0 2259.00 0.00 0 2259.00 0.00 0 0.00
220 KV Lightninig Arrestors -18 2267.46 -40814.28 0 2267.46 0.00 -18 -40814.28
g) 132 KV Lightning Arrestors -9 1067.00 -9603.00 0 1067.00 0.00 -9 -9603.00
h) 33 KV Lightning Arrestors -3 453.00 -1359.00 0 453.00 0.00 -3 -1164.36
220 KV Capacitance Voltage Transformer -12 4411.52 -52938.24 0 4411.52 0.00 -12 -52938.24
i) 132 KV Capacitance Voltage Transformer -1 2259.00 -2259.00 0 2259.00 0.00 -1 -2259.00
220 Kv isolator With E/S -4 5088.35 -20353.40 0 5088.35 0.00 -4 -20353.40
220 Kv isolator With Out E/S 2 4574.49 8005.36 -9 4574.49 -40026.79 -7 -32021.43
j) 132 KV isolator With E/S 1 4106.00 2053.00 2 4106.00 8212.00 3 10265.00
k) 132 Kv Isolator Without E/S -4 3696.00 -14784.00 0 3696.00 0.00 -4 -14784.00
l) 33 KV Isolator -1 1335.00 -1335.00 0 1335.00 0.00 -1 -1335.00
220 KV Wave Trap -12 968.57 -11622.84 0 968.57 0.00 -12 -11622.84
m) 132 KV Wave Trap -4 1335.00 -5340.00 0 1335.00 0.00 -4 -5340.00
16 Erection of control/relay panels LTAC panels
annunication panels, PLCC&EPAX panels etc., in the
control room duly mounting them on channels &
grouting them with foundations bolts to be supplied by -23 1436.00 -33028.00 0 1436.00 0.00 -23 -33028.00
the contractor incl.GI channels.

17 Erection of the battery set incl. loading & unloading,


transport to site from APTRANSCO's stores and the
icidental handling charges

220 V 200 Ah Battery -1 6954.19 -6954.19 0 6954.19 0.00 -1 -6954.19


b) 48 V PLCC Battery Set -1 4726.00 -4726.00 0 4726.00 0.00 -1 -4726.00
18 Erection of the battery charger incl. loading &
unloading, transport to site from APTRANSCO's stores
and the incidental handling charges

a) 220 V Battery Charger with DC Distribution -1 3183.00 -3183.00 0 3183.00 0.00 -1 -3183.00
b) 48 V Battery Charger 10A -1 1455.00 -1455.00 0 1455.00 0.00 -1 -1455.00
19 Erection of Marshalling boxes on the structures of
equipment including cost of Marshalling boxes -15 5527.00 -82905.00 0 5527.00 0.00 -15 -82905.00

20 Erection of Marshalling kiosks in the switchyard on


foundation to be laid as per drawings no at contractors
cost including cost of all materials -6 20242.97 -121457.82 0 20242.97 0.00 -6 -121457.82

21 Erection of Station Transformer -1 288930.00 -288930.00 0 288930.00 0.00 -1 -288930.00


22 Supply & fixing of CT operated electronic energy
meter for 250KVA 33kv/400V-100/5A class of
accuracy, fixed in out door pilfer proof box -1 10607.44 -10607.44 0 10607.44 0.00 -1 -10607.44

23 Supply & Erection of LT Distribution box containing


three sets for distribution with MCCB Units -1 11877.00 -11877.00 0 11877.00 0.00 -1 -11877.00

24 Erection commissioning of Greaves make Diesel


Engine with standard accessories coupled to
kirloskar/Crompton make alternator of 3 phase, 445V,
0.8 p.f, 50 Hz, 1500 rpm, standard control panel, fuel
tank, batterry leads etc., 15 KVA Diesel generator set
complete as per details givenin specification. Including
cost of materials such as M.S Chanels, cement, sand -1 2052.70 -2052.70 0 2052.70 0.00 -1 -2052.70
etc., payment will be made against proforma invoice of
Diesel generator

25 Erection of Lightning pillar box in the switchyard on


foundation to be laid as per drawings no at contractors
cost including cost of all materials required that
-2 10899.00 -21798.00 0 10899.00 0.00 -2 -21798.00
includes cost of oillar box & cement

26 Supply & Fixing of 15 lbs capacity CO2 portable fire


extinguishers (with out trolleys) complete with first -10 5100.00 -51000.00 0 5100.00 0.00 -10 -51000.00
filling Horn & Hose

27 Supply & Fixing of 50 lbs capacity CO2 portable fire


extinguishers 9with trolley) complete with first filling -7 13900.00 -97300.00 0 13900.00 0.00 -7 -97300.00
Horn & Hose

28 Fabrication of name board for SS with 16 SWG MS Tin


and support framing with suitable angle and side angles
10 feet length for erection of the name board with
suitable colours indicating the particulars of SS -1 17200.00 -17200.00 0 17200.00 0.00 -1 -17200.00
including erection complete

29 Supply of MDF(Medium density Fibre) boards with


12mm thick 3' X 4' size with teakwood beading and
painting with two coats of white paint and drawings of
-1 12000.00 -12000.00 0 12000.00 0.00 -1 -12000.00
SS single line diagram with various colours.

30 Supply & Fixing of insulation rubber mats and laying in


the control room -5 1200.00 -6000.00 0 1200.00 0.00 -5 -6000.00

31 Supply & Fixing of Copper Flexible earth Bonds


suitable for PTR Neutrals -8 500.00 -4000.00 0 500.00 0.00 -8 -4000.00

32 Supply & Fixing of GI Flexible earth Bonds -160 50.00 -8000.00 0 50.00 0.00 -160 -24000.00
33 Supply and fixing of threaded LV bushing clamps
0.75 0.00 -4 0.00 -3 -9000.00

34 Writing of names in the control room for identification


of rooms on panels, equipment, marshalling boxes,
kiosks, with CT Ratio etc., & on main gates neatly with
superior quantity paint brushes & labour etc., complete 24 5000.00 120000.00 0 5000.00 0.00 24 1200.00
35 Supply and fixing of keyboard made up of teak wood
of size 750X500X250 mm with wood framed glass
shutters, lock & key arrangement for providing of all
keys including cost of transportation to site labour
charges etc. in complee finished item of work as -1 12000.00 -12000.00 0 12000.00 0.00 -1 -5000.00
directed by engineer at site

36 Supply and fixing of glow sign board 10' X 4' including


cost of transportation to site labour charges etc. in
complee finished item of work 0 0.00 0.00 0 0.00 0.00 0 0.00

37 Supply & fixing of caution boards made up of M S


sheet size 300X200X2 mm painted with superior
quality synthetic enamel paint of 2 coats including cost
of paint , brushes and labour charges etc in complete as
follows

A) DANGER with LOGO -2 200.00 -400.00 0 200.00 0.00 -2 -400.00


B) LINE CLEAR -2 200.00 -400.00 0 200.00 0.00 -2 -400.00

C) BREAK DOWN -2 200.00 -400.00 0 200.00 0.00 -2 -400.00

D) LOAD RELIEF -2 200.00 -400.00 0 200.00 0.00 -2 -400.00

T O T A L Rs -2407358.97 -612583.41 -2901893.32 -1003672.00

-4027191.96
-3019942.38 -3905565.32

SUPPLEMENTAL WORKS TO BE CARRIED OUT


1 Hoisting of insulators and hard ware stretching the
conductor and stringing of 220 KV Bus comprising of
Three phases with Twin Zebra/Moose conductor to a
tensin of 1800Kgs including fixing of spacer
clamps( The approximate length of bus section will be
40mts.)

2 Connecting equpiment to bus and/or another equipment


with Twin Zebra/Moose including measuring,cutting,
clamping & also hoisting of suspension insulator
assembly to support the conductor whereever
necessary.

a) with out clamps 280.32


3 Supply & erection of HG Fuse setsuitable for
33kv/400V station transformer

TOTAL ESTIMATE VALUE


TENTATIVE DEVIATION STATEMENT
Name of the work : Erection of 220/132KV SUB-STATION AT JURALA
Name of the Coctractor : M/S.STANDARD CONSULTANTS LIMITED, Hyderabad
Contract Award No. LR. No. CPT 210/SE-PM-I/220KV JURALA SS/RC -3920/2008 Dt. 4-12-2008.
L.S. Agrmt No. /2008 - 09 of SE/TLC/HYDERABAD.

Remarks/
Upto 25% Above 25% as per Cl.No.6 of order Excess Less Reasons
Sl.No. DESCRIPTION
Qty Rate Amount Qty Rate Amount Qty Amount Qty Amount for excess
or less Qty.
1 2 7 8 9 10 11 12 15 16 17 18 19
#REF! 3.055 #REF! #REF! #REF! #REF! #REF! ### #REF!
Supply of GI bolts & nuts 0.275 86629.00 23822.98 2.63 86629.00 227401.13 3 251224.10
Supply of 100x16mm MS earth flat -650 415.80 -270270.00 0 415.80 0.00 -650 -270270.00
Supply of 100x16mm GI earth flat -270 622.45 -168062.20 0 622.45 0.00 -270 -168062.20
Supply of 50x8mm MS earth flat 1000 93.00 93000.00 -4675 93.00 -434775.00 ### -341775.00
Supply of 50x16mm MS earth flat -2200 139.22 -306286.20 0 139.22 0.00 ### -306286.20
220 KV Circuit Breaker -6 1599015.00 -9594090.00 0 1599015.00 0.00 -6 -9594090.00
132 KV Circuit Breaker -3 735630.00 -2206890.00 0 735630.00 0.00 -3 -2206890.00
220 KV Current Transformer (PTR) -6 360000.00 -2160000.00 0 360000.00 0.00 -6 -2160000.00
220 KV Current Transformer(Feeder) -12 356083.00 -4272996.00 0 356083.00 0.00 -12 -4272996.00
132 KV Current Transformer(PTR) -6 121582.00 -729492.00 0 121582.00 0.00 -6 -729492.00
132 KV Current Transformer(protection) 2 89637.00 134455.50 4 89637.00 358548.00 6 493003.50
220 KV Potential Transformer 1 518672.00 389004.00 -4 518672.00 -1945020.00 -3 -1556016.00
132 KV Potential Transformer (metering) 0 143784.00 0.00 0 143784.00 0.00 0 0.00
220 KV Lightninig Arrestors -18 63727.00 -1147086.00 0 63727.00 0.00 -18 -1147086.00
132 KV Lightning Arrestors -9 36033.00 -324297.00 0 36033.00 0.00 -9 -324297.00
220 KV Capacitance Voltage Transformer -12 369520.00 -4434240.00 0 369520.00 0.00 -12 -4434240.00
132 KV Current Transformer(metering) -1 220131.00 -220131.00 0 220131.00 0.00 -1 -220131.00
220 Kv isolator With E/S -4 340868.00 -1363472.00 0 340868.00 0.00 -4 -1363472.00
220 Kv isolator With Out E/S 2 318637.00 557614.75 -9 318637.00 -2788073.75 -7 -2230459.00
132 KV isolator With E/S 0 102118.00 0.00 -1 102118.00 -102118.00 -1 -102118.00
132 Kv Isolator With Out E/S -1 79425.00 -99281.25 -3 79425.00 -218418.75 -4 -317700.00
33 KV/400 V Station Transformer(100 KVA) 0 250998.00 0.00 0 250998.00 0.00 0 0.00
220 KV Solid Core Insulators 28 17199.00 472972.50 57 17199.00 980343.00 85 1453315.50
132 KV Solid Core Insulators -52 9191.00 -477932.00 0 9191.00 0.00 -52 -477932.00
33 KV Solid Core Insulators 2 2042.00 4084.00 -12 2042.00 -24504.00 -10 -20420.00
220KV C & R panel (feeder) 0 1209339.00 0.00 0 1209339.00 0.00 0 0.00
220KV C & R panel (PTR) 0 1209339.00 0.00 0 1209339.00 0.00 0 0.00
220kv bus bar protection panel 0 1209339.00 0.00 0 1209339.00 0.00 0 0.00
132kv C & R panel -2 500000.00 -1000000.00 0 500000.00 0.00 -2 -1000000.00
LTAC Panel -1 249623.00 -249623.00 0 249623.00 0.00 -1 -249623.00
70 KN Disc Insulators 154 375.00 57750.00 -580 375.00 -217500.00 -426 -159750.00
ACSR Moose Conductor 0.381 260000.00 98995.00 -1.004 260000.00 -260975.00 -1 -161980.00
ACSR Moose/Zebra Conductor -0.894 220000.00 -196680.00 0.000 220000.00 0.00 -1 -196680.00
HTGS Earth Wire 0.113 25000.00 2812.50 0.005 25000.00 137.50 0 2950.00
220 V 200 Ah Battery -1 591233.00 -591233.00 0 591233.00 0.00 -1 -591233.00
220 V Battery Charger with DC Distribution -1 510610.00 -510610.00 0 510610.00 0.00 -1 -510610.00
Copper Control Cable 0.00 0 0.00
12x2.5Sqmm Copper cable 1.25 0.00 0.00 -6 0.00 0.00 -5 0.00
10x2.5Sqmm Copper cable 1 0.00 0.00 -5 0.00 0.00 -4 0.00
6x2.5Sqmm Copper cable 1.5 0.00 0.00 -8 0.00 0.00 -6 0.00
4x2.5Sqmm Copper cable 1.5 0.00 0.00 -8 0.00 0.00 -6 0.00
2x2.5Sqmm Copper cable -3.85 0.00 0.00 0 0.00 0.00 -4 0.00
Supply of furniture -1 100000.00 -100000.00 0 100000.00 0.00 -1 -100000.00
Supply of T & P -1 60000.00 -60000.00 0 60000.00 0.00 -1 -60000.00
Cropton Greaves diesel generator -1 152308.00 -152308.00 0 152308.00 0.00 -1 -152308.00
Supply of certain amenities -1 58000.00 -58000.00 0 58000.00 0.00 -1 -58000.00
TOTAL

SUPPLEMENTAL ITEM TO BE SUPPLIED


220 KV Current Transformer(Bus Coupler) 0.00 0.00
220 Kv isolator With Out E/S(1600A) 0.00 0.00
3 1/2 X 120 Sq.mm Power Cable 350000.00 350000.00
220kv PT distribution panel 0.00 0.00
Bus coupler panel
Supply of HG Fuse set
Change over switch with box 800A
33 KV Isolator 0 34039.00 0.00 0 34039.00
COST DATA

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


1. Fixing of 90lb Rail Pole
Cost steel as per Circular Lr. No.310/SE/P-
II/DE-3/D.No.49/09 Dt.18.02.10 1 30000.00 30000
Add for Transportation Charges 222.13
Add loading & unloading Charges 120-00 X 4 480.00
Cost of Black Paint required for two coats 2396.00+672.00 3068.00
33770.13
Cost of Rail Pole/RMT 0.040832 * 33770.13 1378.9019
Rate for fixing of Rail Pole as per SSR 295.00
295.00
1673.90
Or say 1674.00

2. Procurement, fabrication & galvanisation of raw steel


Cost steel as per Circular Lr. No.310/SE/P-
II/DE-3/D.No.49/09 Dt.18.02.10 54667.00
Add loading and unloading charges as per SSR/MT 120-00 X 4 480.00
Add Transport Charges per MT 222.13
Total Cost of Steel/MT 55369.13
Or say 55369.00

3.Suply of Hot dip Galavanized bolts & nuts


Total Cost of Steel/MT 55369.00
Add 10% for making threading and moulding of bolts & nuts 5536.9
60905.90
Or say 60906.00

4.Erection of Structures
As per SSR 1480.00

6.Stringing of 132 KV Twin Bus


As Per SSR 0 5032.00 0.00
Cost of Clamps 5bolted tension Clamps(6 Nos) 0 1000 0
Cost of Spacer Clamps(15 nos) 0 250 0
Cost of Suspension Clamps 0 500 0
Transportation, Loading & Unloading charges for disc insulators 0 5 0
Transportationcharges for Zebra conductor 0 1799 0
0.00
Cost of Stringing of 132 KV Twin Bus for each 0.00

5.Stringing of 132 KV Single Bus


As Per SSR 0 2958 0
Cost of Clamps 5bolted single tension Clamps(6 Nos) 6 1800 10800
Cost of Suspension Clamps 0 1000 0
Transportation, Loading & Unloading charges for disc 0 5.00 0.00
Transportationcharges for Moose/Zebra conductor
insulators 0 1799.00 0.00
10800.00
Cost of Stringing of 132 KV Single Bus for each 0.00

6.Stringing of 33 KV Twin Bus


As Per SSR 2 3700.00 7400.00
Cost of Clamps 3bolted Double tension Clamps(6 Nos) 12 2850 34200
Transportation, Loading & Unloading charges for disc insulators 48 5.00 240.00
Transportationcharges for Moose/Zebra conductor 0.24 1799.00 431.76
42271.76
Cost of Stringing of 33 KV Twin Bus for each 21136.00

7.Stringing of 33 KV Single Aux. Bus


As Per SSR 0 3700.00 0
Cost of Clamps 3bolted single tension Clamps(6 Nos) 0 2850 0
Transportation, Loading & Unloading charges for disc insulators 0 5.00 0
Transportation charges for Moose/Zebra conductor 0 1799.00 0
0.00
Cost of Stringing of 33 KV Single Aux. Bus for each #DIV/0!

8.Stringing of Earth Wire


As Per SSR 28 377.00 10556
Cost of Clamps 3bolted tension Clamps(2 Nos) 56 600 33600
Transportationcharges for Earth Wire 0.568 431.00 244.808
44400.81
Cost of Stringing of Earth wire from pinacle to pinacle for each 1586

9.Connecting of Equipment with Single Zebra/Moose


With Out Clamps
As Per SSR for single jumper 177
Cost of jumpering for X no.s of jumpers 45 45 177 7965
Transport, loading,unloading & insurance
charges for Moose/Zebra 0.045 0.045 1799.00 80.96
Total Cost of Jumpering with Single Jumpers 8045.96
Cost of Each jumper 179.00

With Clamps
As Per SSR for single jumper 177
Cost of jumpering for X no.s of jumpers 48 48 177 8496
Cost of Twin Moose Spacer I clamps for Single 0 0 950 0
Cost of Twin Moose/Zebra T-Off clamps for
Single Moose/Zebra 52 52 650 33800
Cost of T clamps for single Moose/Zebra 60 60 350 21000
Cost of 33 KV SCI insulator support clamps 12 12 650 7800
Cost of Sus insulator Clamps 3 3 1000 3000
Transport, loading,unloading & insurance
charges for Zebra/Moose 0.048 0.048 1799.00 2239.40
76335.40
Cost of Each jumper 1590
Cost of Each jumper for shut down 1590
15. With Twin Zebra/Moose
With Clamps
As Per SSR for Each Twin jumper 233
Total cost of Jumpering with Twin Jumpers 0 233 0
Cost of Twin Zebra spacer I clamps for Twin zebr 0 900 0
Cost of Twin Zebra Spacers clamps for Twin Zebr 6 250 1500
Cost of T-Off clamps for single Zebra 12 350 4200
Cost of 33 KV SCI insulator support clamps 3 1000 3000
Transport, loading,unloading & insurance charges 0 1799 0
Total Cost of Jumpering with Twin Jumpers 8700
Cost of each jumper 0

10.Laying Of Earth Mat


Cost of MS Earth Flat
Cost steel as per Circular Lr. No.310/SE/P-II/DE-3/D.No.49/09 Dt.18.02.10 32500.00
Add 5% wastage 1625.00
34125.00
Add loading and unloading charges as per SSR/MT 120 2.00 240.00
Add Transport Charges 222.13
Total Cost of Steel/MT 34587.13
or say 34587.00

Cost of GI Earth Flat


Cost of raw steel as per IEEMA(March)/MT 44838.00
Add 5% wastage 2241.90
47079.90
Add loading and unloading charges as per SSR/MT 120 2.00 240.00
Add Transport Charges/MT 222.13
Total Cost of Steel/MT 47542.03
or say 47542.00

a) 100 X 16 mm GI Flat
Rate as per SSR 35.3
Cost of GI Earth Flat incl. galvanisation Charges/RMT 599.03
Total Laying Charges 708.66
or say 709

b) 100 X 16 mm MS Flat
Rate as per SSR 35.3
Cost of MS Earth Flat/RMT 435.80
Total Laying Charges 567.9
or say 568

c) 50 X 8 mm MS Flat
Rate as per SSR 28.2
Cost of MS Earth Flat/RMT 107.22
Total Laying Charges 135.4197
or say 135

d) 50 X 8 mm GI Flat
Rate as per SSR 28.2
Cost of GI Earth Flat/RMT 147.38
Total Laying Charges 175.5802
or say 176

e) Excavation of Earth pits


Rate as per SSR 7155

11.Laying Of Control Cables


Rate as per SSR 6.80
Laying charges including Loading, Unloading, Transport & Insurance Charges 8.00
as per sheet enclosed

12.Laying Of Power Cables


Rate as per SSR 9.30
Laying charges including Loading, Unloading, Transport & Insurance Charges #DIV/0!
as per sheet enclosed

13. Cables Terminations


Rate as per SSR for 2.5 Sqmm copper 18.5
Rate as per SSR for 4.0 Sqmm copper 19.7

14. Installation of lightnining Fixtures


Rate as per SSR 592
Cost of Lightnining Fixtures 6500
7092
19. Erection of Marshalling Boxes
Cost of Marshalling Box 4500
Erection rate as per SSR 215
Total cost 4715

21. Supply and erection of station transformer


Cost of transformer including cost of HG fuse set & SCI 250000
erection cost including transport, insurance charges #DIV/0!
Total Cost #DIV/0!

23.Supply & Erection of LT Distribution box containing three sets for distribution with
MCCB units 6000
Erection rate as per SSR 215
Total cost 6215

30.Supply & Erection of Generator Set 592


Rate As per SSR(treated as lighting pillar bax) 6000
Cost of LTDB 6592.00

24.Supply & Erection of Lighting Pillar Box 592


Rate As per SSR 10000
Cost of Lighting Pillar box 10592

25.Supply & Fixing of Portable Emergency twin tube fittings of 20 watts capacity 3000

26.Supply & Fixing of 15 lbs capacity CO2 portable fire extinguishers (with out trolleys) 6000

27.Supply & Fixing of 50 lbs capacity CO2 portable fire extinguishers (with trolleys) 12000

28.Fabrication of name board for SS 10000

29.Supply of MDF(Medium density Fibre) boards for drawings of SS single line diagram
12000
with various colours.
30.Supply & Fixing of insulation rubber mats and laying in the control room 1200

31.Supply of furniture (GODREJ make) in the control room 100000

32.Supply of tool box containing spanners cutting pilers etc., 15000

33. Supply of Multimeter (MECO Make), Digital Insulation Tester (SEW/Waco Make), 30000
5 KV Meggar Hand operated

34.Supply & Fixing of Flexible GI earth Bonds as per local market rate 125

35.Supply & Fixing of Flexible Copper Earth Bonds suitable for PTR Neutrals 500
37.Supply and fixing of keyboard 5000

38.Supply and fixing of wallclock with musical bell. 500

39.Supply and fixing of glow sign board 10' X 4' 10000

40.Supply of caution Boards


A) Danger Boards 150
B) On Line Clear Boards 150
C) Men on Work 150

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.
SL NO
With
With out Clamps
Clamps

Single Moose/Zebra T Clamps suited to Single


Twin Moose/Zebra Spacer T-off Clamps suited
Total No.Of Jumpers to Be Connected with

Total No.Of Jumpers to Be Connected with


Qty Of Moose/Zebra Conductor required

Qty Of Moose/Zebra Conductor required


Line Isolator to Wave Trap
Bus Isolator to Breaker

Line Isolator to Line


Single Moose/Zebra

Single Moose/Zebra
Bus Isolator to Bus
CT to Line Isolator

Wave Trap to Line

to Single Moose
Bus PT to Bus
Breaker to CT

CVT to Line

LA to Line

Moose
Qty

132 KV Bay 0 3 3 3 1 0 0 3 2 1 2 3 3 0 0 0
33 KV Bay ### 3 3 3 ### ### 3 6 ### ### ###
### ### ### ### ### 0

220/132/33 KV
Bays
Total NO.OF Single Moose/Zebra Jumpers to be connected with out
###
clamps

Total No.Of Jumpers Connected With Single Moose/Zebra ###

Total NO.OF Single Moose/Zebra Jumpers to be connected with clamps ###

Total No.Of Jumpers Connected With Single Moose/Zebra with Clamps ###

Total NO.OF Single Moose/Zebra T Clamps for Single Moose/Zebra 0

Total NO.OF Twin Moose/Zebra Spacer T-Off Clamps for Single


###
Moose/Zebra
Total QTY Of ACSR Moose/Zebra Conductor ### ### ###

Asst. Executive Engineer,


T.L.C.SD, NALGONDA.
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.

SL NO
With out
Clamps

Qty Of Moose/Zebra Conductor required in Mts for Single

Qty Of Moose/Zebra Conductor required in Mts for Single

Twin Moose/Zebra Spacer T-off Clamps suited to Single


Total No.Of Jumpers to Be Connected with Single

Total No.Of Jumpers to Be Connected with Single

Single Moose/Zebra T Clamps suited to Single

Gun Metal Clamps suitable to LV Bushings


LV Aux. Bus to LV Support SCI

LV Aux. Bus to LV Support SCI

LV Support SCI to LV Bushings


LV Support SCI to LV CT'S

LV jumper Support Clamps


HV LA'S to HV Bushings

HV Isolator to HV Bus
HV Isolator to Breaker

LV Isolator to Breaker

Moose/Zebra Jumpers
LV Isolator to LV Bus
LV Aux. Bus to LA'S
HV Breaker to CT'S

LV Breaker to CT'S
HV CT'S to LA'S

Bypass Jumpers
Moose Jumpers
Moose/Zebra

Moose/Zebra

Moose/Zebra

Moose
Qty

132/33 KV 10/16 MVA PTR 0 3 3 3 3 3 3 0 0 3 3 3 3 3 3 3 3 0 0 0 0 0 0


72 216 216 1116 1152 0 0 36

Transformer

Bay
Total No. of Single Moose Jumpers to be connected with out clamps 360

Total No. of Single Moose/Zebra Jumpers to be connected with out


72
clamps
Total No.Of Jumpers Connected With Single Moose/Zebra 432
Total NO.OF Single Moose/Zebra Jumpers to be connected with
216
clamps
Total No.Of Jumpers Connected With Single Moose/Zebra with Clamps 306
LV jumper Support Clamps 0
Total NO.OF Single Moose/Zebra T Clamps for Single Moose ###
Total NO.OF Twin Moose/Zebra Spacer T-off Clamps for Single Moose 36
Gun Metal Clamps suitable to LV Bushings 0
Total QTY Of ACSR Moose/Zebra Conductor 216 1116 ###
Asst. Executive Engineer,
T.L.C.SD, NALGONDA.
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.

disc single suspension


conductor double tension single tension Solid Core
Name of the work Qty insulators / Support clamps spacer clamps
required in Mts clamps required clamps required Insulators
required required

Zebra Moose Zebra Moose Zebra Moose Zebra Moose Zebra Moose Zebra Moose
220 KV Twin Bus with Moose
conductor(approximate 40 mts 0 0 0 0 0 0 0
bus section)
132 KV Twin Bus with Zebra
conductor(approximate 45 mts 0 0 0 0 0 0
bus section)
132 KV Single Bus with Moose 0 0 0 0
conductor (approximate 45 mts
bus section)
33 KV Twin Bus with Moose 2 48 246 12 14
conductor (approximate 20 mts
bus section)
132 KV LV Aux. Bus with Twin 0 0 0 0 0 0
Zebra conductor (approximate 20
mts bus section)
132 KV LV Aux.Bus with Single 0 0 0 0 0
Zebra conductor (approximate 20
mts bus section)
33 KV LV Aux. Bus with Twin 0 0 0 0 0 0 0
Zebra conductor (approximate 20
mts bus section)
33 KV LV Aux. Bus with Single 2 48 102 12 6 6
Moose conductor (approximate 20
mts bus section)
96 0 348 0 12 12 0 6 0 14 6

Total No.Of Disc Insulators Required 96


Total Qty of ACSR Moose Conductor Required in Mts 348
Total No.Of Single Tension Clamps Required for Moose 12
Total No.Of Doble Tension Clamps Required for Moose 12
Total No.Of Single suspension Clamps Required for
6
Moose
Total No.Of SpacerClamps Required for Moose 14
Total No.Of Solid Core Insulators Required 6
Asst. Executive Engineer,
T.L.C.SD, NALGONDA.
APTRANSCO

From To
Assistant Executive Engineer The Executive Engineer
TLC, SD - Mahabubnagar TLC, Mahabubnagar

Lr No AEE/TLC/SD - MBNR/F 132kv Bay extension in Kothur SS /D No /10 Dt 26-04-2010

Sir,
SUB: Erection of ONE No 132kv bay extension in 132/33kv Kothur SS in Mahabubnagar - Tentative Revised Estimate Submitted
REF: 1
2

*****

In the reference (1) cited above, the approval was accorded for bifurcation of 132kv bus to load demand and to utilise
both the incoming circuits at 132kv level to 132/33kv Kothur SS. The tentative estimate for the said was submitted vide
reference (2) cited above. Further, it is instructed to submit the estimate for ONE No 132kv bay extension in Kothur SS
for Shamshabad feeder in stead of bus bifercation. Therefore, the tenetative estimate for an amount of Rs
#DIV/0! is prepared based on the SSR rates of 2009-10 and the same is submitted herewith for necessary action

Encl: Report Accompany the estimate


Detail estimate
Data sheet Assistant Executive Engineer
Cost data TLC, SD - Mahabubnagar
REPORT ACCOMPANY THE ESTIMATE

Estimate amount Rs

The tentative estimate for an amount of Rs #DIV/0! is prepared towards erection of 132kv bay extension in .
132/33kv kothur SS. The tentative estimate envisages for procurement & erection of GI structure parts, earthing of
equipment & structure and laying of earth amt including supply of earth flat, supply & erection and of 132kv control and
metering, connecting of jumpers including cost of required clamps and connectors and panels etc. Further, the estimate
is prepared for dismantling of old equipment available in 132kv bay extension of steel company, which is not in use
as the date.

The estimate is essential for erection of 132kv bay extension in 132/33kv SS at Kothur SS inorder to utilise both the
incoming supplies at 132kv level from Shamshabad and Shadnagar sub stations.

The rates adopted for the estimate is as per SSR of 2009-10 of CE/Construction/VS/Hyderabad and common SSR of
2009-10 of Govt of AP.

The expenditure of Rs #DIV/0! is chargeable to the erection of 132kv bay extension in 132/33kv Kothur SS.

Assistant Executive Engineer


TLC, SD - Mahabubnagar
APTRANSCO

From To
Assistant Executive Engineer The Executive Engineer
TLC, SD - Mahabubnagar TLC, Mahabubnagar

Lr No AEE/TLC/SD - MBNR/F 132/33kv Singotam SS/D No 720 /09 Dt 03-03-2010

Sir,
SUB: Erection of 132/33kv SS at Singotam in Mahabubnagar - Tentative Revised Estimate Submitted - Reg
REF: 1. T O O ( CE - Construction) MS No 230 Dt 23-12-2008
2. Lr No AEE/TLC/SD-MBNR/F Singitam SS/D No 615 /09 Dt 12-10-2009

*****

In the reference (1) cited above, the administrative approval for erection of 132/33kv Singotam SS and its connected
line from 132/33kv NagarKurnool SS for an amount of Rs2050Lakhs was issued. The proposals for acquisition of land
was submitted to The RDO/Nagarkurnool and the identified land is to be handed over to APTRANSCO. Pending the
taking over of land, the tentative estimate for erection of 132/33kv SS at Singotam for an amount of Rs
#DIV/0! was submitted vide ref (2) cited above and revised estimate for an amount of Rs
as per SSR of 2009-2010 and submitted herewith for necessary action

Encl: Report Accompany the estimate


Detail estimate
Data sheet Assistant Executive Engineer
Cost data TLC, SD - Mahabubnagar
REPORT ACCOMPANY THE ESTIMATE

Estimate amount Rs

The tentative estimate for an amount of Rs #DIV/0! is prepared towards erection of 132/33kv Singotam SS.
The tentative estimate envisages for procurement & erection of GI structure parts, earthing of equipment & structure
and laying of earth amt including supply of earth flat, supply & erection and of 132kv control and metering equipment
connecting of jumpers including cost of required clamps and connectors, panels for automisation etc.

The estimate is essential for erection of 132/33kv SS at Singotam inorder to provided better voltage and also to reduce
reduce the line losses and loading of PTRs in 220/132/33kv Wanaparthy SS.

The rates adopted for the estimate is as per SSR of 2008-09 of CE/Construction/VS/Hyderabad and common SSR for
the 2008-09 of Govt of AP.

The expenditure of Rs #DIV/0! is chargeable to erection of 132/33kv Singotam SS.

Assistant Executive Engineer


TLC, SD - Mahabubnagar
Executive Engineer
, Mahabubnagar

010

tative Revised Estimate Submitted

s to load demand and to utilise


or the said was submitted vide
kv bay extension in Kothur SS
r an amount of Rs
ed herewith for necessary action

stant Executive Engineer


, SD - Mahabubnagar
#DIV/0!

on of 132kv bay extension in .


structure parts, earthing of
ection and of 132kv control and
panels etc. Further, the estimate
mpany, which is not in use

SS inorder to utilise both the

derabad and common SSR of

on in 132/33kv Kothur SS.

stant Executive Engineer


, SD - Mahabubnagar
Executive Engineer
, Mahabubnagar

bmitted - Reg

ingotam SS and its connected


oposals for acquisition of land
APTRANSCO. Pending the
or an amount of Rs #DIV/0!
#DIV/0! is prepared

stant Executive Engineer


, SD - Mahabubnagar
#DIV/0!

on of 132/33kv Singotam SS.


ng of equipment & structure
trol and metering equipment
misation etc.

tter voltage and also to reduce

derabad and common SSR for

stant Executive Engineer


, SD - Mahabubnagar
Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.

Equipments

132 KV
Size Of the Wt./ 33 KV
132 Solid 33 Isolat Control
Bolt & Nuts Piece 132 KV 132 KV 132 KV 132 KV 33 KV 33 KV Solid Earth CTM Total
KV Core KV or & Relay Total Wt
in C.T'S CVT'S P.TS Isolator C.T'S P.T'S Core Pits B'S No.s
L.A'S Insulat L.A'S MB'S Panels
KG'S Insulators
ors

16 X 80 MM 0.189 0 12 12 12 0 0 0 0 0 0 60 0 0 0 96 18.144
16 X 50 MM 0.141 0 12 0 0 0 0 0 0 0 0 0 0 0 0 12 1.692
16 X 45 MM 0.133 0 0 0 0 0 0 0 0 0 0 120 0 0 0 120 15.96
16 X 40 MM 0.125 0 0 12 12 24 72 0 0 0 0 0 12 20 48 200 25
16 X 35 MM 0.117 0 0 0 0 0 72 0 0 0 0 0 0 0 0 72 8.424
12 X 40 MM 0.07 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4 0.28
16 X 3.5 X 5 0.009 96 96 32 24 84 504 0 0 0 0 588 60 84 68 1636 14.724
84.224
Or Say 80

Asst. Executive Engineer,


T.L.C.SD-Mahabubnagar.