You are on page 1of 1

PROJECT : UPGRADING CHEMICAL STORE LEVEL 4 AT NORTH PARKING AREA @ CIQ

TITLE : WORK PROGRAM


DATE : 3/APRIL/2018
CONTARCTOR : HIFASLEE SERVICES

WEEK 1 WEEK 2 WEEK 3 WEEK 4


ITEM DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
1 PRELIMENARY

2 CIVIL WORK
2.1 ALUMINIUM DOOR FABRICATION AND DELIVERY
2.2 BRICK WALL ERECTION
2.3 INSTALLATION DOOR FRAME
2.4 PLASTERING WORK
2.5 WALL PAINTING

3 MECHANICAL WORK
3.1 FAN FABRICARION AND DELIVERY
3.2 EXHAUST DUCT FABRICATION AND DELIVERY
3.3 CONTROL PANEL FABRICATION AND DELIVERY
3.4 EXHAUST DUCT INSTALLATION AND ACCESSORIES
3.5 TESTING AND COMMSIONING

4 ELECTRICAL WORK
4.1 PANEL FABRICATION AND DELIVERY
4.2 LAYING CABLE FROM EXISTING DB TO SUB DB
4.3 LAYING G.I. CONDUIT AND WIRE
4.4 INSTALL FITTINGS
4.5 TESTING AND COMMSIONING