You are on page 1of 3

Project                             :499‐MOD

MAS REF                          :MAS‐MX‐
Material  : Supply, install and testing commissioning of FM 200 Fire suppression

BOQ Item Ref  DESCRIPTION QTY Unit

RAFO AIR BASES-ADAM

FIRE SUPPRESSION SYSTEM
HEAD QUARTERS BUILDING- Ground floor- Signal room & RAFO NET room
Allow for Design, Installation, testing & commissioning of FM-200 Fire
Suppression System complete with storage cylinders, Spray nozzles, pipe
works including fittings, detection devices, alarm signals, Emergency pull
A station, Abort switch, control panel with battery backup, containment/ 1 Item
conduit, wiring & all necessary accessories, termination, connection to
power source, etc....all as detailed shown on drawing no
0062/AD/HQ/FF-01 .

FIRE SUPPRESSION SYSTEM
SYSTEM STORAGE HANGER- Ground floor- Signal room & RAFO NET room
Allow for Design, Installation, testing & commissioning of FM-200 Fire
Suppression System complete with storage cylinders, Spray nozzles, pipe
works including fittings, detection devices, alarm signals, Emergency pull
station, Abort switch, control panel with battery backup, containment/
B
conduit, wiring & all necessary accessories, termination, connection to 1 Item
power source, etc....all as detailed shown on drawing (the system shown is
indicative, the contractor has to submit the detailed design by the
specialized supplier/contractor before the commencement of the work and
obtain approval from MOD and Consultant ), Refer: Signal room and
RAFO NET
as detailed shown on drawing no 0062/AD/SSH/FF-01 .

RAFO AIR BASES- THUMRIT

FIRE SUPPRESSION SYSTEM
HEAD QUARTERS BUILDING- Ground floor- Signal room & RAFO NET
room
Design, Installation, testing & commissioning of FM-200 Fire Suppression
System complete with storage cylinders, Spray nozzles, pipe works
including fittings, detection devices, alarm signals, Emergency pull station,
Pressure switch, Abort switch, control panel with battery backup,
containment/ conduit, wiring & all necessary accessories, termination,
connection to power source, etc....all as detailed shown on drawing (the
system shown is indicative, the contractor has to submit the detailed
design by the specialized supplier/contractor before the commencement of
the work and obtain approval from MOD and Consultant )-as detailed
shown on drawing no 0062/TH/HQ/FF-01 .

A Signal Room (G/F), Area - 11.00m2 1 No


B RAFO Net Room (G/F), Area - 13.00m2 1 No

FIRE SUPPRESSION SYSTEM
MAINTENANCE HANGER(LMF)- Ground floor- Signal room & RAFO NET
room
Project                             :499‐MOD
MAS REF                          :MAS‐MX‐
Material  : Supply, install and testing commissioning of FM 200 Fire suppression

BOQ Item Ref  DESCRIPTION QTY Unit

Design, Installation, testing & commissioning of FM-200 Fire Suppression


System complete with storage cylinders, Spray nozzles, pipe works
including fittings, detection devices, alarm signals, Emergency pull station,
Pressure switch, Abort switch, control panel with battery backup,
containment/ conduit, wiring & all necessary accessories, termination,
connection to power source, etc....all as detailed shown on drawing (the
system shown is indicative, the contractor has to submit the detailed
design by the specialized supplier/contractor before the commencement of
the work and obtain approval from MOD and Consultant )- as detailed
shown on drawing no 0062/TH/LMF/FF-01 .

C RAFO Net Room (1st/F), Area - 6.34m2 1 No


D Signal Room (1st/F), Area - 6.34m2 1 No

FIRE SUPPRESSION SYSTEM
SYSTEM STORAGE HANGER- Ground floor- Signal room & RAFO NET
room
Allow for Design, Installation, testing & commissioning of FM-200 Fire
Suppression System complete with storage cylinders, Spray nozzles, pipe
works including fittings, detection devices, alarm signals, Emergency pull
station, Abort switch, control panel with battery backup, containment/
conduit, wiring & all necessary accessories, termination, connection to
E power source, etc....all as detailed shown on drawing (the system shown is 1 Item
indicative, the contractor has to submit the detailed design by the
specialized supplier/contractor before the commencement of the work and
obtain approval from MOD and Consultant ), Refer: Signal room and
RAFO NET - - as detailed shown on drawing no 0062/TH/SSH/FF-01 .

FIRE SUPPRESSION SYSTEM
VEHICLE WORKSHOP- First floor- Signal room & RAFO NET room
Allow for Design, Installation, testing & commissioning of FM-200 Fire
Suppression System complete with storage cylinders, Spray nozzles, pipe
works including fittings, detection devices, alarm signals, Emergency pull
F station, Abort switch, control panel with battery backup, containment/ 1 Item
conduit, wiring & all neccesary accesssories, termination, connection to
power source, etc....all as detailed shown on drawing no
0062/TH/VPW/FF-102 , & FF-104 .

RAFO AIR BASES-SEEB

Design, Installation, testing & commissioning of FM-200 Fire Suppression


System complete with storage cylinders, Spray nozzles, pipe works
including fittings, detection devices, alarm signals, Emergency pull station,
Pressure switch, Abort switch, control panel with battery backup,
containment/ conduit, wiring & all necessary accessories, termination,
connection to power source, etc....all as detailed shown on drawing (the
system shown is indicative, the contractor has to submit the detailed
design by the specialized supplier/contractor before the commencement of
the work and obtain approval from MOD and Consultant )
Project                             :499‐MOD
MAS REF                          :MAS‐MX‐
Material  : Supply, install and testing commissioning of FM 200 Fire suppression

BOQ Item Ref  DESCRIPTION QTY Unit

Bill No 04 Air Defence School Building
1 UPS Room (G/F), Area ‐ 12.32m2 and 4.8 m Height( 59.136 m3 volume) No 1
2 RAFO Net Room (1st/F), Area ‐ 22.00m2 and 4.4  m height (96.8m3) No 1

3 Bill No 05 Head Quarters Building
4 Signal room (5mx2.5mx4.2m =52.5 m3 No 1
5 RAFO NET ( 5m x 3 mx 4.2 m)=63 m3 No 1

Bill No 06 Maintenance Hanger
6 POL Store (G/F), Area ‐ 9.00m2 Height 4.8 m (volume  43.2 m3) No 1
7 RAFO Net Room (G/F), Area ‐ 7.00m2 height 4.8 m (33.6 m3) No 1
8 Signal Room (G/F), Area ‐ 7.00m2 height 4.8 m3 ( volume 33.6 m3) No 1
9 RAFO Net Room (1st/F), Area ‐ 6.34m2 height 4.8m3(Volume 30.432) No 1
10 Signal Room (1st/F), Area ‐ 6.34m2 height 4.9 m  ( Volume 31.07 m3) No 1

Bill No 07 System Storage Hanger
11 FM 200 system for RAFO NET (3.3m x4 mx 4.8m) = volume 63.36 m3 Nos 1
12 FM 200 system for Signal Room( 4mx2.9 mx 4.8 m)=volume =55.68m3 Nos 1

Bill No 08A Vehicle WorkShop
13 RAFO NET Room First Floor (3x4.4 mx height 4 m) =52.8 m3 No 1
14 Signal Room First Floor (3x4.4 mx height 4 m) =52.8 m3 No 1

Bill NO 10 ‐OPS ROOM
15 RAFONET Server Room, Area ‐13.92m2 height 4.8 m = volume= 66.816 m3 No 1
16 Signal Room, Area ‐13.92m2   height 4.8 =66.816 m3 No 1