Breaking of Pile Heads Checklist

Location: Area: I.T.P No: Sheet No:

Contractor: Hookmally Ali Limited Contract: TMD Project/EPC

Section: Element:

Checklist Items S/C HAL MHI Owner

1) Area around piles have been excavated without causing


damage to the pile.
2) Design cutoff level set on pile.

3) Break piles to the required/set cutoff level.


4) Reinforcement is adequate to provide the adequate
development length from the pile to the pile cap.
5) Rebar has been cleaned of all impurities including loose rust,
concrete laitance and other material that would decrease
bondage.

For and on Behalf of Hookmally Ali Limited For and on behalf of Mitsubishi Heavy Industries
Accepted Not Accepted Accepted Not Accepted

Signed Signed

Print Name Date Print Name Date