6.4 2.5
3.9
2 Urugan pasir Bawah Pondasi Volume Urugan Pasir Bawah Pondasi 0.390 m3
0.1
0.4
V1 = 1 x V Galian Tanah
4
= 0 x 2.652
4
= 2.652
4
= 0.663 m3
6 Pek. Urugan Tanah Bawah Lantai Volume Pek. Urugan Tanah Bawah Lantai 0.540 m3
0.15
1.2
7 Pek. Urugan Pasir Bawah Lantai Volume Pek. Urugan Pasir Bawah Lantai 0.180 m3
0.05
1.2
8 Pek. Lantai Beton Tumbuk 1:3 Volume Pek. Lantai Beton Tumbuk 1:3 0.180 m3
0.05
1.2
0.15
0.15
0.15
4 Pek. Beton Pelat Dak (Atap) Volume Pek. Beton Pelat Dak (Atap) 0.839 m3
Lubang Tower
Vplat = Lbr x Pjg x Tebal Llubang = Lbr x Pjg
1.60 m
= 1.55 x 2.55 x 0.09 = 1.30 x 1.3
= 0.429 m3 = 1.69 m2
Vtot = 0.839 m3
10.4
2 Pek. Pasangan Dinding Bata Camp. 1 : 4 Volume Pek. Pasangan Dinding Bata Camp. 1 : 4 23.618 m2
(Catt: Dikurangi dinding trasram 0.50 mtr u. KM)
1. Dinding KM/WC Barat-Timur
L1 = Lbr x Tggi
= 3.75 x 2.5
= 9.375 m2
2.50
L2 = Lbr x Tggi
= 2.10 x 2.50
= 5.250 m2
3.75
2. Dinding KM/WC Selatan L3 = Lbr x Tggi
= 1 x 2.5
= 2.5 m2
L5 = Lbr x Tggi
2.10 = 1.4 x 3.00
= 4.20 m2
3. Dinding KM/WC Utara Bawah
L6 = Lbr x Tggi
= 1.5 x 3.00
2.50 = 4.50 m2
L7 = Lbr x Tggi
= 3.55 x 1.00
= 3.55 m2
1.0
4. Dinding KM/WC Utara Atas
Ltot = L1 - 7 - L Kusen - L Ventilasi
= 30.38 - 6.1975 - 0.56
1.0
= 23.62 m2
1
5. Dinding Kantor Selatan
3.00
1.4
3.00
1.5
7. Dinding 1.50 meter Keliling Luar KM/WC
1.00
3.55
3 Pek. Plesteran Dinding & Kaki Pondasi Luas Plesteran Dinding dan Kaki Pondasi Camp 1 : 4 54.385 m2
Camp. 1:4
1. Dinding KM/WC Barat-Timur
` L1 = Lbr x Tggi x Sisi
= 3.75 x 3.00 x 2
3.00
= 22.5 m2
1.00
3.55
4 Pek. Acian Semen Dinding, Beton, Pelat Da Luas Acian Semen Dinding, Beton, Pelat Dak dan Kaki Pondasi 62.505 m2
dan Kaki Pondasi (KM/WC dikurangi 1.6 m)
1. Dinding KM/WC Barat-Timur
` L1 = Lbr x Tggi x Sisi
= 3.75 x 1.4 x 2
1.40
= 10.5 m2
1.40
15 cm
235 cm
0.20
6.5
L1 = Lbr x Panjang
1.15
= 0.8 x 3.00
= 2.4 m2
3.00
L2 = Lbr x Panjang
0.60 = 0.6 x 2.70
= 1.62 m2
2.70
Ltot = 4.02 m2
2 Pek. Pasangan Keramik Lantai 20x20 cm Volume Pek. Pemasangan Keramik Lantai 20x20 cm 3.105 m2
bak
dudukan kloset 54.50 Lbrutto = Lbr x Panjang x Jml
= 1.35 x 1.15 x 2
54.50 = 3.105 m2
1.15
50 Volume Pek. Pemasangan Plint Keramik 10x20 cm (Dinding Atas KM/WC) 8.500 m1
c. Sisi Barat
10 Plint 10x20 cm Volume Pek. Pemasangan Plint Keramik 10x30 cm (Lantai Teras KM) 7.050 m1
Lplint = 7.05 m1
150
125
d. Sisi Selatan
10 Plint 10x20 cm
bak
150
65
54.5
125
0.7 0.7
1.4
1.3
2.4
2 Pek. Pemasangan Genteng Metal Sakura RoVolume Pek. Pemasangan Genteng Metal Sakura Roof 6.93 m2
L1 = Pjng x Lbr
1.732 = 4 x 1.73
= 6.93 m2
4.00
L = Pjng x Lebar
= 1.5 x 4
1.50
= 6.0 m2
4.0
2 Pekerjaan Pmsg. Lis Plafon (Cornis) Volume Pek. Pmsg. Lis Plafon (Cornis) 6.00 m1
L = Pjng
= 6.0 m1
L = Pjng
= 6.0 m1
0.20
6.0
1 Pekerjaan Kusen Pintu Kayu Volume Pek. Kusen Pintu Kayu 5/15 cm 0.037 m3
Vtot = V x Jumllah
= 0.037 x 1 Kusen
= 0.037 m2
2 Pekerjaan Pintu Panil Kayu Volume Pek. Pintu Panil Kayu 1.50 m2
V = Lebar x Tinggi
= 0.75 x 2
= 1.50 m2
150
200 cm
60
75 cm
3 Pekerjaan Kusen Jendela, Bingkai Volume Pek. Kusen Jendela 5/15 cm 0.035 m3
dan Kaca 5 mm
Vkusen = Lbr x Pjg x Kllng
= 0.15 x 0.05 x 4.6
= 0.035 m3
Vtot = V1 + V2
= 0 + 0.0195
= 0.02 m3
5 Pekerjaan Pmsg. Pintu Aluminium Standar Volume Pek. Pmsg. Pintu Aluminium Standar KM/WC 2.000 Set
V = 2 Set
V = 1 Set
2 Pek. Pmsg. Engsel Pintu dan Jendela Volume Pek. Pmsg. Engsel Pintu dan Jendela (uk. 4 inci) 2.000 Set
V = 2 Set
3 Pek. Pmsg. Grendel Pintu dan Jendela Volume Pek. Pmsg. Grendel Pintu dan Jendela 2.000 Set
V = 2 Set
V = 1 Set
5 Pek. Pmsg. Kait Angin Jendela Volume Pek. Pmsg.Kait Angin Jendela 1.000 Set
V = 1 Set
X Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding, Beton, Pelat Dak Volume Pek. Pengecatan Dinding, Pelat Dak, Beton dan Kaki Pondasi 62.505 m2
dan Kaki Pondsi
V = V acian
= 62.51 m2
2 Pek. Pengecatan Kayu Kusen Pintu/jendela/ Volume Pek. Pengecatan Kayu Kusen Pintu/Jendela/Ventilasi/Frame 1.892 m2
Ventilasi/Frame
V = 1.892
= 1.892 m2
3 Pek. Pengecatan Plafon + Lis Cornis Volume Pek. Pengecatan Plafon + Lis Cornis 6.600 m1
V = 6.6
= 6.60 m1
V = 6
= 6.00 m1
1 Pek. Instalasi Titik Mata Lampu, Fitting dan Volume Pek.Instalasi Titik Mata Lampu, Fitting Dan Kabel 2.5 mm 4.00 Titik
V = 4
= 4.00 Titik
2 Pek. Psg. Saklar Ganda Volume Pek. Psg. Saklar Ganda 2.00 Titik
V = 2
= 2.00 Titik
3 Pek. Psg. Lampu setara Phillips 23 Watt Volume Pek. Psg. Lampu setara Phillips 23 Wat 4.00 Titik
V = 2
= 4.00 Titik
V = 2 Buah
65 cm
54.5 cm
V = 2 Buah
3 Pek. Pipa Instalasi Air Bersih (PVC 1/2 Inci) AW Volume Pek. Pmsg. Pipa Instalasi Air Bersih (PVC 0.5 Inci) AW 30.00 m1
V = 30 m1
4 Pek. Pmsg. Floor Drain Stainless Volume Pek. Pmsg. Floor Drain Stainless 2.00 Buah
V = 2 Buah
5 Pek. Pmsg. Tempat Sa bun Dinding + Cermin KM Volume Pek. Pmsg. Tempat Sabun Dinding + Cermin KM/WC 2.00 Set
V = 2 Set
6 Pek. Pmsg. Closet Duduk Lengkap Volume Pek. Pmsg. Closet Duduk Lengkap 2.00 Unit
V = 2 Unit
7 Pek. Pmsg. Pipa Air Kotor (PVC 2 Inci) Volume Pek. Pmsg. Pipa Air Kotor (PVC 2 Inci) Pembuangan Air Mandi 5.00 m1
Pembuangan Air Mandi
V = 5 m1
8 Pek. Pmsg. Pipa Air Kotor (PVC 3 Inci) Volume Pek. Pmsg. Pipa Air Kotor (PVC 3 Inci) Pembuangan Kotoran Padat 5.00 m1
Pembuangan Kotoran Padat
V = 5 m1
9 Pek. Saluran Pembuangan Air Limbah Volume Pek. Saluran Pembuangan Air Limbah 5.00 m1
5 cm V = 5 m1
20 cm
1.8
1.3
L1 = Pjng x Lbr
0.3 = 0.3 x 5.1
= 1.53 m2
5.1
L2 = Pjng x Lbr
= 1.5 x 5.1
1.5 = 7.65 m2
5.1
0.1
1.3
5 Pek. Psg. Pipa Hawa Volume Psg. Pipa Hawa 1.000 Buah
V = 1
= 1 Buah
Dihitung Oleh :
Pengelola Teknis Bangunan Gedung Negara
Dinas Pekerjaan Umum Kab. Poso
Satuan
No. Uraian Pekerjaan Volume Harga Satuan Jumlah Harga
I. PEKERJAAN PENDAHULUAN
1 Pek. Pembongkaran Dinding Bata 24.030 m2 Rp 27,500.00 Rp 660,825.00
2 Pek. Pembongkaran Atap + Rangka 5.250 m2 Rp 30,000.00 Rp 157,500.00
3 Pek. Perbaikan Pagar Besi Hollow 1.000 ls Rp 500,000.00 Rp 500,000.00
4 Pek. Bouwplank 9.100 m1 Rp 54,760.00 Rp 498,316.00
Jumlah Pekerjaan Pendahuluan Rp 1,816,641.00
II. PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah < 1.0 meter 2.652 m3 Rp 36,000.00 Rp 95,472.00
2 Pek. Urugan Pasir Bawah Pondasi 0.390 m3 Rp 235,000.00 Rp 91,650.00
3 Pek. Aaanstampang Batu Kali 0.468 m3 Rp 426,045.00 Rp 199,389.06
4 Pek. Pondasi Batu Kali 1.755 m3 Rp 772,300.00 Rp 1,355,386.50
5 Pek. Urugan Tanah Kembali 1.248 m3 Rp 17,260.00 Rp 21,540.48
6 Pek. Urugan Tanah Bawah Lantai 0.540 m3 Rp 235,000.00 Rp 126,900.00
7 Pek. Urugan Pasir Bawah Lantai 0.180 m3 Rp 235,000.00 Rp 42,300.00
8 Pek. Lantai Beton Tumbuk Camp. 1:3:5 0.180 m3 Rp 838,375.00 Rp 150,907.50
Jumlah Pekerjaan Tanah dan Pondasi Rp 2,083,545.54
III. PEKERJAAN BETON (Mutu Beton: K225)
1 Pek. Beton Sloof uk. 15/15 cm, Wbesi = 200 kg/m3, K225 0.263 m3 Rp 7,115,050.00 Rp 1,873,036.91
2 Pek. Beton Kolom Praktis 15/15 cm, Wbesi = 200 kg/m3, K22 0.529 m3 Rp 8,217,080.00 Rp 4,344,781.05
3 Pek. Beton RingBalk 15/15 cm, Wbesi = 200 kg/m3, K225 0.474 m3 Rp 8,049,023.90 Rp 3,815,237.33
4 Pek. Beton Pelat Dak, Wbesi = 150 kg/m3, K225 0.839 m3 Rp 10,518,972.50 Rp 8,821,999.26
Jumlah Pekerjaan Beton Rp 18,855,054.55
IV. PEKERJAAN DINDING, PLESTERAN DAN
ACIAN
1 Pek. Psg. Dinding Bata Trasraam Camp. 1:3 Dinding KM/WC 5.200 m2 Rp 179,575.00 Rp 933,790.00
2 Pek. Psg. Dinding Bata Camp. 1:4 23.618 m2 Rp 169,650.00 Rp 4,006,708.88
3 Pek. Plesteran Dinding dan Kaki Pondasi Camp. 1:4 54.385 m2 Rp 46,825.00 Rp 2,546,577.63
4 Pek. Acian Semen Dinding, Beton, Pelat Dak dan Kaki Ponda 62.505 m2 Rp 18,740.00 Rp 1,171,343.70
Jumlah Pekerjaan Dinding, Plesteran dan Acian Rp 8,658,420.20
V. PEKERJAAN PEMASANGAN KERAMIK
1 Pek. Pmsg. Keramik Lantai 30x30 cm Teras KM/WC 4.020 m2 Rp 252,100.00 Rp 1,013,442.00
2 Pek. Pmsg. Keramik Lantai 20x20 cm setara Roman 3.105 m2 Rp 288,753.00 Rp 896,578.07
3 Pek. Keramik Dinding 20x25 cm setara Roman 14.832 m2 Rp 300,920.00 Rp 4,463,215.35
4 Pek. Pmsg. Keramik Plint 10x20 cm (Dinding Atas KM/WC) 8.500 m1 Rp 33,660.00 Rp 286,110.00
5 Pek. Pmsg. Keramik Plint 10x30 cm (Lantai Teras KM/WC) 7.050 m1 Rp 16,830.00 Rp 118,651.50
Jumlah Pekerjaan Pemasangan Keramik Rp 6,777,996.91
VI. PEKERJAAN ATAP
1 Pek. Kuda-kuda Rangka Atap Baja Ringan 6.928 m2 Rp 255,755.00 Rp 1,771,922.62
2 Pek. Pmsg. Genteng Metal Sakura Roof 6.928 m2 Rp 125,985.00 Rp 872,849.68
Jumlah Pekerjaan Atap Rp 2,644,772.30
VII. PEKERJAAN PLAFON DAN LISTPLANK
1 Pek. Pmsg. Plafon Calsiboard + Rangka 6.000 m2 Rp 190,439.25 Rp 1,142,635.50
2 Pek. Pmsg Lis Plafon Cornis 6.000 m1 Rp 36,739.75 Rp 220,438.50
3 Pek. Pmsg. Listplank 6.000 m1 Rp 92,005.00 Rp 552,030.00
Satuan
No. Uraian Pekerjaan Volume Harga Satuan Jumlah Harga
Mengetahui/Menyetujui:
Kuasa Pengguna Anggaran (KPA)
Kantor Pelayanan dan Pengawasan
Bea Cukai (KPPBC) Poso
No. Jenis Pekerjaan Jumlah Harga
Satuan
No. Uraian Pekerjaan Volume Harga Satuan Jumlah Harga
I. PEKERJAAN INTERIOR
1 Pek. Pemasangan Interior Dinding HPL Front Office 25.000 m2 Rp 857,062.50 Rp 21,426,562.50
2 Pek. Pemasangan Interior Dinding Wallpaper 74.750 m2 Rp 256,520.00 Rp 19,174,870.00
Pek. Pemasangan ACP (Allumunium Composite Panel)
3 20.500 m2 Rp 1,100,000.00 Rp 22,550,000.00
Kolom Vertikal
Pek. Pemasangan ACP (Allumunium Composite Panel)
4 16.000 m2 Rp 1,100,000.00 Rp 17,600,000.00
Border Dinding Vertikal Border Kolom Horizontal
Jumlah Pekerjaan Interior Rp 80,751,432.50
II. PENGADAAN MEJA FRONT OFFICE
1 Pek. Pengadaan Meja Front Office 4.20 meter 4.200 m1 Rp 2,400,000.00 Rp 10,080,000.00
Jumlah Pekerjaan Pengadaan Meja Front Office Rp 10,080,000.00
Total Harga Pekerjaan Rp 90,831,432.50
: Jl. Yos Sudarso No. 25, Kelurahan Bonesompe, Kecamatan Poso Kota Utara , Kab.
LOKASI Poso, Prop. Sulawesi Tengah
TAHUN ANGGARAN : 2016
LUAS TAPAK BANGUNAN : 40.00 meter2
Mengetahui/Menyetujui:
Kuasa Pengguna Anggaran (KPA)
Kantor Pelayanan dan Pengawasan
Bea Cukai (KPPBC) Poso
Kuantita
Unit/ Biaya Jumlah Biaya
No. Jenis Pengeluaran s/Volum
Satuan Satuan (Rp) (Rp)
e
I Upah/Honorarium
1 Honor Kuasa Pengguna Anggaran (KPA) OB 3 450,000 1,350,000
2 Honor Pejabat Pembuat Komitmen (PPK) OB 3 400,000 1,200,000
3 Honor Staf Keuangan OB 3 235,000 705,000
Jumlah Total 3,255,000
PPh 5% (Honorarium) 162,750
Jumlah Total + PPh 5% 3,417,750
Dibulatkan 3,417,750
Tiga Juta Empat Ratus Tujuh Belas Ribu Tujuh Ratus Lima
Terbilang : Puluh Rupiah
Page 23 of 82
RINCIAN KOMPONEN BIAYA PENGAWASAN TEKNIS BANGUNAN GEDUNG NEGARA
RENOVASI GEDUNG KANTOR PELAYANAN DAN PENGAWASAN BEA CUKAI POSO
Kuantita
Unit/ Biaya Jumlah Biaya
No. Jenis Pengeluaran s/Volum
Satuan Satuan (Rp) (Rp)
e
I Upah/Honorarium
1 Honor Pengawas Teknis OB 5 750,000 3,750,000
Jumlah Sub I 3,750,000
Jumlah Total 3,750,000
PPh 5% (Honorarium) 187,500
Jumlah Total + PPh 5% 3,937,500
Dibulatkan 3,937,500
Tiga Juta Sembilan Ratus Tiga Puluh Tujuh Ribu Lima Ratus
Terbilang : Rupiah
Page 24 of 82
BACK UP DATA QUANTITY
DENAH PONDASI
1. GALIAN TANAH PONDASI UTAMA 2. GALIAN TANAH PONDASI KM/WC Volume Galian Pondasi Utama :
0.50 M x 0.30 M x 74 M = 11.100 M3
Halaman dari
BACK UP DATA QUANTITY
Halaman dari
BACK UP DATA QUANTITY
21.873 M3
Beton :
7 PEK. BETON BERTULANG Volume Sloof Beton :
1. Sloof Beton 2. Ring Balok 0.10 M x 0.03 M2 x 74.0 M = 2.22 M3
4 Ф12 0.03 M2 x 16.0 M = 0.48 M3 2.700 M3
Volume Ring Balok :
0.10 M x 0.03 M2 x 72.1 M = 2.16 M3
Ф6 - 15 2.162 M3
Volume Kolom Utama :
3. Kolom Utama 4. Kolom Praktis x 0.09 M2 x 1 Bh = 0.09 M3
0.45 M2 x 1 Bh = 0.45 M3 0.537 M3
4 Ф12 Volume Kolom Praktis :
Ф6 - 15 (h = 3.6 m) x 0.05 M2 x 21 Bh = 1.09 M3
(h = 2.5 m) 0.04 M2 x 8 Bh = 0.29 M3 1.377 M3
Ф6 - 15
Volume Meja Beton
4 Ф12 x 0.06 M3 x 1 Bh = 0.06 M3
0.18 M3 x 1 Bh = 0.18 M3 0.240 M3
5. Meja Beton Dapur 6. Pelat Dak Teras
Halaman dari
BACK UP DATA QUANTITY
Halaman dari
BACK UP DATA QUANTITY
Pembesian :
Sloof :
90.0 M x 0.888 Kg/M x 4 Btg = 319.6 Kg
330.0 M x 0.222 Kg/M x 1 Bh = 73.2 Kg 392.859 Kg
Ring :
72.1 M x 0.888 Kg/M x 4 Btg = 256.0 Kg
264.4 M x 0.222 Kg/M x 1 Bh = 58.7 Kg 314.723 Kg
Kolom Utama :
3.0 M x 0.888 Kg/M x 8 Btg = 21.3 Kg
11.0 M x 0.222 Kg/M x 1 Bh = 2.4 Kg 23.749 Kg
Kolom Praktis :
95.6 M x 0.888 Kg/M x 4 Btg = 339.5 Kg
350.5 M x 0.222 Kg/M x 1 Bh = 77.8 Kg 417.303 Kg
Meja Beton:
3.7 M x 0.888 Kg/M = 3.3 Kg
5.0 M x 0.888 Kg/M = 4.4 Kg 7.694 Kg
Bekisting:
Sloof :
0.5 M2/M x 46.5 M = 23.25 M2 23.250 M2
Ring :
0.5 M2/M x 38.0 M = 19.00 M2 19.000 M2
Kolom Utama :
0.8 M2/M x 3.0 M = 2.40 M2 2.400 M2
Kolom Praktis :
0.3 M2/M x 55.0 M = 16.50 M2 16.500 M2
Meja Beton:
0.5 M2/M x 1.6 M = 0.80 M2 0.800 M2
Halaman dari
BACK UP DATA QUANTITY
Halaman dari
BACK UP DATA QUANTITY
10 PEK. ACIAN DINDING BATA (Termasuk Pelat Dak + 6.06 m2 Kolom Praktis) Acian Dinding (Termasuk Pelat Dak + Kolom Praktis)
233.36 M2 X 2.00 = 466.7 M2
466.728 M2
Halaman dari
BACK UP DATA QUANTITY
42.300 M2
Halaman dari
BACK UP DATA QUANTITY
13 PEK. KUSEN, BINGKAI, KACA DAN PANIL PINTU, JENDELA & VENTILASI
0.971 M3
Bingkai Jendela
Volume Bingkai (Lebar 7 cm) Jendela J1:
x 0.288 M2 x 7 Bh = 2.014 M2
Halaman dari
BACK UP DATA QUANTITY
3.090 M3
5.
62
M
166.700 M2
16 PEK. PEMASANGAN NOK ATAP ZINCALUME Volume Pemasangan Nok Atap Zincalume
Volume Limas Utama
6.00 M + 22.00 M 28.00 M
Volume Limas Tambahan
1.50 M + 5.80 M 7.30 M
35.300 M
Halaman dari
BACK UP DATA QUANTITY
47.300 M
127.804 M2
143.875 M
20 PEK. PENGECATAN DINDING + PELAT DAK Volume Pengecatan Dinding + Pelat Dak
233.36 M2 X 2.0 = 466.7 M2
466.728 M2
21 PEK. PENGECATAN KUSEN/FRAME/DAUN PINTU, KUSEN JENDELA & LISTPLANK Volume Pengecatan Kusen/Frame/Daun Pintu dan Jendela
3.31 M2 + 0.00 M2 + 18.48 M2 = 21.79 M2
170.875 M2
42.300 M2
23 PEK. INSTALASI TITIK MATA LAMPU + KABEL 2.5 mm + FITTING Volume Pekerjaan Instalasi Mata Lampu + Kabel 2.5 mm + Fitting
14.0 Bh
14.0 Bh
1.0 Bh
25 PEK. PSG. LAMPU PHILLIPS 25 WATT Volume Pemasangan Lampu Phillips 25 Watt
6.0 Bh
6.0 Bh
Halaman dari
BACK UP DATA QUANTITY
26 PEK. PSG. LAMPU PHILLIPS 15 WATT Volume Pemasangan Lampu Phillips 15 Watt
8.0 Bh
8.0 Bh
4.0 Bh
2.0 Bh
5.0 Bh
30 PEK. PSG. KUNCI TANAM BIASA Volume Pemasangan Kunci Tanam Biasa
6.0 Bh
6.0 Bh
31 PEK. PSG. ENGSEL PINTU 4 INCI Volume Pemasangan Engsel Pintu 4 inci
6.0 Bh
6.0 Bh
9.0 Bh
33 PEK. PSG. GRENDEL PINTU TANAM Volume Pemasangan Grendel Pintu Tanam
6.0 Bh
6.0 Bh
9.0 Bh
18.0 Bh
9.0 Bh
37 PEK. PSG. BAK AIR 0.3 M3 Volume Pemasangan Bak Air 0.3 m3
3.0 Bh
3.0 Bh
3.0 Bh
Halaman dari
BACK UP DATA QUANTITY
2.0 Bh
40 PEK. SAMBUNGAN AIR PAM + INSTALASI AIR BERSIH Volume Pekerjaan Sambungan Air PAM + Instalasi Air Bersih
1.0 LS
1.0 LS
41 PEK. INSTALASI AIR KOTOR Volume Pekerjaan Sambungan Air PAM + Instalasi Air Bersih
1.0 LS
1.0 LS
1.0 LS
6.24 M3
94.294 M2
44 PEK. PSG. LANTAI KERAMIK WC + TERAS WC + T. CUCI + MEJA BETON Volume Lantai Keramik :
WC Kamar 1 1.35 M x 1.35 M = 1.823 M2
WC Blkg 2.70 M x 1.35 M = 3.645 M2
Tempat. Cuci 1.35 M x 1.43 M = 1.924 M2
Teras WC 1.03 M x 2.85 M = 2.936 M2
11.072 M2
20.340 M2
Halaman dari
BACK UP DATA QUANTITY
86.825 M
Halaman dari
DAFTAR ANALISA HARGA SATUAN
BERDASARKAN SATUAN NASIONAL INDONESIA (SNI)
2 1 M2 Pengecetan tembok baru Ekterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
0.1000 Kg Plamir @ Rp 35,000.00 Rp 3,500.00
0.1000 Kg Cat Dasar @ Rp 35,000.00 Rp 3,500.00
0.2600 Kg Cat Penutup 2 x dgn Dulux Shield @ Rp 165,000.00 Rp 42,900.00
0.0630 Oh Tukang cat @ Rp 90,000.00 Rp 5,670.00
0.0063 Oh Kepala tukang @ Rp 100,000.00 Rp 630.00
0.0200 Oh Pekerja @ Rp 67,000.00 Rp 1,340.00
0.0025 Oh Mandor @ Rp 85,000.00 Rp 212.50
Rp 57,752.50
3 1 M2 Pengecetan kayu ( 1 Lapis Plamir,1 Lapis Cat Dasar, 3 Lapis Cat Penutup )
0.2000 Kg Meni Kayu @ Rp 28,500.00 Rp 5,700.00
0.1500 Kg Plamir @ Rp 35,000.00 Rp 5,250.00
0.1700 Kg Cat Dasar @ Rp 35,000.00 Rp 5,950.00
0.3500 Kg Cat Penutup 3 x @ Rp 59,000.00 Rp 20,650.00
0.1050 Oh Tukang Cat @ Rp 90,000.00 Rp 9,450.00
0.0040 Oh Kepala Tukang @ Rp 100,000.00 Rp 400.00
0.0700 Oh Pekerja @ Rp 67,000.00 Rp 4,690.00
0.0025 Oh Mandor @ Rp 85,000.00 Rp 212.50
No. URAIAN JENIS PEKERJAAN HARGA SATUAN HARGA
Rp 52,302.50
No. URAIAN JENIS PEKERJAAN HARGA SATUAN HARGA
5 1 M² Mengecat dengan meni kayu
0.050 Oh Pekerja @ Rp 67,000.00 Rp 3,350.00
0.003 Oh Mandor @ Rp 85,000.00 Rp 255.00
0.075 Oh Tukang Cat @ Rp 90,000.00 Rp 6,750.00
0.008 Oh Kepala Tukang @ Rp 100,000.00 Rp 800.00
0.250 Kg Cat menie kayu @ Rp 28,500.00 Rp 7,125.00
0.019 Ltr Minyak cat @ Rp 27,500.00 Rp 522.50
Rp 18,802.50
2 1 M2 Pengecetan tembok baru Ekterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
0.1000 Kg Plamir @ Rp 35,000.00 Rp 3,500.00
0.1000 Kg Cat Dasar @ Rp 35,000.00 Rp 3,500.00
0.2600 Kg Cat Penutup 2 x dgn Dulux Shield @ Rp 165,000.00 Rp 42,900.00
0.0630 Oh Tukang cat @ Rp 90,000.00 Rp 5,670.00
0.0063 Oh Kepala tukang @ Rp 105,000.00 Rp 661.50
0.0200 Oh Pekerja @ Rp 80,000.00 Rp 1,600.00
0.0025 Oh Mandor @ Rp 100,000.00 Rp 250.00
Rp 58,081.50
3 1 M2 Pengecetan kayu ( 1 Lapis Plamir,1 Lapis Cat Dasar, 3 Lapis Cat Penutup )
0.2000 Kg Meni Kayu @ Rp 28,500.00 Rp 5,700.00
0.1500 Kg Plamir @ Rp 35,000.00 Rp 5,250.00
0.1700 Kg Cat Dasar @ Rp 35,000.00 Rp 5,950.00
0.3500 Kg Cat Penutup 3 x @ Rp 59,000.00 Rp 20,650.00
0.1050 Oh Tukang Cat @ Rp 90,000.00 Rp 9,450.00
0.0040 Oh Kepala Tukang @ Rp 105,000.00 Rp 420.00
0.0700 Oh Pekerja @ Rp 80,000.00 Rp 5,600.00
0.0025 Oh Mandor @ Rp 100,000.00 Rp 250.00
No. URAIAN JENIS PEKERJAAN HARGA SATUAN HARGA
Rp 53,270.00
No. URAIAN JENIS PEKERJAAN HARGA SATUAN HARGA
5 1 M² Mengecat dengan meni kayu
0.050 Oh Pekerja @ Rp 80,000.00 Rp 4,000.00
0.003 Oh Mandor @ Rp 100,000.00 Rp 300.00
0.075 Oh Tukang Cat @ Rp 90,000.00 Rp 6,750.00
0.008 Oh Kepala Tukang @ Rp 105,000.00 Rp 840.00
0.250 Kg Cat menie kayu @ Rp 28,500.00 Rp 7,125.00
0.019 Ltr Minyak cat @ Rp 27,500.00 Rp 522.50
Rp 19,537.50
I UPAH
1 Tukang 1Hr Rp 85,000.00
2 Tukang Cat 1Hr Rp 90,000.00
3 Kepala tukang 1Hr Rp 105,000.00
4 Pekerja 1Hr Rp 80,000.00
5 Mandor 1Hr Rp 100,000.00
6 Operator Alat Berat 1Hr Rp 110,000.00
7 Pembantu Operator 1Hr Rp 80,000.00
8 Sopir 1Hr Rp 90,000.00
II BAHAN
1 Tanah Timbunan 1M3 Rp 150,000.00
2 Pasir Urug 1M3 Rp 175,000.00
3 Pasir Pasangan (eks Sungai Puna) 1M3 Rp 250,000.00
4 Batu Kali 1M3 Rp 225,000.00
5 Kricak/Split 20 mm (eks Stone Crusher) 1M3 Rp 325,000.00
7 Batu Bata [Ukuran (cm) : 20x10x5] Bh Rp 1,500.00
8 Batako [Ukuran (cm). : 40x20x10] Bh Rp 3,500.00
8 Paving Bh Rp 3,000.00
8 Semen PC 50 Kg 1Zak Rp 75,000.00
10 Semen Warna 1Kg Rp 15,500.00
11 Besi Strip Kg Rp 19,000.00
12 Seng Plat M2 Rp 45,000.00
13 Teakwood Lbr Rp 85,000.00
14 Tripleks Lbr Rp 65,000.00
15 Nusa Board Lbr Rp 80,000.00
16 Gypsum Board tebal 9 mm Lbr Rp 109,700.00
17 Paku Tripleks Kg Rp 29,500.00
18 Profil Gypsum M1 Rp 29,200.00
19 Paku Seng Kg Rp 26,700.00
20 Atap Genteng Metal Sakura Roof Lbr Rp 69,400.00
21 Nok Genteng Metal Bh Rp 40,500.00
22 Atap Seng Gelombang Lbr Rp 50,500.00
22 Atap Metal Zincalume M2 Rp 80,000.00
22 Kunci tanam antik Bh Rp 250,000.00
24 Kunci Tanam Biasa Bh Rp 155,000.00
25 Kunci Tanam Kamar Mandi Bh Rp 76,000.00
26 Kunci Selinder Bh Rp 156,000.00
27 Engsel Pintu 4"( Nelon Ring) Bh Rp 17,078.00
28 Engsel Jendela 3"(Nelon Ring) Bh Rp 17,078.00
29 Hak Angin Bh Rp 21,500.00
30 Tarikan jendela Bh Rp 9,500.00
31 Gerendel Jendela Bh Rp 16,500.00
32 Tegel Granito 60 x 60 cm (KW1) Dos Rp 260,000.00
33 Keramik Plint 10 x 20 cm Dos Rp 100,000.00
34 Keramik Plint 10 x 30 cm Dos Rp 120,000.00
35 Tegel Keramik 30 x 30 cm Dos Rp 120,000.00
NO. URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
36 Tegel Keramik 40 x 40 anti slip Dos Rp 95,000.00
37 Tegel Roman 20 x 20 Lantai KM Dos Rp 185,000.00
38 Tegel Roman 20 x 25 Dinding KM Dos Rp 300,000.00
39 Tegel Keramik motif 16,5 x 33 Dos Rp 190,000.00
40 Stop Kran Brons 1/2 " Bh Rp 23,550.00
41 Isolasi Pipa Bh Rp 4,750.00
42 Floor Drain Bh Rp 29,200.00
43 Pipa Galv 1/2 " Btg Rp 100,000.00
44 Pipa Galv 1" Btg Rp 200,000.00
45 Pipa Galv 1.5" Btg Rp 300,000.00
46 Pipa Galv 2" Btg Rp 400,000.00
47 Pipa PVC 1/2" Btg Rp 23,000.00
48 Pipa PVC 1" Btg Rp 55,000.00
49 Pipa PVC 2" Btg Rp 85,000.00
50 Pipa PVC 3" Btg Rp 110,000.00
51 Pipa PVC 4" Btg Rp 150,000.00
52 Kaca Bening 3mm M2 Rp 161,500.00
53 Kaca Bening 5mm M2 Rp 190,000.00
54 Les Kaca M2 Rp 55,000.00
55 Kapur 1Zak Rp 45,000.00
56 Besi Beton Polos Mutu fy=300 Mpa 1Kg Rp 17,000.00
57 Besi Siku L.60.60.6 1Kg Rp 20,000.00
58 Kawat Beton 1Kg Rp 25,000.00
59 Kawat Duri Roll Rp 2,000,000.00
60 Kayu Klas I 1M3 Rp 3,500,000.00
61 Kayu Klas II 1M3 Rp 2,650,000.00
62 Kayu Klas III 1M3 Rp 1,900,000.00
63 Kayu Dolken Btg Rp 15,000.00
64 Kayu List Profil Btg Rp 20,000.00
65 Cat Dasar 1Kg Rp 35,000.00
66 Cat Kayu Avian 1Kg Rp 59,000.00
67 Cat Warna Merk Yoko/Setara II 1Kg Rp 47,500.00
68 Cat Tembok Metrolite 1Kg Rp 65,000.00
69 Cat Tembok Dulux Shield 1Kg Rp 165,000.00
70 Plamir 1 Kg Rp 35,000.00
71 Cat Meni 1 Kg Rp 28,500.00
72 Minyak Bekisting 1Ltr Rp 4,500.00
73 Meni Besi Ltr Rp 25,250.00
74 Minyak Cat Ltr Rp 27,500.00
75 Kertas Gosok Lbr Rp 9,500.00
76 Paku Biasa Kg Rp 30,500.00
77 Lampu Philips asli 25 Watt Bh Rp 60,000.00
78 Lampu Philips asli 18 Watt Bh Rp 55,000.00
79 Lampu Philips asli 8 Watt Bh Rp 35,000.00
80 Lampu RMI + Grille 2x18W Bh Rp 575,000.00
81 Saklar Ganda Bh Rp 55,000.00
82 Saklar Tunggal Bh Rp 37,500.00
83 Stop Kontak Bh Rp 47,500.00
84 Sekring MCB Bh Rp 50,000.00
85 Wastafel Toto + Cermin + Tempat Sabun Bh Rp 1,600,000.00
86 Kloset Duduk toto Bh Rp 2,500,000.00
87 Kloset Jongkok toto Bh Rp 300,000.00
NO. URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
88 Urinoir toto kotak Bh Rp 3,100,000.00
89 Step nosing Bh Rp 35,000.00
90 Baut Bh Rp 1,500.00
91 Besi Profil WF 1 Kg Rp 20,000.00
92 Besi Hollow 2x2 M1 Rp 13,000.00
93 Kaki seribu 65 M1 Rp 13,000.00
94 Profil L 45 M1 Rp 11,000.00
95 Kosen Aluminium 4.5 cm warna Coklat M1 Rp 140,000.00
96 Kunci penggantung Bh Rp 5,000.00
97 Braket T 20 Bh Rp 2,750.00
98 Braket T 45 Bh Rp 6,500.00
99 Braket L Bh Rp 4,000.00
100 Paku Srup kg Rp 25,000.00
101 Main Truss (C 75.75) M1 Rp 24,000.00
102 Reng (TR 32.45) M1 Rp 18,000.00
103 Screw 12-14x20 (Truss) Bh Rp 500.00
104 Screw 10-14x20 (reng) Bh Rp 500.00
105 Dynabolt Bh Rp 800.00
106 AM-30 Mortar Flex Kg Rp 20,000.00
107 Besi Beugel U + Baut Bh Rp 75,000.00
108 Besi Beugel Strip + Baut Bh Rp 45,000.00
109 Besi beton Dia. 22mm M' Rp 48,000.00
110 besi UNP 150.15.5 M' Rp 300,000.00
111 Besi Kotak M' Rp 35,000.00
112 Besi Plat 3mm Lbr Rp 1,200,000.00
113 Besi Strip M' Rp 15,000.00
114 Kawat Wiremesh M2 Rp 125,000.00
115 Engsel Bubut untuk pintu kamar Bh Rp 25,000.00
116 Grendel untuk pintu kamar Bh Rp 35,000.00
117 Pipa Besi Dia. 2,5" m' Rp 50,000.00
118 Ijuk Ikat Rp 50,000.00
119 Lem Fox 1 Kg Rp 15,000.00
REKAPITULASI BIAYA
PEMBANGUNAN RUMAH TINGGAL
KO ASEN
JEMBATAN BESI , JAKARTA BARAT
JUMLAH #REF!
JASA PELAKSANAAN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!
TERBILANG :
RAMLI