BI/EWO/JO No.: 10-01390 600056
No.:
Building Risk Mitigation Upgrade Site Visit
Project Title: September 18th, 2017
At Berri Gas Plant Date:
SAPMT: Mr. Turki Alaqil, PE Time:
LSTK Contractor: Mohamed Ibrahim Rizk Location: Berri Gas Plant
Project Manager: Adib Ghanim Visit No.: 001
INTRODUCTION
SLFE Project Team shall conduct a site visit to Berri Gas Plant on Monday September 18th, 2017
to verify the existing facilities which are required to be demolished as per the project scope and to
explore actual site conditions for the validation of existing drawings and the drawings received with
ITB package as well as to identify the demolition activities interface / Tie-ins limits that will include
isolation, disconnection and removal of the existing utilities serving the buildings to be demolished.
A team from various engineering disciplines will perform this visit.
PURPOSE
The purpose of this document is to define the objective of the visit for each discipline and detail the
activities that shall be done during this visit by project team.
Also the document shall detail the support required from client at the site as mentioned under each
discipline.
VISIT DETAILS
1. CIVIL
2. Piping
Page 1 of 4
SITE VISIT SCOPE OF WORK
3. Communication
4. Electrical:
5. FDAS:
Page 2 of 4
SITE VISIT SCOPE OF WORK
6. Architectural:
7. Structural:
8. Instrumentation
To familiarize scope requirements with the existing facilities.
To identify the location of new DDC controllers
Identify the location of new detectors, alarm,horns
Verify the cable routing path at site.
Collect updated layout drawings at site.
Collect the existing DCS system information and operator workstation data.