OSM SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AOZ
ENGG CERT
IAD
MSA
ISSUED FOR REVIEW
DESCRIPTION
BI-10-09111-0002
JO/EWO
10-09111-
0002
DATE
09/29/19
DISCIPLINE
ENGINEER
MSA
09/10/19
DATE:
PROJECT
ENGINEER
09/10/19
IAD
SIL ASSESSMENT STUDY REPORT
DATE:
CERTIFIED
AOZ
09/10/19
DATE:
CONSTRUCTION
AGENCY
09/10/19
DATE:
OPERATIONS Prepared by
OSM
09/10/19
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
SEPT 2019
_____________________
(DCC) NO. 10-0010-09111-0002
` SIL ASSESSMENT STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AOZ
ENGG CERT
TABLE OF CONTENTS
IAD
MSA
1. INTRODUCTION............................................................................................................................................... 3
2. SCOPE ............................................................................................................................................................. 3
3. OBJECTIVES ..................................................................................................................................................... 3
4. SIL STUDY TEAM.............................................................................................................................................. 4
ISSUED FOR REVIEW
DISCIPLINE
ENGINEER
MSA
09/10/19
DATE:
PROJECT
ENGINEER
IAD
09/10/19
DATE:
CERTIFIED
AOZ
09/10/19
DATE:
CONSTRUCTION
AGENCY
09/10/19
DATE:
OPERATIONS
OSM
09/10/19
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. 10-0010-09111-0002
` SIL ASSESSMENT STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AOZ
1. INTRODUCTION
ENGG CERT
IAD
The SIL was facilitated by SNC Lavalin Fayez Engineering and attended by Engineers
from Saudi Aramco and SLFE. The SIL assessment session was conducted at SLFE
office in Al-Khobar on 11th Sep 2019.
ISSUED FOR REVIEW
The purpose of the SIL review within this study is to assign safety integrity levels to each
DESCRIPTION
Safety Instrumented Function (SIF) in accordance with Saudi Aramco standards (SAEP-
250 Published 21 January 2018) in order to demonstrate that the Safety Instrumented
Functions (SIFs) proposed provide adequate levels of risk reduction and meets the Risk
Target Frequencies identified by Layer of Protection Analysis (LOPA).
Findings from the study session were recorded in LOPA worksheets (provided by Saudi
Aramco P&CSD) as per Saudi Aramco standards.
JO/EWO
10-09111-
0002
2. SCOPE
DATE
09/29/19
The scope of SIL assessment consists of facilitating and chairing SIL workshop,
performing SIL assessment using Layer of Protection Analysis (LOPA) methodology in
NO.
REV
DISCIPLINE
ENGINEER accordance with the guidelines provided in the Saudi Aramco Engineering Procedure,
MSA
DATE:
09/10/19 SAEP-250 (21 January 2018) & IEC-61511.
PROJECT
ENGINEER
The purpose of this study is to access the Safety Instrumented Functions (SIFs) so that
IAD
DATE:
09/10/19
the Design of Safety Integrated Systems is adequate to protect personnel, environment
CERTIFIED
AOZ and assets against potentially hazardous situation. The SIL assignment study included all
09/10/19
DATE: high-risk areas, which were developed during the HAZOP study undertaken on original
CONSTRUCTION
AGENCY
design basis.
09/10/19
DATE:
OPERATIONS
The team identified 03 SIF loops within the scope of the project. SIL Study was conducted
OSM for risk scenarios (identified during HAZOP) and recommended SIFs (identified in HAZOP
09/10/19
DATE:
& listed in C&E) were evaluated for SIL Assignment.
CONTROL NUMBER
VERIFICATION
EDSD
3. OBJECTIVES
DATE:
The objective of this SIL study is to systematically identify SIF required to prevent or
BY:
REVISIONCERTIFICATION
mitigate a hazardous event and to determine its Safety Integrity Level (SIL) required for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
` SIL ASSESSMENT STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AOZ
The SIL determination study covers all the Safety Instrumented Functions (SIFs) as
ENGG CERT
IAD
Safety Integrity Level determination study is the part of overall safety studies, which
concentrates on risks associated with hazardous event and identification of independent
protection layers to mitigate that specific hazardous event. Establishing the necessary risk
reduction requirement and the corresponding SIL of SIFs is the purpose of SIL
ISSUED FOR REVIEW
assessment.
DESCRIPTION
SIL assessment/determination is the phase 2 activity of the overall Safety Lifecycle (SLC)
of the SIS (Figure 8 of IEC 61511-1:2003). This Phase 2 activity in IEC 61511- 1:2003 is
referred as “Allocation of the Safety Functions to Protection Layers”.
Safety Life Cycle Phase 1, i.e.” Hazard & Risk Assessment”, is required to be undertaken
before the commencement of Phase 2. Results of Phase 1 are required to be available
before the start of Phase 2.
JO/EWO
10-09111-
0002
• SIL Facilitator
DISCIPLINE
ENGINEER
MSA
• Saudi Aramco Loss Prevention Department
09/10/19
DATE: • Saudi Aramco P&CSD/PASD/HIPS Department
PROJECT
ENGINEER
• Saudi Aramco Proponent/ operations representative(s)
IAD
DATE:
09/10/19
• Saudi Aramco Project Management team
CERTIFIED
AOZ • SLFE Instrumentation Engineer
09/10/19
DATE: • SLFE Process Engineer
CONSTRUCTION
AGENCY
• SLFE Project Management
09/10/19
DATE:
OPERATIONS
OSM
09/10/19
Refer to Appendix A of this report for list of attendees.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. 10-0010-09111-0002
` SIL ASSESSMENT STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AOZ
IAD
ABBREVIATION
ALARP As Low as Reasonably Practicable
MSA
09/10/19
DATE:
OPERATIONS
OSM
09/10/19
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. 10-0010-09111-0002
` SIL ASSESSMENT STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION