A. Scope of Works
1. Surface preparation
a. Installation of yellow spacer
b. Sand papering of steel fence for removal of existing paint
2. Painting Works
a. Primer Coating
b. Top Coating
B. Additional Works
1. Installation of Blue Sheet along parking area of MCB & RTI area for cover
protection of all employee’s vehicle.
2. Applying of Polituff (Body Filler) for all un even surface of steel gate
3. Primer Coating of portion w/ polituff
This is to certify that workmanship is guaranteed for any defect within a period of 6
months from date of completion.
Froilan Espinosa
Project Engineer
Noted:
Conforme:
___________________________________ ____________
Client Date