You are on page 1of 2

Zhang Hua

Dear Mr Manivannan
From: Manivannan [manivannan@mabanisteel.com]
Sent: 02 July 2012 08:37 Please refer to our reply in your trailing email.
To: 'Zhang Hua'
Cc: 'Faisal Zikria'; 'Sajo Antony'; 'Account'; 'Sattia '
Subject: RE: Mabani Quote Q-QA-11203 Rev-0 (40MT) / HX Steel / Thanks & regards
Enquiry for Proposed Office Building at DSSA : Supply offer
Attachments: Q-QA-11203 Supply offer Rev-1.pdf Zhang Hua
HXsteel International Engineering W.l.l
7th Floor, IBQ Building at Airport Road
Dear Mr. Zhang Hua, P.O.Box 23917, Doha, Qatar
Fax: +974-44215631
Mobile: +974-55768365
www.hxsteel-engineering.com
Pls. find attached our revised supply offer (Rev-1) with the below discussed Strive to deliver quality, on-time and value engineering service to our client.
points.
Pls. accept & Sign and stamp at page 17 of 18 and send back to us. ------------------------------------------------------------------------------------------------------------
---------------
Further communication will be handover by our Customer Service department. The information contained in this e-mail and any accompanying documents may contain
information that is confidential or otherwise protected from disclosure. If you are not the intended
recipient of this message, or if this message has been addressed to you in error, please
If you need any further details pls. inform to us. immediately alert the sender by reply e-mail and then delete this message, including any
attachments. Any dissemination, distribution or other use of the contents of this message by
Thanks & Regards anyone other than the intended recipient is strictly prohibited.

Manivannan From: Manivannan [mailto:manivannan@mabanisteel.com]


Sr. Estimation Engineer (HRSS) Sent: 01 July 2012 17:08
To: 'Zhang Hua'
Cc: 'Faisal Zikria'; 'Sajo Antony'; 'Account'; 'Sattia '
Subject: RE: Mabani Quote Q-QA-11203 Rev-0 (40MT) / HX Steel / Enquiry for
Proposed Office Building at DSSA : Supply offer

Ras Al Khaimah, U.A.E Dear Mr. Zhang Hua,


Mobile : +(971-50) 9504535
Office Phone : + (971-7) 244-7464 Ext. 780
Office Fax : + (971-7) 244-7277
We can accept the payment term 40% (by TT) once approval of approval
www.mabanisteel.com drawings, 60% (by TT) material at site subject to the following conditions:-
[Accepted]
1. Contract to be signed by 02nd July 2012 (tomorrow). [Confirmed]
From: Zhang Hua [mailto:zh@hxsteel-engineering.com]
2. Approval drawing submittal - 10th July 2012 [Accept 9th July 2012]
Sent: Sunday, July 01, 2012 7:33 PM
To: 'Manivannan' 3. Receipt of Approved drawing (or) Approved as is & Down
Cc: 'Faisal Zikria'; 'Sajo Antony'; 'Account'; 'Sattia ' payment - 12th July 2012 [Accept 11th July 2012]
Subject: RE: Mabani Quote Q-QA-11203 Rev-0 (40MT) / HX Steel / Enquiry for 4. Dispatch of material from our factory -02nd August 2012 [Accept 26th
Proposed Office Building at DSSA : Supply offer July 2012]( Mabani accepted 31st July)

1 2
5. Last payment : After 7 days of receipt of material at site. [Confirmed] Axial Force (P) 0.26089 kN -50.5508 kN
Shear Force (V) 49.42139 kN -56.2998 kN
Note: Panel colour, Insulation & paint colour are assumed as stated in our offer, Moment (M) 42.76245 kN.m -94.8297 kN.m
the same to be confirmed (at your end) today with order confirmation. [Mabani
to send all their panel colour available for HXsteel to select, Mabani shall
submit all their available wall panel profile for HXsteel to select] Design Joint Forces for Roof Rafters

Expecting reply on this. Axial Force (P) 0.26089 kN


Shear Force (V) -56.29976 kN
Thanks & Regards Moment (M) -94.82974 kN.m

Manivannan
Sr. Estimation Engineer (HRSS)
Mezzanine Floor

Maximum Joint Force for Primiary Beam at Mezzanine

Axial Force (P) 44.9103 kN -1.1521 kN


Ras Al Khaimah, U.A.E Shear Force (V) 55.2372 kN -68.3701 kN
Mobile : +(971-50) 9504535 Moment (M) 55.1753 kN.m -140.2872 kN.m
Office Phone : + (971-7) 244-7464 Ext. 780
Office Fax : + (971-7) 244-7277
www.mabanisteel.com Design Joint Forces for Primiary Beams @ Mezzanine

Axial Force (P) 44.91029 kN


From: Zhang Hua [mailto:zh@hxsteel-engineering.com]
Shear Force (V) -68.37007 kN
Sent: Sunday, July 01, 2012 12:50 PM
Moment (M) -140.2872 kN.m
To: 'Sattia '
Cc: 'Faisal Zikria'; 'Sajo Antony'; 'Account'; 'Manivannan'
Subject: RE: Mabani Quote Q-QA-11203 Rev-0 (40MT) / HX Steel / Enquiry for
Proposed Office Building at DSSA : Supply offer Maximum Joint Force for Joists at Mezzanine

Axial Force
Dear Mr Sattia (P) 50.70839 kN 0.682887 kN
Shear Force
For mezzanine joists also go for double side welded. (V) 82.42186 kN -93.6788 kN
Moment (M) 28.11434 kN.m -177.381 kN.m
The member end forces are as follows:-
Design Joint Forces for Joists @ Mezzanine
Roof Rafter
Axial Force
Maximum Joint Force for Roof Rafters (P) 50.70839 kN
Shear Force
(V) -93.67876 kN
3 4

You might also like