22 September 2016
Prepared for:
Meinhardt Arabia
P O Box 8089, Riyadh 11482
7th Floor, North Tower
Faisal Foundation - Al Khaiyria Building
King Fahd Highway, Olaya, Riyadh
Kingdom of Saudi Arabia
Tel: +966 112011080
Fax: +966 112011668
www.meinhardtgroup.com
TABLE OF CONTENTS
1 TABLE OF CONTENTS
i REFERENCES
2 ABBREVIATION
4 FIXTURE COUNT
4b REFERENCE
REFERENCES
ABBREVIATIONS :
AF - ABLUTION FAUCET
HB - HOSE BIBB
hwrt - HOT WATER RECOVERY RATE
JS - JANITOR SINK
KS - KITCHEN SINK
LAV - LAVATORY
SHO - SHOWER HEAD
TDH - TOTAL DYNAMIC HEAD
WC - WATER CLOSET
ft - FEET
gals - GALLONS
gph - GALLON PER HOUR
gpm - GALLON PER MINUTE
kg - KILOGRAM
KW - KILOWATT
l/day - LITERS PER DAY
l/min - LITERS PER MINUTE
LPH - LITERS PER HOUR
l/s - LITERS PER SECOND
l/tree/day - LITERS PER TREE PER DAY
l/m2/day - LITERS PER SQUARE METER PER DAY
m - METER
m/s - METER PER SECONDS
m2 - SQUARE METER
m3 - CUBIC METER
m3/day - CUBIC METERS PER DAY
m3/min - CUBIC METERS/MINUTE
3
m /s - CUBIC METERS/SECOND
min - MINUTE
mm - MILLIMETER
pcs - PIECES
psi - POUNDS PER SQUARE INCH
qty - QUANTITY
SEC - SECONDS
WSFU - WATER SUPPLY FIXTURE UNIT
INTERNAL WATER SUPPLY CALCULATIONS
1
INTERNAL WATER SUPPLY CALCULATIONS
2
INTERNAL WATER SUPPLY CALCULATIONS
3
FIXTURE COUNT
1. Fixture Count:
FLOOR NO. /BLDG WC WC-1 WC-6 Laundary LAV-2 KS Shower/Bathtub PS HB (Roof) SUB-TOTAL
GF B06 (PRELIMANARY BOYS SCHOOL)
Public 0 0 0 0 0 0 0 0 2 2
Private 6 0 0 1 8 2 4 6 0 27
TOTAL 6 0 0 1 8 2 4 6 2 29
`
2. Total Water Supply Fixture Unit 3. Total RAW Water Minimum Required Flow Rate:
(Based on NPC 2006 Table 10.14.2A )
FIXTURES NO WSFU TOTAL From demand load chart, for system based on Flush Tank
WC (Western, Flush Tank, Public, Handicap) 6 x 2.5 15 Refer to NPC 2006 Table 10.14.2B
WC-1 (Western, Flush Tank, Public) 0 x 2.5 0
WC-1 (Western, Flush Tank, Private) 0 x 2.5 0
WC-6 (Eastern, Flush Tank, Public) 0 x 2.5 0 Total WSFU = 50.6 wsfu
WC-6 (Eastern, Flush Tank, Private) 0 x 2.5 0
Laundry 1 x 2.0 2
LAV-2 (Private) 8 x 0.7 5.6 Minimum Require Flow Rate = 29.2 gpm
LAV-2(Public) 0 x 1.0 0
KS (Public) 2 x 1.5 3 = 1.84 L/S
Shower 4 x 2.0 8
PS 6 x 2.0 12
HB 2 x 2.5 5
TOTAL 50.6 `
1
PROJECT: MODEL-1 B02b
BOOSTER PUMP WATER PRESSURE CALCULATION
Head loss calculation using ( 2 ) HAZEN-WILLIAMS Formula
Accumulative Pressure
ID Pipe Inner diameter
RE Reynolds number
DN Nominal diameter
V Mean Velocity
GH Static heal
Loss m per m
0.6 Butterfly valve
DH Total loss
L Pipe length
Q Flow rate
2.0 Strainer
0.5 reducer
0.9 tee
no. DN mm m mm L/S l/s 1/1 m m/s 1/1 1/1 m m m m m m
A-B (From Pump) 50 pvc 42.6 0.4 145 1.84 1.84 1 1 2 1 1 4.2 1.2909 54994.384 0.04317 4.317 0.017 0.357 0.374 0.37 0.3740217
B-C 40 pvc 34 7.2 145 1.19 1.19 1 1 1.2 1.3107 44563.384 0.05777 5.777 0.416 0.105 0.521 0.52 0.5210004
C-D 40 pvc 34 4.4 145 0.79 0.79 2 1 1.5 0.8701 29584.095 0.02705 2.705 0.119 0.058 0.177 0.18 0.1769065
D-E 32 pvc 27.2 12.6 145 0.41 0.41 1 3 1 3.5 0.7056 19192.214 0.02381 2.381 0.3 0.089 0.389 0.39 0.3887783
E-F 25 pvc 21.2 1.5 145 0.19 0.19 1 2 2 0.5383 11411.109 0.01929 1.929 0.029 0.03 0.058 0.06 0.0584649
F-G 25 pvc 21.2 1.5 145 0.13 0.13 2 2 1 2.9 0.3683 7807.601 0.00955 0.955 0.014 0.02 0.034 0.03 0.0343741
G-H 20 pvc 17 0.9 145 0.06 0.06 1 1 1 1.4 0.2776 4718.476 0.00732 0.732 0.007 0.005 0.012 0.01 0.0120845
Static head = m
total friction loss = 1.57 m
total dynamic head = 1.57 m
CLIENT :
MINISTRY OF INTERIOR
KINGDOM OF SAUDI ARABIA
Planing & Development
Modernization Program
1 LAVATORY 1.0
CONSULTANT :
DESIGNER :
PO Box 8089 Riyadh 11482
a. System Capacity
c. System Requirement
1.84
CAPACITY FOR EACH BOOSTER PUMP = 1.84 l/s Vs 22.00 m
P= 0.72 kW
P= 0.80 kW