Analisa Harga Satuan S.N.I
Analisa Harga Satuan S.N.I
NO. U RAIAN KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga
A B C D E F G=(CXE) H = (C X F ) I=(G+H)
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
#REF! 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 #N/A #N/A
Tenaga
Perkerja 0.400 Oh #N/A #N/A
Tukang Gali Oh #N/A #N/A
Kepala Tukang Oh #N/A #N/A
Mandor 0.040 Oh #N/A #N/A
#REF! 1 m3 Urugan Tanah Kembali 0.00 #N/A #N/A
Tenaga
Perkerja 0.192 Oh #N/A #N/A
Tukang Gali - Oh #N/A
Kepala Tukang - Oh #N/A
Mandor 0.019 Oh #N/A #N/A
V PEKERJAAN PELESTERAN
#REF! 1 m2 Plesteran Dinding 1Pc : 3Ps #N/A #N/A #N/A
Bahan
Semen Portland 6.480 Kg #N/A #N/A
Pasir Pasang 0.019 m3 49,500.00 940.50
Tenaga
Perkerja 0.200 Oh #N/A #N/A
Tukang Batu 0.150 Oh #N/A #N/A
Kepala Tukang 0.015 Oh #N/A #N/A
Mandor 0.010 Oh #N/A #N/A
#REF! 1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm #N/A #N/A #N/A
Bahan
Semen Portland 1.840 Kg #N/A #N/A
Kapur Padam 0.006 m3 #N/A #N/A
Pasir Pasang 0.014 m3 49,500.00 693.00
Tenaga
Perkerja 0.200 Oh #N/A #N/A
Tukang Batu 0.150 Oh #N/A #N/A
Kepala Tukang 0.015 Oh #N/A #N/A
Mandor 0.010 Oh #N/A #N/A
PEKERJAAN BETON
1 m³ Membuat Beton 1 Pc : 2 Ps : 3 Kr #N/A #N/A #N/A
Bahan
Semen Portland 232.000 Kg #N/A #N/A
Pasir Beton 0.520 m3 49,500.00 25,740.00
Koral Beton 0.780 m3 #N/A #N/A
Tenaga
Perkerja 1.650 Oh #N/A #N/A
Tukang Batu 0.250 Oh #N/A #N/A
Kepala Tukang 0.025 Oh #N/A #N/A
Mandor 0.080 Oh #N/A #N/A
Bahan
Seng Gelombang 3" x 6" BJLS 28 0.300 Lbr 49,500.00 14,850.00
Paku Biasa ½" - 1" atau Sekrup 0.100 Kg #N/A #N/A
Papan Kayu Borneo 0.0190 m3 #N/A #N/A
Besi Strip 0.5000 Kg #N/A #N/A
Tenaga
Perkerja 0.150 Oh #N/A #N/A
Tukang Kayu 0.250 Oh #N/A #N/A
Kepala Tukang 0.025 Oh #N/A #N/A
Mandor 0.00125 Oh #N/A #N/A
NO JENIS UPAH SPESIFIKASI harga real SATUAN
Harga
Harga
No. Uraian Pekerjaan Satuan Volume Satuan
(Rp.) (Rp.)
A. PEKERJAAN TANAH
A.1 Galian Tanah Biasa M3 362.51 #N/A #N/A
Sub Total A #N/A
B. PEKERJAAN PASANGAN
B.1 Urugan Pasir M3 27.89 #N/A #N/A
B.2 Pasangan Batu kali 1 PC : 4 Pasir M3 180.18 #N/A #N/A
B.3 Plesteran 1 : 3 M2 471.10 #N/A #N/A
B.4 Cor Beton M3 21.88 #N/A #N/A
Sub Total B #N/A
TOTAL #N/A
REKAPITULASI DRAINASE = 100 m'
Jumlah
No. Uraian Pekerjaan
(Rp.)
1 PEKERJAAN TANAH #N/A
2 PEKERJAAN PASANGAN #N/A
Jumlah #N/A
PPn 10 % #N/A
Jumlah Biaya #N/A
Dibulatkan Rp 196,117,000.00
Terbilang : Seratus Sembilan Puluh Enam Juta Seratu Tuju Belas Ribu Rupiah