You are on page 1of 4

PERHITUNGAN

Diketahui:
Ukuran Casing = OD 7” dan ID 6.366”
Tubing = OD 3½” dan ID 2.98”
Kedalaman OE = 1671 ft
Estimasi TOC = 1440 ft
Volume lubang perforasi = 0.30 cuft/hole
Total Hole = 120 Hole
Slurry Yield = 1.22 cuft/sack
Water = 4.58 gps
Gas Migration Control = 1 gps
Foam Eliminator = 0.01 gps
Total Mixing Fluid = 5.59 gps
Berat semen/sack = 94 lb/sack
Fluid Loss Ccontrol = 0.35%
Friction Reducer = 0.25%
Retarder = 0.25%
A. Kapasitas
1. Kapasitas Casing
𝐼𝐷2
Kapasitas Casing 7” =
1029,4

6,366"2
=
1029,4

= 0.0394 𝑏𝑏𝑙/𝑓𝑡
2. Kapasitas Tubing
𝐼𝐷2
Kapasita Tubing 31/2” =
1029.4
2.98"2
=
1029.4
= 0.0086 𝑏𝑏𝑙/𝑓𝑡
B. Volume
1. Volume Cement in Casing
(𝐼𝐷)2
Volume = 1029.4 × 𝐿 → L = (OE – Estimasi TOC)
6..366"2
= × (1671 − 1440)
1029.4

= 9.1014 bbl
2. Volume Cement in Formation
Volume = Volume Hole x Total Hole x 0.1781
= 0.30 cuft/hole x 120 hole x 0.1781
= 6.412 bbl
3. Displacement Volume
Volume = Tubing Capacity × h TOC (tubing in)
= 0.0086 bbl/ft × 1241.305 ft
= 10.675 bbl

4. Volume Total Slurry


Volume = Volume Cement in Casing + Volume Cement in Formation
= 9.1 bbl + 6.412 bbl
= 15.512 bbl

C. Sack of Cement Required


𝑉𝑜𝑙𝑢𝑚𝑒 𝐶𝑒𝑚𝑒𝑛𝑡 𝑆𝑙𝑢𝑟𝑟𝑦
Sack of Cement Requied = 𝑆𝑙𝑢𝑟𝑟𝑦 𝑌𝑖𝑒𝑙𝑑
15.512 𝑏𝑏𝑙
= 1.22 𝑐𝑢𝑓𝑡/𝑠𝑎𝑐𝑘 → 15.512 bbl = 87.1 cuft

= 71.393 Sack = 72 Sack


D. Top of Cement
1. Tubing Out
𝑉𝑜𝑙𝑢𝑚𝑒 𝑆𝑙𝑢𝑟𝑟𝑦
Length = 𝐼𝐷2
( )
1029.4
15.512 𝑏𝑏𝑙
= 6.366"2
( )𝑏𝑏𝑙/𝑓𝑡
1029.4

= 393.706 ft
TOC = OE Depth – Length
= 1671 ft – 393.706 ft
= 1277.294 ft
2. Tubing In
𝑉𝑜𝑙𝑢𝑚𝑒 𝑆𝑙𝑢𝑟𝑟𝑦
Length = (𝑉𝑜𝑙𝑢𝑚𝑒 𝐴𝑛𝑛𝑢𝑙𝑢𝑠+𝑉𝑜𝑙𝑢𝑚𝑒 𝑇𝑢𝑏𝑖𝑛𝑔)
15..512 𝑏𝑏𝑙
= (0.0275+0.0086)𝑏𝑏𝑙/𝑓𝑡

= 429.695 ft
TOC = OE Depth – L
= 1671 ft – 429.695 ft
= 1241.305 ft

E. Volume Fluida yang Di pompakan


1. Water Volume
Volume = Additif dalam gps × Total sack semen
= 4.58 gps × 72 Sack
= 329.76 gal

2. Volume Gas Migration Control


Volume = Additif dalam gps × Total sack semen
= 1 gps × 72 sack
= 72 gal
3. Volume Foam Eliminator
Volume = Additif dalam gps × Total sack semen
= 0.01 gps × 72 sack
= 0.72 gal
4. Volume Total Mixing Fluid
Volume = Additif dalam gps × Total sack semen
= 5.59 gps × 72 Sack
= 402.48 gal

F. Berat Additif
1. Fluid Loss Control
FLC 0.35% BWOC = % additive × 94 lb/sack × Total Sack Semen
= 0.35% × 94 lb/sack × 72 sack
= 23.688 lb = 0.252 sack
2. Friction Reducer
FR 0.25% BWOC = % additive × 94 lb/sack × Total Sack Semen
= 0.25% × 94 lb/sack × 72 sack
= 16.92 lb = 0.18 sack
3. Retarder
R 0.25% BWOC = % additive × 94 lb/sack × Total Sack Semen
= 0.25% × 94 lb/sack × 72 sack
= 16.92 lb = 0.18 sack

Hal ini bertujuan agar nantinya ketika semen sudah masuk seluruhnya
kedalam sumur, dan kemudian dilakukan proses hesitation agar semen masuk
kedalam perforasi, secara otomatis akan terjadi pemurunan ketinggian semen.
Saat semen turun ketinggian TOC tidak akan berada dibawah dari zona interval
teratas dikaenakan kita suah estimasi kan sebelumnya ketinggian TOC nantinya.

You might also like