Persons responsible for leveling and pouring concrete 7
Person in charge of handling the mixer truck 1
Person in charge of guiding the mixer truck 1
Person in charge of providing material 1
Term project 14 meses
The metrado be 36000 m2
Assuming is 6000 mts
pavement width 6 mts
With a yield of 2.5 100 m2/dia
Professionals
chief SSOMA 1
Prevencionista 1
As does not exceed the 20 staff committee does not need
a security supervisor 1
OCCUPATIONAL SAFETY AND
ENABLING AND URBAN CONSTRUCTION WORKS (WORKS O
OF HEALTH IN THE
ENT PLAN FOR SAFETY GLB. 1 S/ 485,566.10 S/ 485,566.10
URING WORK
GLB. 1 S/ 0.00 S/ 0.00
WORK)
DIRECT COST
INDIRECT COST
GENERAL EXPENSES 25%
UTILITIES 10%
SUBTOTAL
S/ 1,230,147.51
S/ 1,230,147.51
S/662,387.12
S/473,133.66
S/189,253.46
S/1,892,534.63
S/340,656.23
S/2,233,190.86
RESUMEN CODE (CODE) DESCRIPTION (DESCRIPTION)
Human resource
0001 CHIEF SSOMA MONTH 14.0000
0002 Prevencionista MONTH 12.0000
0003 RESPONSIBLE FOR OFFICE MONTH 13.0000
0004 DRIVER MONTH 12.0000
0005 SUPPORT STAFF IN TECHNICAL AREA MONTH 12.0000
Material
0006 PHOTOGRAPHIC CAMERA UND 4.0000
0007 FURNITURE MONTH 26.0000
0008 PRINTERS AND LEAVES UND 2.0000
0009 NOTEBOOKS APUNTE - LEGALIZED UND 12.0000
0010 OFFICE WORK SAFETY MONTH 14.0000
0011 OFFICE FURNITURE MONTH 14.0000
Equipment
0009 VAN MONTH 12.0000
0010 GAS MONTH 12.0000
0011 MAINTENANCE MONTH 12.0000
RIPTION) UNIT (UNIT) I metrado Unit price
485,566.10
man resource
15,000.00 210,000.00 1.50 10000.00
6,750.00 81,000.00 1.50 4500.00
3,750.00 48,750.00 1.50 2500.00
2,250.00 27,000.00 1.50 1500.00
2,250.00 27,000.00 1.50 1500.00
393,750.00
Material
292.37 1,169.49 0.00 0.00
300.00 7,800.00 0.00 0.00
584.75 1,169.49 0.00 0.00
73.09 877.12
850.00 11,900.00
250.00 3,500.00
26,416.10 0.00 0.00
Equipment
5,000.00 60,000.00 0.00 0.00
300.00 3,600.00 0.00 0.00
150.00 1,800.00 0.00 0.00
65,400.00 0.00 0.00
Total price
485,566.10
BENEFIT OF WORKERS
50% 75%
materials PRICES WITH IGV PRICES WITHOUT IGV Prices put in work
CAMERA 300.00 254.24 292.37
PRINTER 600.00 508.47 584.75
NOTEBOOKS 75.00 63.56 73.09
Prices put in work PERCENTAGE put in work
292.37 15%
584.75 15%
73.09 15%
RESUMEN CODE (CODE)
ATRAZ
8/15/2018
#𝐸𝑃𝑃=((𝐷𝑈𝑅
date budget
𝐷𝐸 𝑃𝐸𝑅𝑆𝑂𝑁𝐴
INDIVIDUAL PROTECTION EQUIPMENT (EQUIPOS DE PROTECCIÓN INDIVIDUAL)
DURATION OF
description Resource Unity Quantity Prices/. Partial S /.
ACTIVITY
Material
RELLAS UND 76 77.87 5,918.02 14.00
UND 191 50.61 9,666.46 14.00
UND 888 35.96 31,934.14 14.00
UND 119 48.63 5,787.13 14.00
UND 376 59.27 22,286.92 14.00
D POLES UND 236 71.05 16,767.00 14.00
UND 888 58.38 51,838.88 14.00
UND 820 56.43 46,270.93 14.00
TOR UND 785 30.70 24,098.83 14.00
214,568.32
USEFUL LIFE AMOUNT OF PEOPLE EFFECT IN CASE EFFECT OF "DISCOUNT 2/3" QUANTITY 1 QUANTITY 2
erial
13.00 10% 1.50 65.00 86.00
13.00 15% 1.50 157.00 225.00
13.00 30% 1.50 355.00 1420.00
13.00 10% 1.50 86.00 151.00
13.00 10% 1.50 151.00 601.00
13.00 15% 1.50 157.00 314.00
13.00 30% 1.50 355.00 1420.00
13.00 20% 1.50 328.00 1311.00
13.00 15% 1.50 314.00 1256.00
Lifespan AVERAGE
HELMETS WITH VEST GLASSES
UMBRELLAS
MATERIALS
SHELF LIFE OPTIMISTIC 6 2 1
AVERAGE
AMOUNT
76.00
191.00
888.00
119.00
376.00
236.00
888.00
820.00
785.00
4 2 2 1
2 0.5 1 0.25
SHELF LIFE SHELF LIFE
OPTIMISTIC PESSIMIST
6 4
2 1.5
1 0.25
4 2
2 0.5
2 1
1 0.25
1 0.25
1 0.25
EARMUFFS
SUNSCREEN O
PROTETOR
1 1
0.25 0.25
RESUMEN
CODE (CODE) DESCRIP
ATRAZ
Materi
0002 BARRIERS
0003 HOUSEKEEPING
0005 STRIPS
82.50 69.92
HOUSEKEEPING
95.60 81.02
WOODEN BOARDS FOR PROTECTION junction box
Material
UND 4 12,041.45 48,165.79
351,862.33
15% 41.45 20
15% 80.40 25
15% 53.60 20
15% 27.78 20
15% 24.85 10
15% 93.17 20
15% 98.07 20
15% 122.31 15
I metrado Unit price Total price
UNINSTALLATION (LABOR
# TIMES TOTAL PRICE
+ TOOL)
20 300 12041.45
0 300 7580.40
20 300 12053.60
20 300 12027.78
10 300 6024.85
20 300 12093.17
20 300 12098.07
15 300 9122.31
RESUMEN
CODE (CODE) DESCRIPTION (DESCRIPTION)
Material
0001 SIGNALING UND
PERCENTAGE put
materials PRICES WITH IGV PRICES WITHOUT IGV in work
rial
6 89.87 539.21
20 6,019.49 120,389.83
5 6,044.34 30,221.72
151,150.76
77.87 20 20 0.3
19.49 10 10 300
44.34 10 10 300
Total price
151,150.76
TOTAL PRICE
89.87
6019.49
6044.34
RESUMEN
CODE (CODE) DESCRIPTION (DESCRIPTION)
OE. 1.2.1.4. TRAINING IN SECURITY AND HEALTH (HEALTH AND SAFETY TRAINING)
SIGUIENTE
I subpresupuesto 1.2.1.
Departure OE. 1.2.1.4. TRAINING IN SECURITY AND HEALTH (HEALTH AND SAFETY TRAINING)
PERSONAL
0001 PROFESSIONAL INDUCTION FOR TALKS TIMES
0006 UND
maintenance of used materials
PTION (DESCRIPTION) UNIT (UNIT) I metrado Unit price
ONAL
2 1,500.00 3,000.00
4 1,500.00 6,000.00
2 2,500.00 5,000.00
2 1,500.00 3,000.00
6 1,000.00 6,000.00
2 2,000.00 4,000.00
27,000.00
Total price
27,000.00
RESUME
N CODE (CODE) DESCRIPTION (DESCRIPTION)
RESOURCES FOR EMERGENCY RESPONSES IN SAFETY AND HEALTH DURING WORK (REC
OE. 1.2.2.
RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO)
I subpresupuesto 1.2.1.
ATRAZ Departure OE. 1.2.2. RESOURCES FOR EMERGENCY RESPONSES IN SAFETY AND HEALTH DURING WORK (RECUR
Material
0001 0 UND 100
0002 0 UND
0003 0 UND
0004 0 UND
ND HEALTH DURING WORK (RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO)
0.00
Prices/. Partial S /.
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
0.00
Total price
0.00