Under Ground Solid Block works

Prior to Block works:

1. Excavation & Backfill of soil where ever required, up to the required level as per the drawings.
2. Compaction and field density test.
3. 100mm thick Blinding as per the drawing

Block works:

1. Standard method for Solid block works as per the drawing.


2. Block work Mortar shall be grade of M12 as per QCS
3. Accessories as per the drawings.

After Block works:

1. Bituminous water proofing on both sides of the block work as per the drawing.