Professional Documents
Culture Documents
MOHAMAD
RAMADAN
ZONE -4B MANAGER
ABDEL MOHSEN
DEPUTY ZONE -4B
MANAGER
TECHNICAL TEAM
TECHNICAL MANAGER
TBA
DAY NIGHT
PROJECT ENGINEER
AHMAD MONER KAMEL PROJECT ENGINEER
MOHAMAD ELSADATY
GENERAL FOREMAN GENERAL FOREMAN GENERAL FOREMAN GENERAL FOREMAN GENERAL FOREMAN GENERAL FOREMAN
TBA TBA ALI ABDUL KAREEM TBA TBA KHALID ISMAIL
CARPENTER STEEL CARPENTER STEEL LOGISTICS CARPENTER STEEL CARPENTER STEEL LOGISTICS
FOREMAN FOREMAN FOREMAN FOREMAN 1. MOHD ABDUL KAREEM FOREMAN FOREMAN FOREMAN FOREMAN 1. MAJDY NAJIB
1. JUMAH ABDULKAREM 1. ABDULLAH AHMAD 1. MAEN AL SAMMAN 1. THANASEKARAN 1. MOHAMED GUFRAN 1. ZAID KHALEF AL-ALASY 1. AHMADFARHAN 1. MUBARAK MOHAMAD
2. TBA 2. TBA 2. TBA VALLAINKANNU 2. ARSALAN AHMAD 2.VENGATESH RANGASAMY CASIM 2. MUSTAFA ABDULLAH
3. TBA 3. TBA 3. TBA 2. TBA 3. TBA 3. TBA 2. TBA 3. TBA
4. TBA 4. TBA 4. TBA 3. TBA 4. TBA 4. TBA 3. TBA 4. TBA SHOTCRETE
4. TBA CHAIN LINK 4. TBA 1. ALAA HASSAN
1. ALLA HAMIEH
HOUSEKEEPING/HSE
SHOTCRETE 1. PONKOJ CHONDRO DAS
1. MOHD NASIR ALSIBEH 2. RASHEL AHAMAD
CONCRETE
HOUSEKEEPING/HSE 1. RAFIQ KHAN
1. ANWAR HUSEEIN
WATER SUPPLY
1. SALEEM MOHAMMED
PLUMBING FOREMAN
Required Manpower to End Date of Zone (1)
Job Planned Actual Required Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Peak
Site Technical Support 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Site Manager 2 0 2 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Project Engineer 2 0 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Site Engineer 7 6 1 1 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Coordinator Engineer 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Document Control 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Draft Man 1 0 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
General Foreman 6 5 1 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Carpenter Foreman 16 5 11 5 6 1 1 1 2 2 1 16
Steel Fixer Foreman 16 6 10 5 5 1 1 1 2 3 2 3 16
Mason Foreman 6 1 5 2 3 2 2 6
Labor Foreman 0 0 0
Carpenter Charge Hand 30 7 23 7 8 8 2 2 2 4 5 2 30
Steel Fixer Charge Hand 48 6 42 12 15 15 3 3 6 6 6 12 48
Mason Charge Hand 14 4 10 2 4 4 14
Labor Charge Hand 10 0 10 4 4 2 2 3 10
Carpenter 440 416 24 24 40 40 40 80 100 40 440
Steel Fixer 720 359 361 61 100 100 100 50 50 100 100 100 200 720
Mason 140 79 61 6 12 12 20 40 140
Labour 140 110 30 6 12 12 30 40 30 140