You are on page 1of 1

RL1.

1 - Standart Railing Fixed to floor


RL 1.2 - Standart Railing Fixed to floor and walls

RL1.1 - Standart Railing Fixed to floor


RL 1.2 - Standart Railing Fixed to floor and walls
RL 2.1 - Standart Railing Fixed to concrete block

NOTES site revisions client project


EMERGENCY TREATMENT CENTER
MoH - FARATO - THE GAMBIA
number of plan sheet project phase

Ministry of Health
Republic of The Gambia
International Development Association
WORLD BANK
NETC-DD-ARC-1-0621 01 DETAILED DESIGN
authorized architect (IDOM) project team revision date plan title
project director
BASSAM NORY ALHASSANI
1 MARCH 2021 ARCHITECTURE
PABLO ELORZ GAZTELU ANDRÉIA FALEY FESCH
BEATRIZ SAN SALVADOR PICÓ
METAL WORKS AND RAILING
CARMEN PRADA ALFARO scale Railing Detail
MANUEL CARRASCO SZULC A3: 1/1000 Fixed to floor
ALEJANDRO CAMPUZANO DÍAZ
0 (m) 5 12.5 25
North

You might also like