Introduction A CVT system can be represented


by its Thevenin equivalent circuit.
In steady state, the secondary volt- The analysis of a simplified L-C-R
age of a capacitor voltage trans- circuit for the case of a sudden
former mirrors the primary voltage. collapse of the primary voltage
Because of the energy-storage (assuming a given set of initial
elements used, the transient out- conditions) produced the following
put, caused by sudden change in conclusions:
primary voltage, is no longer a rep-
lica of the primary. This distorted 1 If the equivalent capacitance Ce
output may last for a few cycles of is larger and assuming a fixed
the supply frequency. These errors value of the burden, the magni-
may be termed as the CVT linear tude of the residual transient
transient since they would still voltage becomes smaller. The
occur in the event that all of the intermediate voltage should also
components of the CVT were line- be maximized in order to achieve
ar. In addition to this, ferroreson- a high value of the equivalent
ance may occur resulting in volt- capacitance.
age measurement error. Ferroreson-
ance is caused by the saturation 2 The effect of the burden is so
of the electromagnetic unit or profound that it can dominate
inductive burden. Unlike the linear the CVT behavior. The burden
transient it does not occur with configuration is insignificant
every change in primary voltage. since it determines the way in
which energy can be stored and
the path through which it can
Linear Transient Error discharge. Pure resistive burden
(Transient Response) dissipates and does not store
energy. Stored energy burdens
The linear transient error is mainly (lagging or leading) create harm-
influenced by the following factors: ful effect on the transient
response producing oscillations
1 The Thevenin equivalent capaci- of low frequency nature.
tance referred to the secondary
voltage level, Ce. The oscillograms shown below
2 The burden value and configura- illustrate the variation in the
tion. residual voltages as a function of
burden at crest fault initiation. At
3 The point of wave voltage inter- zero fault initiation, the transient
ruption. response worsens.
3 During the sudden application
or sudden disappearance of
primary voltage, the distribution
of energy stored in the CVT is
a major factor in understanding
the effect of the point of wave
voltage interruption. The tran-
sient performance in those
cases is similar with the transi-
ents in the case of the primary
short circuit.

The amount of energy accumula-


ted by the capacitor at zero in-
itiation is equivalent to the energy
stored by the series reactor at
crest voltage initiation.

The discharge time constant will


vary depending upon where the
maximum energy is stored. A
typical example of transient res-
ponse ( see below) indicates the
worse case with the maximum
energy on the capacitor at the
time the primary voltage wave is
going through the zero voltage
interruption.
Trench Facilities

Trench® Austria GmbH Trench® Limited


Paschinger Strasse 49 Instrument Transformer Division
Postfach 13 390 Midwest Road
A-4060 Linz-Leonding Scarborough, Ontario
Austria Canada M1P 3B5
Phone: 43-732-6793-0 Phone: 416-751-8570
Fax: 43-732-671341 Fax: 416-751-6952

Trench® Brasil Ltda Trench® Limited


Via Expressa de Contagem, 2685 Power Line Carrier Division
Contagem, Minas Gerais 815 Middlefield Road, Unit 6A
CEP 32370-485 Scarborough, Ontario
Brazil Canada M1V 2P9
Phone: 55-31-3391-5959 Phone: 416-291-8544
Fax: 55-31-3391-1828 Fax: 416-291-5581

Trench® China Trench® France S.A.


MWB (Shanghai) Co., Ltd. 16, Rue du Général Cassagnou
No. 3658, Jiancheng Road B.P. 70 F-68 302
Minhang, Shanghai St. Louis, Cedex
Peoples Republic of China France
200245 Phone: 33-3 89-70-2323
The Trench Group is your Phone: 86-21-54720088 Fax: 33-3 89-67-2663
Fax: 86-21-54723118
Trench® Germany GmbH
partner of choice for electrical Trench® High Voltage Nürnberger Strasse 199
Products Ltd., Shenyang D-96050 Bamberg
No. 2 Zhengliang Er. Road Germany
power transmission and Jing Shen Xi San Street Phone: 49-951-1803-0
Dao Yi Economic Development Zone Fax: 49-951-1803-224
Shenyang 110136 P.R. China
distribution solutions today; Phone: 86-24-89722688 Trench® Switzerland AG
Fax: 86-24-89737200 Lehenmattstrasse 353
and for the development of CH-4028
Trench® Limited Basel
Bushing Division Switzerland
your new technology solutions 432 Monarch Avenue Phone: 41-61-315-51-11
Ajax, Ontario Fax: 41-61-315-59-00
Canada L1S 2G7
of tomorrow. Phone: 905-426-2665 Trench® (UK) Limited
Fax: 905-426-2671 South Drive
Hebburn
Trench® Limited Tyne & Wear
Coil Product Division NE 31 1 UW
71 Maybrook Drive Phone: 44-191-483-4711
Scarborough, Ontario Fax: 44-191-430-0633
Canada M1V 4B6
Phone: 416-298-8108
Fax: 416-298-2209

www.trenchgroup.com
E 214.60
Subject to change without notice (05.2006)
Printed in Canada.

You might also like