DOCUMENTATION REPORT OF TESTING 6.

6 KV SWITCHGEAR (4001MVP11)

No. Item Inspection Documentation

1 Installation Check

2 Mechanical Operation Check

3 Operation Check

4 Protection Trip Check


5 Interlock Check

6 Insulation Resistance Measurement

7 Phase Check

8 Phase Check (By Ratio)


9 CT Polarity Check