You are on page 1of 4

DEVELOPMENT CONS TRUCTIONS LTD 5/ 9/2018

New folde r
PIT-W 2009-2
40.00
m/s^2 Pile: 09.01 - 3: # 2
Pile
5/9/2018 1:24:49 PM
20.00

0.00

L/D=23 (D=120 cm)


-20.00 A 35.751 m/s^2 (35.751)
27.10 m (3950 m/s)
0 5 10 15 20 25 30 35 40 45 50 m

Page 1
DEVELOPMENT CONS TRUCTIONS LTD 5/ 9/2018
New folde r
PIT-W 2009-2
60.00
m/s^2 Pile: 09.02 - 3: # 3
Pile
5/9/2018 1:25:18 PM
30.00

0.00

L/D=23 (D=120 cm)


-30.00 A 52.149 m/s^2 (52.149)
27.10 m (3950 m/s)
0 5 10 15 20 25 30 35 40 45 50 m

Page 2
DEVELOPMENT CONS TRUCTIONS LTD 5/ 9/2018
New folde r
PIT-W 2009-2
16.00
m/s^2 Pile: 09.03 - 3: # 4
Pile
5/9/2018 1:25:58 PM
8.00

0.00

L/D=23 (D=120 cm)


-8.00 A 8.805 m/s^2 (8.805)
27.10 m (3950 m/s)
0 5 10 15 20 25 30 35 40 45 50 m

Page 3
DEVELOPMENT CONS TRUCTIONS LTD 5/ 9/2018
New folde r
PIT-W 2009-2
Summary of Re cords

Re cord Record P ile Date Pile Wave


No. ID Name Collected Length Speed Magn Co mments
m m/s

2 1 09.01 5/9/2018 27.10 3950.00 1.00


3 1 09.02 5/9/2018 27.10 3950.00 1.00
4 1 09.03 5/9/2018 27.10 3950.00 1.00

Page 4

You might also like