1. Draining facility to be provided in tank as indicated in drawing.
2. Instead of plunger pump, diaphragm pump is preferable (positive displacement type). 3. Two NRVs should be provided as indicated in drawing. 4. In MOC, specification of Pr. Gauges, level gauges have not been mentioned. 5. PRVs to be flanged ended with provision of valves for carrying out maintenance jobs. PRV outlet should also have flange. PRVs rating to be mentioned in MOC. 6. Positioning of pulsation dampener need to changed as indicated in the drawing. 7. Provision for Electrical cable requirement, LCS, ESD, Contactors and necessary electrical items have not been shown in BOM. 8. Provision for suitable coupling guard for motor and pump to be mentioned in MOC. 9. Provision for start up from PLC, LT for correct quantity should be there, if required in future.
Note :
In LPR line, it should be mentioned “ Fabrication, Supply, Installation and
RV Living Collection: RV living for beginners, RV travel for the whole family, RV repair and RV mobile solar power: Experience Freedom on the roads alone or with your family with this collection. Learn how to repair your motorhome while using renewable energy!
Power of Habit: The Ultimate Guide to Forming Positive Daily Habits, Learn How to Effectively Break Your Bad Habits For Good and Start Creating Good Ones