Battery Charger Design Comments Review

The document provides a resolution sheet for comments on the design basis memorandum for a battery charger replacement project at NGL plants. There were 8 comments provided on details needing correction or clarification in the design basis memorandum. For each comment, the contractor response indicates that the comment has been noted, the document has been revised with a triangle to indicate the changes, and the revised version has been resubmitted for approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views2 pages

Battery Charger Design Comments Review

The document provides a resolution sheet for comments on the design basis memorandum for a battery charger replacement project at NGL plants. There were 8 comments provided on details needing correction or clarification in the design basis memorandum. For each comment, the contractor response indicates that the comment has been noted, the document has been revised with a triangle to indicate the changes, and the revised version has been resubmitted for approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

COMMENTS

RESOLUTION SHEET
[ CRS ]
QP PROJECT
NUMBER

CONTRACT NUMBER

LC15106800

CONTRACT TITLE
QP EXTERNAL TRANSMITTAL
REFERENCE

EPIC FOR REPLACEMENT OF BATTERY CHARGER AT NGL PLANTS QP MESAIEED

DOCUMENT NUMBER

3916-MGEN-0-29-0002

DOCUMENT TITLE

DESIGN BASIS MEMORANDUM

No.
1

QP COMMENTS
Clause 4.2 Background, page 8 of 23, paragraph-6:
Note that 415 volt switchyard 6730-MC-01 is not in
LER-1, it is located in substation No.1; to be corrected
accordingly.
Clause 6.3, Design life:
The document states about QP Refinery to be
corrected for the subject project in NGL.
Clause 7.2, Basis of design, 1st paragraph:
After subsequent site visit, the following to be added
to verify the as-built status of all equipment, system
and control included in this project and
In is used at different places in this document
instead of and to be corrected accordingly.
Drg. No. MIME-2-50-0001, sht. 001 SS-1660
equipment layout:
It is written in the comment box that single source
loads to be transferred to temporary charger. What
about dual fed loads, these also to be fed by
temporary charger during demolition/construction.
Drg. No. M3UT-2-50-0001-001, SS-1 Equipment Lay
out at NGL-3:
Write battery charger tag number

3916

DATE

23.10.2016

DOCUMENT
REVISION

CONTRACTOR RESPONSE
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.

Drg. No. M3GE-2-50-0001-001, SS-2 Equipment Lay


out at NGL-3:
Write battery charger tag number
Drg. No. 65-16-3112-Rev.8-SS-1 & LER-1 Equipment
Layout-NGL-3:
Demolition of Battery for instrument is not in this
project scope. Moreover, these batteries do not exist
at site now. The DBM drawing to be corrected
accordingly.

Comments noted and complied. Changes has been provided


with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.