COMMENTS
RESOLUTION SHEET
[ CRS ]
QP PROJECT
NUMBER
CONTRACT NUMBER
LC15106800
CONTRACT TITLE
QP EXTERNAL TRANSMITTAL
REFERENCE
EPIC FOR REPLACEMENT OF BATTERY CHARGER AT NGL PLANTS QP MESAIEED
DOCUMENT NUMBER
3916-MGEN-0-29-0002
DOCUMENT TITLE
DESIGN BASIS MEMORANDUM
No.
1
QP COMMENTS
Clause 4.2 Background, page 8 of 23, paragraph-6:
Note that 415 volt switchyard 6730-MC-01 is not in
LER-1, it is located in substation No.1; to be corrected
accordingly.
Clause 6.3, Design life:
The document states about QP Refinery to be
corrected for the subject project in NGL.
Clause 7.2, Basis of design, 1st paragraph:
After subsequent site visit, the following to be added
to verify the as-built status of all equipment, system
and control included in this project and
In is used at different places in this document
instead of and to be corrected accordingly.
Drg. No. MIME-2-50-0001, sht. 001 SS-1660
equipment layout:
It is written in the comment box that single source
loads to be transferred to temporary charger. What
about dual fed loads, these also to be fed by
temporary charger during demolition/construction.
Drg. No. M3UT-2-50-0001-001, SS-1 Equipment Lay
out at NGL-3:
Write battery charger tag number
3916
DATE
23.10.2016
DOCUMENT
REVISION
CONTRACTOR RESPONSE
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Drg. No. M3GE-2-50-0001-001, SS-2 Equipment Lay
out at NGL-3:
Write battery charger tag number
Drg. No. 65-16-3112-Rev.8-SS-1 & LER-1 Equipment
Layout-NGL-3:
Demolition of Battery for instrument is not in this
project scope. Moreover, these batteries do not exist
at site now. The DBM drawing to be corrected
accordingly.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.
Comments noted and complied. Changes has been provided
with rev. triangle and document submitted as REV. 1, Issued
for Approval.