You are on page 1of 1

FOONG SUN SHIPPING (PTE) LTD.

FS 1215 - SUMMARY OF ISM DRILL RECORD IN MONTH _________________ YEAR ________


Issue date Issue Status Prepared by Authorized by CPM Section No. 17
CPM Section No..8
07-10-2009 2 DPA Managing Director Page 1 of 1
To : Designated Person Ashore Ship Name :
TYPE OF EMERGENCY Year ________ Remarks
No. Interval
( ISM ) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Main Engine (or) Electrical (or)
1 Yearly
Critical Equipment Failure

2 Collision Yearly

Grounding / Stranding /
3 Yearly
Touching Bottom

4 Man Overboard and Missing Yearly

5 Personal Injury / Illness / Death Yearly

6 Cargo Shifting Yearly

7 Anti - Piracy 3 Monthly

8 Salvage / Towage of own ship Yearly

9 Oil Spillage / Pollution 3 Monthly

Flooding / Hull Failure / Heavy


10 Yearly
Weather Damage

11 Rescue from Enclosed Space Yearly


= Drill Schedule , Date = Actual Done Note : a) Upper Row = Target Drills, Lower Row = Actual Done.
b) As CPM Section 8, Ensure Shipboard Drills are conducted regularly (as per Drill Schedule, FS-13) and the Shipboard Safety Committee shall review the effectiveness of these drills.
c) The schedules shall be minimum requirement and master may conduct additional drill / exercise / training in frequent interval as and when necessary.
d) The requirement for additional training shall depend on the skill of the crew and possibility of high occurrences of emergency in the trading area of the vessel.
e) After exercised have been carried out, the master should evaluate the success and record in the drill report and entries in deck and engine room log books.

Signed by: _____________________ Date: _____________________


Master

You might also like