Doc. No.

FABRICATION DRAWING 7T04-MP-51-FAB-001


Egyptian Refining Company (TAKRIR) S.A.E. Rev. No. : C16 TO DCC
Date : 21 Jan. 2017
FABRICATION DRAWING (A/G) FOR TANKAGE (UNIT 51)

FOR CONSTRUCTION

PROJECT NO. : 7T04

PROJECT NAME : ERC Refinery Project

COMPANY : Egyptian Refining Company (TAKRIR) S.A.E.

LOCATION : Mostorod, Arab Republic of Egypt

C16 21 Jan. 2017 52 Issued For Construction


C15 16 Nov. 2016 16 Issued For Construction
C14 07 oct. 2016 57 Issued For Construction
C13 17 SEP 2016 25 Issued For Construction
C12 03 SEP 2016 40 Issued For Construction
C11 24 July 2016 164 Issued For Construction G.I.S T.G.Kim M.H.Park H.Y.Jang
C10 17 Jun 2016 103 Issued For Construction G.I.S T.G.Kim M.H.Park H.Y.Jang
C9 26 Apr 2016 55 Issued For Construction G.I.S T.G.Kim M.H.Park H.Y.Jang
ISO PREPD CHKD CHKD APPR
REV DATE DESCRIPTION
SHEET CONTRACTOR

SEOUL, KOREA
SEOUL, KOREA
FAB DRAWING

TO site FAB Rev. Status


No. Unit C16 Rev. No DATE Drawing No. Sheet No.
0
67 51 C16 0-1 5-Jan-17 CD-510102-03 1 of 1 25-Sep-14
122 51 C16 1-0 15-Jan-17 CD-511501-01 1 of 1 14-Nov-14
130 51 C16 1-0 15-Jan-17 CD-511504-01 1 of 1 25-Nov-14
131 51 C16 1-0 15-Jan-17 CD-511504-02 1 of 1 25-Nov-14
132 51 C16 1-0 15-Jan-17 CD-511504-03 1 of 1 25-Nov-14
133 51 C16 1-0 15-Jan-17 CD-511505-01 1 of 1 25-Nov-14
134 51 C16 1-0 15-Jan-17 CD-511505-02 1 of 1 25-Nov-14
244 51 C16 1-0 15-Jan-17 FL-511502-11 1 of 1 25-Nov-14
248 51 C16 1-0 15-Jan-17 FL-511504-11 1 of 1 25-Nov-14
249 51 C16 1-0 16-Jan-17 FL-511505-11 1 of 1 25-Nov-14
250 51 C16 0-2 5-Jan-17 FL-511601-11 1 of 1 19-Dec-14
255 51 C16 1-0 16-Jan-17 FL-51B101-12 1 of 1 19-Dec-14
297 51 C16 1-2 28-Dec-16 FS-516001-03 1 of 1 14-Nov-14
340 51 C16 3-2 17-Nov-16 FS-516010-63 1 of 1 14-Nov-14
388 51 C16 3-0 15-Jan-17 FW-514216-61 1 of 1 14-Nov-14
409 51 C16 4-1 4-Jan-17 FW-514227-61 1 of 1 14-Nov-14
461 51 C16 4-1 22-Dec-16 FW-514510-21 1 of 1 14-Nov-14
472 51 C16 3-1 20-Dec-16 FW-514512-61 1 of 1 14-Nov-14
482 51 C16 4-1 1-Dec-16 FW-514516-22 1 of 1 14-Nov-14
519 51 C16 4-1 20-Dec-16 FW-514706-02 1 of 1 25-Nov-14
586 51 C16 0-1 22-Dec-16 FW-522740-01 1 of 1 25-Nov-14
677 51 C16 1-0 16-Jan-17 LC-51A312-11 1 of 1 19-Dec-14
708 51 C16 2-1 13-Dec-16 LSS-510601-01 1 of 1 14-Nov-14
719 51 C16 1-0 16-Jan-17 LSS-511501-01 1 of 1 19-Dec-14
799 51 C16 1-2 13-Dec-16 MC-511701-01 1 of 1 14-Nov-14
900 51 C16 2-0 21-Nov-16 N-511001-02 1 of 1 14-Nov-14
901 51 C16 2-0 21-Nov-16 N-511001-03 1 of 1 14-Nov-14
902 51 C16 2-0 21-Nov-16 N-511002-01 1 of 1 14-Nov-14
904 51 C16 1-0 16-Jan-17 N-511501-01 1 of 1 14-Nov-14
905 51 C16 1-0 16-Jan-17 N-511502-01 1 of 1 14-Nov-14
959 51 C16 2-2 5-Jan-17 OS-392201-01 1 of 1 31-May-16
1029 51 C16 0-3 13-Dec-16 P-510102-11 1 of 1 19-Dec-14
1040 51 C16 1-0 2-Jan-17 P-510104-63 1 of 1 14-Nov-14
1073 51 C16 0-0 2-Jan-17 P-510137-01 1 of 1 24-Nov-16
1074 51 C16 0-0 2-Jan-17 P-510138-01 1 of 1 24-Nov-16
1075 51 C16 0-0 2-Jan-17 P-510139-01 1 of 1 24-Nov-16
1076 51 C16 0-0 2-Jan-17 P-510140-01 1 of 1 24-Nov-16
1107 51 C16 0-1 21-Nov-16 P-510217-21 1 of 1 30-May-14
1200 51 C16 2-0 2-Jan-17 P-510412-01 1 of 1 25-Nov-14
1298 51 C16 1-0 7-Nov-16 P-510704-13 1 of 1 14-Nov-14
1327 51 C16 1-0 7-Nov-16 P-510712-01 1 of 1 24-Oct-14
1338 51 C16 1-0 7-Nov-16 P-510720-01 1 of 1 24-Oct-14
1366 51 C16 1-0 7-Nov-16 P-510806-01 1 of 1 24-Oct-14
1403 51 C16 1-2 13-Dec-16 P-511108-01 1 of 1 19-Dec-14
1453 51 C16 1-2 13-Dec-16 P-511401-02 1 of 1 25-Nov-14
1502 51 C16 0-2 13-Dec-16 P-511432-01 1 of 1 30-Jun-16
1616 51 C16 1-0 2-Jan-17 SLL-510916-62 1 of 1 19-Dec-14
1629 51 C16 1-0 16-Jan-17 SLL-511501-01 1 of 1 30-May-14
1630 51 C16 1-0 16-Jan-17 SLL-511502-01 1 of 1 30-May-14
1631 51 C16 1-0 16-Jan-17 SLL-511503-01 1 of 1 14-Nov-14
1640 51 C16 1-0 16-Jan-17 SLL-511508-01 1 of 1 25-Nov-14
1641 51 C16 1-0 16-Jan-17 SLL-511509-01 1 of 1 25-Nov-14
Doc. No. :
Rev No. :
FAB DRAWING LIST
Date :
Issue :
Revision Status (dd-mmm-yy)
Remarks
1 2 3 4 5 6 7

5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17

5-Jan-17
23-Mar-15
23-Mar-15 26-Mar-16 26-May-16
23-Mar-15 12-Dec-16 14-Jan-17
23-Mar-15 21-Apr-16 20-Aug-16 27-Aug-16
23-Mar-15 21-Apr-16 25-Jul-16 15-Sep-16
23-Mar-15 19-Mar-16 21-Apr-16
23-Mar-15 19-Mar-16 21-Apr-16 25-Jul-16
23-Mar-15 19-Mar-16 21-Apr-16 15-Sep-16

5-Jan-17
19-Dec-14 10-Dec-15
5-Jan-17
19-Dec-14
20-Apr-15 17-Nov-16
20-Apr-15 17-Nov-16
20-Apr-15 17-Nov-16
5-Jan-17
5-Jan-17
30-Jun-16 3-Sep-16

24-Nov-16

15-Apr-15 26-Nov-16
3-Nov-16
3-Nov-16
3-Nov-16
3-Nov-16
26-Mar-16
23-Jul-16

24-Nov-16
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
5-Jan-17
7T04-MP-51-FAB-001
C16
21-Jan-17
Total index by email

Remarks
AS BUILT 1

AS BUILT 2

AS BUILT 2
AS BUILT 2

AS BUILT 1
AS BUILT 1
AS BUILT 1
AS BUILT 1
AS BUILT 1
AS BUILT 1

AS BUILT 1
AS BUILT 2

AS BUILT 2
AS BUILT 3

AS BUILT 1

AS BUILT 2
AS BUILT 2
AS BUILT 2