HEAT LOAD CALC
SPACE SHEET
# SPACE EXPOSED GROSS WALL (FT)2 EXPOSED WINDOW(F
AREA AREA
(M)2 (FT)2
N E S W NE SE SW NW N E S
GROUND FLOOR
ENTRANCE -002
1 73 785
RECEPTION -003
2 10 108
SECRETARY-004
3 20 215 163
GROUP MANGER-005
4 43 462 344 77.4
CORRIDOR-006
5 23 247
RC OFFICE OO7
6 17 183
LOBBY-011
7 16 172 57
SECRETARY-012
8 21 226 249 191 51.6
DIRECTOR-013
9 47 505 426
RC OFFICE -014
10 26 280
CORRIDOR-017
11 30 323
RC OFFICE-018
12 24 258
RC OFFICE-019
13 26 280 234
C0RRIDOR-020
14 6.3 68 86.1 26
LOBBY-022
15 10 108
ENTRANCE -023
16 16 172
TRAFIC
MANGEMENT
17 SYSTEM -025 27 290 230 52
LOBBY-027
18 23 247
PRAYER ROOM-028
19 129 1387 596 596 596
RC ENGINEER-029
20 27 290 230 52
ENTARNCE 031
36 22.4 241 86 26
,C0RRIDOR-,040
21 36.2 389
LOBBY-032
22 10 108
CONTRACTOR
23 OFFICE-035 28 301 249 51.6
CONTRACTOR
24 OFFICE-036 25 269 230 51.6
RC ENGINEER-037
25 21 226
TELE-038
26 20 215 181
LIBRARY &
27 ARCHIVING-041 31 333 249 287 51.6 25.8
LOBBY(SKY LIGHT)-
28 042 16 172 57
ENCROCHMENT
29 PERMITS-044 25 269 201 268 51.6
ENCROCHMENT
30 PERMITS-045 25 269 201 51.6
WATING-046
31 25 269 201
CORRIDOR-047
32 20 215
MEETING ROOM-048
33 36 387
WORKSTA
34 CORRIDOR 49 126 1355 230 52
WORKSTATIONS-049
35 208 2236 415 256 367 256
CORRIDOR-050
36 65 699 498 192 498 103
CORRIDOR-051
37 65 699 498 498 192 103
OAD CALCULATION
SPACE SHEET
EXPOSED WINDOW(FT)2 CEILING INTERNAL LOADS
WALL
SKY ROOF FLOOR PARTITIT PARTITION
LIGHT (FT)2 (FT)2 ON LIGHTNI
(FT)2
NG ELECTRICA
W NE SE SW NW (FT)2
PEOPLES WATT/FT L WATTS
2
GROUND FLOOR
785 785 0 455.41 5 1.2 600
108 108 0 0 3 1 400
215 215 0 200.9 2 1.1 500
462 462 0 282.240 3 1.3 500
247 247 0 143.51 5 0.9 800
183 183 0 215.26 2 1.3 400
25 63 172 172 0 401.83 8 1.3 800
226 226 0 0 2 1.1 600
77.4 505 505 0 248.75 3 1.3 800
280 280 0 239.18 2 1.3 800
323 323 0 382.22 10 0.9 1000
258 258 0 239.18 2 1.3 800
25.8 280 280 0 248.75 2 1.3 800
68 68 167.43 2 0.9 400
108 108 0 239.18 3 1.3 500
172 172 0 90.89 5 1 500
290 290 0 263.1 2 1.4 900
247 247 0 287 8 1.3 800
103.2 180.6 1387 1387 0 137.28 85 2.2 2000
290 290 0 272.67 2 1.2 800
241 241 0 277.45 4 0.9 500
389 389 0 382.7 6 1 800
108 108 0 239.18 3 1.3 500
301 301 0 0 2 1.3 800
269 269 0 0 2 1.3 800
226 226 0 239.18 2 1.3 800
215 215 0 0 3 1 800
333 333 0 0 4 1.4 1200
24.72 63 172 172 0 105.24 8 1.3 600
269 269 0 0 5 1 800
269 269 0 0 5 1 800
269 269 0 0 8 0.9 800
215 215 0 220.05 6 0.9 800
387 387 0 215.26 10 1.4 1200
1355 1355 0 1272 20 0.9 1200
811.4 2236 2236 0 0 16 1.3 1400
699 699 0 145.9 10 0.9 800
699 699 0 146.38 10 0.9 800
total
TR
5.11
0.7
1.4
3.01
1.61
1.19
1.12
1.47
3.29
1.82
2.1
1.68
1.82
0.441
0.7
1.12
1.89
1.61
9.03
1.89
1.568
2.534
0.7
1.96
1.75
1.47
1.4
2.17
1.12
1.75
1.75
1.75
1.4
2.52
8.82
14.56
4.55
4.55
99.323
COOLING LOAD CALCULATION BY RULE OF THUMB
GROUND FLOOR
# FLOOR SPACE NAME AREA M2 FACTOR
1 GF ENTRANCE -002 73 0.07
2 GF RECEPTION -003 10 0.07
3 GF SECRETARY-004 20 0.07
4 GF GROUP MANGER-005 43 0.07
5 GF CORRIDOR-006 23 0.07
6 GF RC OFFICE OO7 17 0.07
7 GF LOBBY-011 16 0.07
8 GF SECRETARY-012 21 0.07
9 GF DIRECTOR-013 47 0.07
10 GF RC OFFICE -014 26 0.07
11 GF CORRIDOR-017 30 0.07
12 GF RC OFFICE-018 24 0.07
13 GF RC OFFICE-019 26 0.07
14 GF C0RRIDOR-020 6.3 0.07
15 GF LOBBY-022 10 0.07
16 GF ENTRANCE -023 16 0.07
TRAFIC MANGEMENT
17 GF SYSTEM -025 27 0.07
18 GF LOBBY-027 23 0.07
19 GF PRAYER ROOM-028 129 0.07
20 GF RC ENGINEER-029 27 0.07
21 GF ENTARNCE 031 22.4 0.07
22 GF ,C0RRIDOR-,040 36.2 0.07
23 GF LOBBY-032 10 0.07
CONTRACTOR
24 GF OFFICE-035 28 0.07
CONTRACTOR
25 GF OFFICE-036 25 0.07
26 GF RC ENGINEER-037 21 0.07
27 GF TELE-038 20 0.07
LIBRARY &
28 GF ARCHIVING-041 31 0.07
LOBBY(SKY LIGHT)-
29 GF 042
16 0.07
ENCROCHMENT
30 GF PERMITS-044 25 0.07
ENCROCHMENT
31 GF PERMITS-045 25 0.07
32 GF WATING-046 25 0.07
33 GF CORRIDOR-047 20 0.07
34 GF MEETING ROOM-048 36 0.07
WORKSTA CORRIDOR
35 GF 49 126 0.07
36 GF WORKSTATIONS-049 208 0.07
37 GF CORRIDOR-050 65 0.07
38 GF CORRIDOR-051 65 0.07
TOTAL
TR
5.11
0.7
1.4
3.01
1.61
1.19
1.12
1.47
3.29
1.82
2.1
1.68
1.82
0.441
0.7
1.12
1.89
1.61
9.03
1.89
1.568
2.534
0.7
1.96
1.75
1.47
1.4
2.17
1.12
1.75
1.75
1.75
1.4
2.52
8.82
14.56
4.55
4.55
99.323
FCU SCHEDU
COOLING CIRCULATE
# REF LOCATION AREA SERVED QTY NOS D AIR
FLOW
TOTAL SENSIBLE
1 GF FCU 1 1600
GF 002,48
01 4
2 GF FCU 005,4,6,7,3 1 1840
GF
02 4.6
3 GF FCU 12,11,13 1 2400
GF
03 6
4 GF FCU 14,18,19,17 1 2000
GF
04 5
5 GF FCU 51 1 1440
GF
05 3.6
6 GF FCU 20,25,23,22 1 1400
GF
06 3.5
7 GF FCU 1
GF
07 32,29,31 3.3 1320
8 GF FCU 1 1480
GF
08 50 3.7
9 GF FCU 1 2560
GF
09 40,35,36,38,37 6.4
10 GF FCU 1 1680
GF
10 41,42 4.2
11 GF FCU 1 1680
GF
11 46,45,44,47 4.2
U SCHEDULE
E.A.T- 0F L.A.T-0F HEAT CH.WT.0F
ESP (INCH CAPACITY
OF WG) (KW)
DBT WBT DBT WBT EWT LWT
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
0.2 2
76 63 55 54 45 55
TOTAL
WATER
FLOW
(GPM)
9.6
11.04
14.4
12
8.64
8.4
7.92
8.88
15.36
10.08
10.08
116.4
SUPPLY
AHU SCH
FRESH RETURN
COOLING AIR AIR AIR
# REF LOCATION AREA SERVED QTY NOS
TOTAL SENSIBLE FLOW FLOW FLOW
(CFM) (CFM) (CFM)
1 AHU 01 GF 49,28,27 1 36.8 37 18343 919 17424
AHU SCHEDULE
E.A.T 0F L.A.T 0F ESP(INC HEAT CH.WT.0F WATER FLOW
H OF CAPACIT
DBT WBT DBT WBT EWT LWT (GPM)
WG) Y (KW)
77 63 56.6 55.2 2 9 45 55 88.32
FRESH AIR CALCULATION
# FLOOR SPACE AREA Sqmt AREA SqfCFM/Sqf NO OF PEOPLE
1 GF ENTRANCE -002 73 785 0.06 5
2 GF RECEPTION -003 10 108 0.06 3
3 GF SECRETARY-004 20 215 0.06 2
4 GF GROUP MANGER-005 43 462 0.06 3
5 GF CORRIDOR-006 23 247 0.06 5
6 GF RC OFFICE OO7 17 183 0.06 2
7 GF LOBBY-011 16 172 0.06 8
8 GF SECRETARY-012 21 226 0.06 2
9 GF DIRECTOR-013 47 505 0.06 3
10 GF RC OFFICE -014 26 280 0.06 2
11 GF CORRIDOR-017 30 323 0.06 10
12 GF RC OFFICE-018 24 258 0.06 2
13 GF RC OFFICE-019 26 280 0.06 2
14 GF C0RRIDOR-020 6.3 68 0.06 2
15 GF LOBBY-022 10 108 0.06 3
16 GF ENTRANCE -023 16 172 0.06 5
TRAFIC MANGEMENT
17 290
GF SYSTEM -025 27 0.06 2
18 GF RC ENGINEER-029 27 290 0.06 2
19 GF ENTARNCE 031 22.4 241 0.06 4
20 GF ,C0RRIDOR-,040 36.2 389 0.06 6
21 GF LOBBY-032 10 108 0.06 3
22 GF CONTRACTOR OFFICE-035 28 301 0.06 2
23 GF CONTRACTOR OFFICE-036 25 269 0.06 2
24 GF RC ENGINEER-037 21 226 0.06 2
25 GF TELE-038 20 215 0.06 3
26 GF LIBRARY & ARCHIVING-041 31 333 0.06 4
27 GF LOBBY(SKY LIGHT)-042 16 172 0.06 8
ENCROCHMENT PERMITS-
28 269
GF 044 25 0.06 5
ENCROCHMENT PERMITS-
29 269
GF 045 25 0.06 5
30 GF WATING-046 25 269 0.06 8
31 GF CORRIDOR-047 20 215 0.06 6
32 GF MEETING ROOM-048 36 387 0.06 10
33 GF CORRIDOR-050 65 699 0.06 10
34 GF CORRIDOR-051 65 699 0.06 10
ON
CFM/PERSON FA C
5 72.085
5 21.45
5 22.9
5 42.735
5 39.835
5 20.965
5 50.32
5 23.545
5 45.315
5 26.77
5 69.35
5 25.48
5 26.77
5 14.0635
5 21.45
5 35.32
5 27.415
5 27.415
5 34.448
5 53.349
5 21.45
5 28.06
5 26.125
5 23.545
5 27.9
5 39.995
5 50.32
5 41.125
5 41.125
5 56.125
5 42.9
5 73.22
5 91.925
5 91.925
TOTAL 1356.7205
DESIGN OF FRESH AIR HAND
LOCATION hyderabad
OUT DB 106 0F
OUT WB 78 0F
SEASON SUMMER
# FLOW OF AIR ON COIL OFF COIL
CFM DBT DEG F WBT DEG F RH % W GR/LB DBT DEG F
FAHU1 1356.72 106 78 29 100 77
LOCATION hyderabad
OUT DB 55
SEASON WINTER
ON COIL OFF COIL SH SH
# CFM DBT DEG/F DBT DEG/F BTU/HR KW
FAHU1 1356.72 55 76 30770 9
IGN OF FRESH AIR HANDLING UNIT
OFF COIL SH LH TH
WBT DEG F RH% W GR/LB BTU/HR TONS BTU/HR TONS BTU/HR
64 50 68 41027 3.41 29522 2.46 70549.00
TH
TONS
5.87
FAHU SCHEDULE
QTY COOLING CAPACITY(TR) FRESH AIR FLOW E.A.T.(0F)
REF LOCATION
# NOS. TOTAL SENSIBLE CFM D.B. 0F
1 FAHU 01 GF 1 5.87 3.41 1356.72 106
AHU SCHEDULE
E.A.T.(0F) L.A.T.(0F) HEAT CH.W.T(C)
ESP(INCH OF WG) CAPACIT WATER FLOW(GPM)
W.B 0F D.B. 0F W.B 0F Y(KW) EWT LWT
78 76 63 2 9 45 55 14.088
CHILLER DESIGN
TOTAL BUILDING CAPACITY IN TONS 85.3
DIVERSITY FACTOR 85%
TOTAL BUILDING CAPACITY IN TONS WITH
72.505
DIVERSITY FACTOR
NO.OF CHILLER SELECTED 1+1
EACH CHILLER CAPACITY IN TONS 75
AIR COLED CHILLER
COLIN
G
# QTY NOS.
CAPACI
TY (TR)
CH-01,CH02 2 85.3
DESIGN
D CHILLER
AMBIE
WATER POWER
E.W.T L.W.T NT
FLOW SUPPLY REMARK
0
F 0
F TEMP.
USGPM V/P/Hz
0
F
1WORKING & 1 STAND
218.8 55 45 106
BY
SUMMARY OF CALCULATION
CAPACI TOTAL
# REF. TY IN QTY. CAPACITY
TONS (TONS)
1 GF FCU-01 4 1 4
2 GF FCU-02 4.6 1 4.6
3 GF FCU-03 6 1 6
4 GF FCU-04 5 1 5
5 GF FCU-05 3.6 1 3.6
6 GF FCU-06 3.5 1 3.5
7 GF FCU-07 3.3 1 3.3
8 GF FCU-08 3.7 1 3.7
9 GF FCU-09 6.4 1 6.4
10 GF FCU-10 4.2 1 4.2
11 GF FCU-11 4.2 1 4.2
12 GF AHU-01 36.8 1 36.8
TOTAL 85.3
PRIMARY PUMP HEAD CALCULATION
DESCRI STRAIGHT VALVES EQT.
PTION SIZE (Dia) FLOW
LENGTH & Length
SECTION OF THE QTY
FITTIN of Fitting
PIPE
INCH LPS GPM MT FT G (FT)
RUN
FC 1 20
90
Pump 1 10
ELBOW
A-B Discharg 4 218 5
e Line SWING
1 40
CHECK
DRV 1 120
Pump
B-C Discharg 4 218 2.9 9 TEE 2 21
e Header
Chiller
C-D Suction 4 218 5.93 19.45 TEE 2 21
Header
FC 1 20
Chiller 90
1 10
D-E Suction 4 218 1.41 4.62 ELBOW
Line M.B.V 1 120
G.V 1 120
CHILLER
FC 1 20
Chiller
90
E-F Discharg 4 218 1 3.28 1 10
ELBOW
e Line
DRV 1 120
Chiller 90
1 10
F-G Dischage 4 218 7.4 23.61 ELBOW
Header TEE 3 21
BY
G-H PASS 4 218 2.87 9.44 TEE 2 21
LINE
Pump
H-I Suction 4 218 2.88 9.44 TEE 2 21
Header
90
2 10
ELBOW
FC 1 20
Pump
I-J Suction 4 218 6
Line
90
1 10
Pump ELBOW
I-J Suction 4 218 6 TSTRAI
Line 1 60
NER
I.V.VAL
1 4.5
VE
HEAD LOSS IN FT O
SAFETY FACTOR 1
TOTAL HEAD LOSS IN F
TOTAL HEAD LOSS IN
LATION
TOTAL
EQT. TOTAL HEAD FRICTION
LENGT EQT. LOSS LOSS
H OF LENGT
FITTIN H (Ft) Ft OF
IN Ft OF H2O
G (FT) H2O/100
190 195 1.329 2.6
42 51 1.329 0.68
42 61.45 1.329 0.8
270 274.62 1.329 3.6
15
150 153.28 1.329 2.04
93 116.61 1.329 1.5
42 51.44 1.329 0.68
62 71.44 1.329 0.95
94.5 100.5 1.329 1.3
94.5 100.5 1.329 1.3
HEAD LOSS IN FT OF WG 31.37
SAFETY FACTOR 15 % 4.7055
TOTAL HEAD LOSS IN FT OF WG 36.0755
TOTAL HEAD LOSS IN METER 2.03
SECONDARY PUMP HEAD CALCULATION Total
Eqvlt.
Eqvlt.
Descripti Size (dia) Flow Straight Length Length
Valves & Length
Section on of QTY. of
Fittings of
pipe run inch. GPM Mtr Ft fittings
fittings
(Ft)
Supply Side (Ft)
Flex.
Connecti 1 20
on
Secondar
y Pump Swing
a-b Discharge 5 278 6 223
Check 1 50
Line Valve
90 Elbow 1 13
DRV 1 140
Secondar
y Pump
b-c 5 278 2.31 7.58 Tee 2 25 50
Discharge
Header
Tee 1 25
c-1 Stright Pipe 31/2 130.16 8.52 27.95 51
90 Elbow 2 13
Tee 1 25
.1-2 Stright Pipe 21/2 55.44 7.39 24.2392 38
90 Elbow 1 13
Tee 1 25
.2-3 Stright Pipe 21/2 55.44 12.16 39.88 51
Elbow 2 13
.3-4 Stright Pipe 1 .5 55.44 10.12 33.19 TEE 2 25 50
Reducer 1 0.7
.4-5 Stright Pipe 2-Nov 10.08 7 22.96 50.7
TEE 2 25
Flex.
Connecti 1 20
5.-6 Fcu suction line 1 10.08 6.00 on 26
I.V 1 6
5-Jan Fcu
Return Side
Flex.
Connecti 1 20
7_6Fcu discharge line 1 10.08 6.00 on 26
I.V 1 6
6_5 Stright Pipe 1 10.08 7 22.96 TEE 1 25 25
REDUCER 1 1
ELBOW 1 13
.5-4 Stright Pipe 1.1/2 10.08 6.11 20.04 Tee 1 25 39
.4-3 Stright Pipe 21/2 55.44 10.12 36.08 Tee 1 25 25
.3-2 Stright Pipe 21/2 55.44 12.16 39.88 Elbow 2 13 26
Tee 1 25
2_1 Stright Pipe 21/2 55.44 7.39 24.23 38
Elbow 1 13
.1-d Stright Pipe 5 278 10.55 34.6 Tee 1 25 25
d-e Bypass Line 5 278 3.06 10.04 Tee 1 25 25
Secondar
y Pump
e-f 5 278 3.58 11.7424 Tee 3 25 75
Suction
Header
Flex.
Connecti 1 20
Secondar on
y Pump
f-a 5 278 6 119
Suction Strainer 1 80
Line
Elbow 1 13
I.V 1 6
HEAD LOSS (Ft. of WG
SAFETY FACTOR 15%
TOTAL HEAD LOSS (Ft. of WG
TOTAL HEAD LOSS (Mtr.
HP=(𝑮𝑷𝑴∗𝑻𝒐𝒕𝒂𝒍 𝑯𝒆𝒂𝒅 𝑳𝒐𝒔𝒔(𝒇𝒕)∗𝑺𝒑𝒆𝒄𝒊𝒇𝒊𝒄 𝑮𝒓𝒂𝒗𝒊𝒕𝒚 𝒐𝒇 𝑾𝒂𝒕𝒆𝒓)/(𝟑𝟗𝟔𝟎∗�
%(70%))
N
Total Friction Friction
Eqvlt. Factor Loss
Length Ft of
(Ft) Ft of WG
WG/100
229 1.3492 3.09
57.58 1.349 0.78
78.95 1.349 1.06
62.24 2.44 1.52
90.88 2.44 2.22
83.19 1.527 1.27
73.66 0.87 0.64
32.00 0.87 1.00
10.00
32.00 0.87 0.28
47.96 0.87 0.42
59.04 0.08 0.05
61.08 1.527 0.93
65.88 1.527 1.01
62.23 1.527 0.95
59.6 1.394 0.83
35.04 1.394 0.49
86.74 1.394 1.21
125 1.349 1.69
HEAD LOSS (Ft. of WG) 29.44
SAFETY FACTOR 15% 5.07
TOTAL HEAD LOSS (Ft. of WG) 4.42
TOTAL HEAD LOSS (Mtr.)
𝒇 𝑾𝒂𝒕𝒆𝒓)/(𝟑𝟗𝟔𝟎∗�
4.266528
TAIBA ENGINEERING CO
STAIRCASE PRESSURIZATIO
Air Required to Pressurize the Staircase
Leakage flow through door or windows cracks……….Q=0.83 Ae P ^(1/n)
Pressure in Stair Case (Pascal's) 50 pa,
N Factors (Doors N=2 & Windows N=1.6) 2
Typical floor door size (W x H)
No. Of Typical floors
Leakage area in mt. sq. (Typical Floor)
Ground floor door size (WxH)
Leakage area in mt. sq. (Ground Floor)
Total Leakage Area in Sqmt
Air Required to flow through cracks Q=0.83 Ae P^1/n
Safety Factor (50%)
Total Air Required to flow through cracks--(A)
Air quantity required topressurize through open door Q=AxV---(B)
Area of Open Door (sqmt)
Velocity through open Door (m/s)
Air quantity required flow through open Door (M3/S)
Total Air Reruired to pressurize the Staircase (M3/S)--(A+B
Exhaust Air Louver Size A=Q/V
Flow Through Fire Floor (M3/S)
Velocity through louver (M3/S)
Louver Size (sqmt)
Pressure Relief Size AE = Q / (0.83xP^1/N) =
Pressure Relief Size (sqmt)
A ENGINEERING CONSULTANT
STAIRCASE PRESSURIZATION
n)
50 pa,
2
1.5
4
0.03 sqmt
0.12 sqmt
0.72 CMS
0.36 CMS
1.06 CMS
3.3 sqmt
0.75 m/s
2.4 CMS
3.46 CMS
2.4 CMS
2.5 m/s
0.96 sqmt
N) =
0.4 sqmt
RING CONSULTANT
RESSURIZATION
4
0.03 sqmt
0.12 sqmt
0.72 CMS
0.36 CMS
1.06 CMS
3.3 sqmt
0.75 m/s
2.4 CMS
3.46 CMS
2.4 CMS
2.5 m/s
0.96 sqmt
0.4 sqmt
TAIBA ENGINEERING CONSULTANT
KITCHEN VENTILATION
HOOD SIZING
Length (mm) Width (mm)
STOVE SIZE
STOVE SIZE
Exhaust and fresh air flow rate
Exhaust flow rate CFM
Fresh air flow rate CFM
ULTANT
Width (mm)
CFM
CFM
REF AREA SERVED FA CF
GF FCU 01 002,48 145.3
GF FCU 02 005,4,6,7,3 147.87
GF FCU 03 12,11,13 116.17
GF FCU 04 14,18,19,17 148.37
GF FCU 05 51 91.92
GF FCU 06 20,25,23,22 98.24
GF FCU 07 32,29,31 83.31
GF FCU 08 50 91.925
GF FCU 09 40,35,36,38,37 158.96
GF FCU 10 41,42 90.31
GF FCU 11 46,45,44,47 181.26