Project: 4 Storey Commercia Bldg.

Location: ARAYAT ST., CUBAO, QUEZON CITY

EXCAVATION & BACKFILLING


Excavation
Footing Location Soil Excavation Compaction Length

Mark Elevation Type Method Degree M


F-1 Elev. -3.0 Common Earth Back Hoe 95% 2.50
F-2 Elev. -3.0
F-3 Elev. -3.0

NOTES:
Prepared By: Engr. Hassan A.H.H. Sabi
Owner: MICROCADD INSTITUTE, Inc.

N & BACKFILLING
16-Nov-2018
Volume
Width Depth Quantity Volume Backfill
Excavated
M M Unit M3 M3
2.50 3.00 9.00 168.75 185.63
- -
- -
TOTALS 168.75 185.63
Say 168.80 185.70