You are on page 1of 1

YOUNIS

NOTES
(8 T)I)
9.0 .65( 5 1. LEVELS BASED ON OAK SURVEYS
8 .08 9.1 MH
1 DRAWING OS.P.0318TOPO. DATUM OF

(T) )
+10.00 CROWN OF ROAD
9 5 1 (1 T) I) (T) I) (T) I) ) ) ( T) (T)) (0 T))
9.1 9.1 .67(I 9.4 .21( (6 T) 8
9.4 .02( 1 (T .0 52 88(T(I) 0 (6 T) 1 (3 T)I)
2. PILING WORKING PLATFORM
MH 8 9.7 .58( 2 )
.9 86 9.8 .30(I 1 M2 9. 62 .0 0 6(I) .1 I
10 .50( (9 T) .0 I (0 T)
9 9.2 .26 .0 6 10 .51(
CONSTRUCTION TO BE BY
1 .4 CONC TXN 9.9 .50(
9 .39 TB
CD 9.1
5 9.2 9 2 8 75 9 9. .96 9 EP UM ) 0
1 0.0 EP 9 08 9.8 0.05 9.8 7 CONTRACTOR TO SUIT PILING RIGS
9 9 9.6 9. .9 83 9 9 T 1 . 1 MH TP EPEP
9 99 9 92
9.7
MH
9.9 0(DA 10 9. 9. EP EP
.9 16 .9 25 .9 33 9.34 .9 30 7 .0 13 0.09
MH
.9 45 9.6K I N .9 76 G U N.8L7 E W E 9.96
.0
T R E E10T 0 7 .10 .06 .0 03 .9 96
5
(3 T) I) À O 9
10 S - . 1 1 10 10
1 9.7
9.1 .83( 9.3
7
9.4
6 6 1 3 95 .01 North . 04 .0 12 .09 .0 06 .9 76
9.6 . 0 .0 08 .05
-
8 .18 MH 9.2 9.7 9.8
5 9 1 1 0 1 10 1 1 1 0
9
.9 73
MH RW 0.43 RW
EP 1 M3
TB
LP
MH CM .1 02 TP T
T
LP MHTP LP TP PLPL .64 .45 LP .91 .62 1 LP .74
1 T
.23 EXISTING
.71 GROUND LEVEL APPROX 11.5m T 11TP 11 MH11 11 .1 17 T 11.8TP 0
1TBM1 T
11 11 1.59 1
T 60 1 T T T .1 40 .68 T
T
.
10 shacks shacks 1 .62 11
shacks shacks T
T 11
1.58
BERM TYPICAL 10 .53
10.56
.58 0.95 .1 18 .31
T
1
0 1 1 .62 T .24 .32 .1 24

E
1 1 1 1 .28
1 1 .34 1 T 11 1 1

FENC
T 1 1
.51 1
1
T
10
T10.6 .84 .1 23 T
0 .13
T .1 58 .59 1 T
.0 55 1
11 .38 1 11
1 11
0.34 .22 .44 T 0.98 4
1 1 .1 00
10
.29
1 .1 62 T .99
1 0.9
10 1.45 W1
1 10 1
.0 48 1
1 T 5 .94
0.59 PILING WORKING PLATFORM
11
.3 10

EXISTING
1 51
.
.00 10 .93 T T
10 .9 94 .14 .0 76 10 .19 .0 93 .0 52
0 1 1
8.100
7 1 1 .76 1 .0 43 1
9.7 0.89 9.100m
.13
0
1 1 1
.28 1 1 T 0.8
10 1
.1 21
1 .56
0 .23
WALL .55 0.80 1 0
0 1 .05
.

1 1 1
1 1
RUBBLES .97 .52 .31
.9 48 10 T 10 0
2 RUBBLES 1
.0 61
DEPTH OF PILING MAT
9.3 .0 04.230 8
TO BE BY CONTRACTOR
11 1 9.8
.0 43 8
TO SUIT PILING RIGS
9.5
RUBBLES RUBBLES 1
RUBBLES .77 .29
6 1
.0 46 10
10.47 10
10.09 BERM TYPICAL
8.9 8.93
2 . 53 5 .46 .9 26
8. 5 8 .8 51 4
8.5 8
. 6 9 10
8.4 .39 9.0
2
Typical Piling Platform Section
.8 40
RUBBLES 10
THICK BUSH THICK BUSH demolished structure
T
9.3
5 .0 60 7
1 .24 9.9 8
9 .8 31 10 9.6
8 8 8.3 RUBBLES .0 06 .9 12
8.7 8.4 .9 17 1
8.4
1 7 .0 10 1
8.4 1 8.7
.33

WALL
6 0
THICK BUSH 8.7 1
9.9
3
RUBBLES 4 6
ING

8.7
9 9.8 9.5
.8 96 .8 44 .8 82 4 .8 71
9.8
.52 9 .8 65
EXIST

THICK BUSH
8 8.4 7 8 9
8.6 6 9.7 9.5
8.7
8.6
3 .9 41
.8 86 .9 18
.9 34
0 8.9
7 .8 78
.8 62 .8 68T 8.6
4 8.5 .8 27 7
8.6
8 .8 97 8.7
7.8
7 THICK BUSH
2 .8 69
7.5 7.54
7 1
7.6 7.9

FENCE
9
7.5 .8 24
.7 18 .9 07 9 6
.7 51 8.0
3
7.5 7.5 8
7.8
8
8.1
4
0 FOUND ATION 7.5 6
8.2 9 4 31 9 7.9
3 7.3 7.5 7. 7.4
T
.8 76 .8 02 1
7.5
1
7.6
0 .7 09 8
7.7
4 8.5
7.3 4
EXISTING STRUCTURE AND 0 5 8.5
.7 70
.8 23
8.8
6 7.5 7.3 7.9
2 W 9
PILES TO BE REMOVED 8.7
1
4 7.7
9 8.0
8.7 .7 84 5
7.8 .7 75
1 .7 91
7.2 8.6
5
.8 12 .8 07
4 .7 82 0
7.2 7.7 8
KURAMO WATERS 7.6
2 7.7
8.0
0 7.8
6

.8 05 .7 97
.7 22 4 2 .7 57
.7 56 7.4 5 7.6
7.5 .7 93 5
8.1
2 9
7.4
3
7.6
8 7.7 7.9
5 7.3
7 .7 87 4
6.8 9 8.3
1 7.7
7.6
4 7.8

.7 94
4 4 6 9 .8 20
7.6 5 8.0 8.0 8.2
4 8.0
8.1 .8 15
4 9
7.5 8.1
.7 99
.7 54 7.5
4 8.0
0
.8 47
EXISTING
7
GROUND 8.3
2
7 .7 96 8.4
7.5
7.9
8
8.4
0 LEVEL.8 54 APPROX
.60
8.0m8. 66
7.5
2 .8 79 8 2
2 8.5
2 8.1 .8 86 .8 38
.7 54 7.9 9.0
1

T5 06.09.18 ISSUED FOR TENDER DJP BS Client: Drawing title: Scale at A0: Drawn by: Date: Chk'd by:
T4 06.09.18 ISSUED FOR TENDER DJP BS As indicated DJP MAY 2018 BS
T3 05.09.18 ISSUED FOR TENDER DJP BS
Victoria Holidays Company Limited Site Piling Platfrom
T2 20.08.18 ISSUED FOR TENDER DJP BS Project:
P3 10.08.18 SCHEME DESIGN DJP BS La Definition TENDER
P2
P1
05.07.18
25.05.18
SCHEME DESIGN
SCHEME DESIGN
DJP
DJP
BS
BS
Akin Ogunlewe Road, Project Number: Drawing Type: Drawing No: Revision:
Victoria Island, Lagos.
T1
Rev
04.05.18
Date
ISSUED FOR TENDER
Amendments
DJP
By
BS
Chk'd
1731 DR 500 T5

You might also like