DERİNER

DAM


GENERAL INFORMATION




HISTORY OF THE DAM



CONSTRUCTION PROCESS


• THE DERINER DAM IS GIGANTIC CONCRETE WEDGE IN THE MIDDLE OF TWO MOUNTAIN SIDES, BUT IN ORDER TO
GIVE IT THAT EXTRA STABILITY TO HOLD BACK THE WATER IN THE RESERVOIR, THEY HAVE TO ANCHOR THAT DAM
INTO THE BEDROCK.

• WATER PRESSURE COULD CAUSE THE DAM BODY TO SLIDE ALONG THE ROCK FACE, CRACKING BEDROCK
AND WEAKINING THE DAM.
• TO PREVENT THAT, THEY ARE BINDING THE CONCRETE TO THE BEDROCK WITH 12
METERS DRILLING AND FILLING THE HOLES WITH HIGH-STRENGTH GROUT.

PHYSICAL PROPERTIES
PHYSICAL PROPERTIES


PROJECT USE


HYDROELECTRIC POWER PLANT
HYDROELECTRIC POWER PLANT


HYDROELECTRIC POWER PLANT


HYDROELECTRIC POWER PLANT