Professional Documents
Culture Documents
DAM
•
•
GENERAL INFORMATION
•
•
•
HISTORY OF THE DAM
•
•
•
CONSTRUCTION PROCESS
•
•
• THE DERINER DAM IS GIGANTIC CONCRETE WEDGE IN THE MIDDLE OF TWO MOUNTAIN SIDES, BUT IN ORDER TO
GIVE IT THAT EXTRA STABILITY TO HOLD BACK THE WATER IN THE RESERVOIR, THEY HAVE TO ANCHOR THAT DAM
INTO THE BEDROCK.
• WATER PRESSURE COULD CAUSE THE DAM BODY TO SLIDE ALONG THE ROCK FACE, CRACKING BEDROCK
AND WEAKINING THE DAM.
• TO PREVENT THAT, THEY ARE BINDING THE CONCRETE TO THE BEDROCK WITH 12
METERS DRILLING AND FILLING THE HOLES WITH HIGH-STRENGTH GROUT.
•
PHYSICAL PROPERTIES
PHYSICAL PROPERTIES
•
•
PROJECT USE
•
HYDROELECTRIC POWER PLANT
HYDROELECTRIC POWER PLANT
•
•
HYDROELECTRIC POWER PLANT
•
HYDROELECTRIC POWER PLANT