Requirement Document s for Planning Permission Application to OSC, Sepang

1.0 Land Surveyor


1) Detailed Survey Plan & Cross Section Proposed Platform level Plan 15 Copies

2.0 C&S Engineer


1) Storm water Management Report & OSD plan/ Pelan Jajaran 9 Copies
2) Sewerage report , plan & form PDC 1, Checklist PDC1a, Form WSIA 2 Copies
3) Water Demand Calculation 1 Copy
4) Earthwork (section and platform level) 10 Copies
5) Slope Analysis Plan & Geotechnical Report (for hills area class 3 and 4 only) 1 Hardcopy&
Softcopy
6) Plan cross section X-X and Y-Y to a service reservoir, suction tank and pump 1 copy
station that shows the distance "setback" and slope built into the
proposed site
7) Full Checklist for PBAN 1 copy
8) geological terrain mapping report by a geologist registered with the board 1 hardcopy
members geological for hillside slope of 15 degrees and above softcopy
9) Site investigation report prepared by a licensed contractor 1 copy
10) Review of site assessment (PAT) of the Department of Environment 1 copy
11) Comment from technical department (SYABAS) 1 copy
12) Certificate from engineer 1 copy
13) Acknowledgement letter from JPS 1 Copy

3.0 M&E Engineer


1) Electric Demand Calculation (initial &final load) & plan schematic 4 Copies
2) Plan Proposal Telecommunications Cabinet 2 Copies &
Softcopy
3) Layout verification letter from Network Service ( TM ) 1 copy
4) Comment from technical department (SKMM, TNB) 1 copy
5) Certificate from engineer 1 copy

4.0 Accountant / co. sec


1) Project Cash Flow 1 copy
2) Property valuation report 1 copy

5.0 Valuer
1) Valuation Report 3 copies

6.0 Sepang International Circuit


1) Land Title (certified true copy) 1 copy
2) Official Search 1 copy
3) Latest Quit Rent (2016) 1 copy
4) Latest Assessment Receipt ( July- Dis 2016) 1 copy
5) Letter from valuation Dept. ( if no receipt)
6) Appointment Letter of Consultant 1 copy
7) Power Attorney ( If any) 2 copies
8) Consent Letter ( if land Caveat or charge) 1 copy
9) M&A, Form 49 & Form 24 1 copy
10) Identity Card of Land Owner/ Director 2 copies
11) Company Profile 1 copy
12) SSM Company 1 copy
13) Certified Plan 1 copy
14) Approval Letter 1 Copy
15) Borang 7 D/ Borang 12D 1 Copy
16) Borang PAT 1 Copy

7.0 Architect
1) Building Plan Softcopy
2) Area Tabulation Softcopy
3) Carparking Calculation (Requirement / Provision) SoftCopy
4) Building Perspectives Softcopy

8.0 Traffic Engineering


1) TIA Report 4 copies
2) Perakuan kebenaran laluan yang telah disahkan

OSC 3.0

Preconsult with Planning Department for Confirmation Of Technical


Department Involvement.

Note :

TM
TNB To Be Submitt Early & Respond Prior to OSC Submission
SKMM
SYABAS
JPS