Professional Work Samples
ets-lindgren

Summary

RF shielded chamber installations are


designed to allow electronics developers
to test systems ranging from autonomous
vehicles to new 5G wireless technologies in
cell phones.

Projects are designed to be prefabricated and


shipped to site for assembly inside parent
building architecture. As Project Designer,
responsibilites begin with the PO and end with
on site delivery, which is when the Project
Manager takes full conrol of the project.

Over 50 projects completed for a wide variety


of customers, both domestic and international.
NOTES:
1. THE ERECTION SITE MUST BE ENCLOSED AND FILTER SCHEDULE
DRY. THE FLOOR ON WHICH THE SHILDED
ENCLOSURE IS TO BE INSTALLED MUST BE REF. QTY MODEL DESCRIPTION COMMENTS
LEVEL TO 1/8" OVER 10 FEET. F1 3 LPRX-4x60-4 RF FILTER PANEL,0-480V,4x60A, 0-400Hz
2. BUILDING CONTRACTOR TO ALLOW ENOUGH F2 4 EQ-2001-NR RF FILTER, 30VAC/50VDC, 2x1A, 0-60Hz
SPACE BETWEEN CHAMBER AND PIT AND F3 1 ELUL-2030 RF FILTER,0-480V,2x0-30A,60Hz
PARENT ROOM FOOTING FOR CONCRETE 23' - 4"
FORMS. F4 3 LTC-8640-E128K/PEN RF FILTER ISDN, 125VAC,8x.50A
F5 3 260366 10/100/1000 BASE-T GIGAFOIL FILTER FOR CAT REQUIRES 120V POWER OUTLET BY
12"X12" CONNECTOR PANEL 5 HIGH SPEED INTERNET OTHERS
W/ (1) BNC CONNECTOR (TYP.) (3PL) (2 PER ROOM) WGF-4 FEEDTHRU (MIN. 6" APART TYP.)
Grand total: 14

6" min.
6' - 0 3/8"
F5 S4X7.7 BEAMS
MAX LENGTH
12' 8"

FOR REF ONLY


ESTIMATED MECHANICAL
OVERHEAD LOCATION

12' - 1"
F1 9'-7" A.F.F.
16' - 2"

2' - 0"
ALL FILTERS FIELD LOCATED

6' - 0"
F5
F4

F2
2' - 0"

11' - 11"

5' - 5"
1' - 11 5/8"

2' - 0 3/8"
9
RF2
F2 7
F1 RF2
2' - 6"
31' - 6"

2' - 0" F4 1' - 6 3/8"

7' - 6"
1"ø WAVEGUIDE SPRINKLER
6
RF2 FEEDTHRU W/DIELECTRIC UNION (7PL)
3' - 9"

6' - 0" 6' - 0 3/8" 3' - 11 5/8" 4' - 0 3/4" 6' - 6" 5' - 6 3/4"

EXISTING SECURE BULKHEAD (9'2" A.F.F.)

6" min.
6" min.

19' - 5"
GROUND STUD TO PARENT BUILDING
8 (FIELD LOCATED)
RF2
F5 5 F5
RF2
1' - 11 5/8"
2' - 0"

ALL GIGAFOIL FILTERS REQUIRE


120V POWER RECEPTACLE BY OTHERS
(SUGGESTED 110" HIGH ON EXISTING
F1
ROOM WALL)
11' - 7"

F4
1' - 6"

2' - 0"
F2
ALL FILTERS FIELD LOCATED
1' - 6"

1' - 6"
2
1 RF10
RF10

35' - 3"

CEILING PLAN
1
1/2" = 1'-0"
Professional Work Samples
ets-lindgren

Details

Team: Project Manager, Project Designer, RF


Engineer, Structural Engineer

Responsibilities as Project Designer:

-Complete drawing packages for customer


approval, manufacturing, and installation

-Coordinate project deliverables with project


manager

-Coordinate BIM models & CAD drawings


with parent building architects & structural
engineer

-Coordinate HVAC, Electrical, and fire


supression systems

-Complete Bill of Material for all parts of


assembly to be shipped to site

-Conference with customers to provide design


iterations and drawing reviews
Student Work
illinois institute of technology 2 mile tower - Miami
2 Mile Tower
Miami
Future
3,218m
10,560ft

Burj Khalifa Shanghai Tower Makkah Royal Clock One World Willis Tower Taipei 101 Shanghai World International John Hancock Center Petronas Towers 1 & 2
Dubai Shanghai Tower Hotel Trade Center Chicago Taipei Financial Center Commerce Centre Chicago Kuala Lumpur
2010 2015 Mecca New York City 1974 2004 Shanghai Hong Kong 1969 1998
830m 632m 2012 2014 527m 508m 2008 2010 457m 452m
2,723ft 2,073ft 601m 546m 1,729ft 1,667ft 494m 484m 1,499ft 1,483ft
1,972ft 1,792ft 1,622ft 1,588ft

1 2 3 4 5 6 7 8 9 10 10

World’s ten tallest buildings according to Height to Tip (as of December 2015) © Council on Tall Buildings and Urban Habitat
TAYLOR LILLY
ARCHITECTURE

TAYLOR LILLY
ARCHITECTURE
Student Work Jacobs House Case Study
illinois institute of technology

USONIAN HOUSE 171 REVIT

CASE STUDY
Student Work high speed rail + market
illinois institute of technology

Work

Live
Play

Work
Student Work GIS Mapping - Chicago
illinois institute of technology
Student Work Side Projects - Digital fabrication + woodworking + furniture making
illinois institute of technology

You might also like