The production schedule outlines filming over several weeks in November, including finalizing actor timings the week of November 12th, filming scenes the weeks of November 10th and 19th, and editing the filmed clips together the weeks of November 12th and 13th before finalizing the editing the week of November 15th.
The production schedule outlines filming over several weeks in November, including finalizing actor timings the week of November 12th, filming scenes the weeks of November 10th and 19th, and editing the filmed clips together the weeks of November 12th and 13th before finalizing the editing the week of November 15th.
The production schedule outlines filming over several weeks in November, including finalizing actor timings the week of November 12th, filming scenes the weeks of November 10th and 19th, and editing the filmed clips together the weeks of November 12th and 13th before finalizing the editing the week of November 15th.
Please include location, time of film, what you are filming and team members including actors
Date Plan of action Evaluation / behind
Week beginning the scenes 12th nov Finalise the actors timings 19th nov Film the scenes needed 10th nov Film the scenes needed 12th nov Edit the clips together 13th nov Edit the clips together 15th nov Finalise editing
Adjudication Order against Shri. Bhanwarlal H Ranka, Shri. Pradeep B Ranka, Ms. Kusum B Ranka, Ms. Sangeetha P Ranka, Ms. Anjana B Ranka, Shri. Arun B Ranka , Ms. Rachana A Ranka and Shri. Kantilal G Bafna in the matter of Residency Projects and Infratech Ltd.