You are on page 1of 1

Flow Process Chart

Operation Transport Inspection Delay Storage VA.ENVA.NVA

Step # Activity description Time (minutes) Distance (meters)    D s Value Category

1
2
3
4
5
6
7
8
Count: 0 0 0 0 0
Time per process step: 0 0 0 0 0

Total VAs 0 Total NVAs 0 Total ENVAs 0


VAs Time 0 Minutes NVAs Time 0 Minutes ENVAs Time 0
Distance traveled 0 Meters Lead Time 0 Minutes VS Ratio

Guidelines:
A Flow Process Chart is a representation illustrating the sequence of actions within a process.
1st: List all activities within the process.
2nd: Identify the type of activities (operation, transport, etc.).
3rd: Classify each activity into value adding, non-value adding or essential non-value adding (ENVA).
Use only the character "X" under the symbols (in the gray area).

You might also like