You are on page 1of 35

Eurocodes:

Background & Applications


GEOTECHNICAL DESIGN with worked examples 13-14 June 2013. Dublin

Worked example –
strip foundation

Professor Giuseppe Scarpelli


Università Politecnica delle Marche
Ancona, Italy
y
Past Vice-Chairman TC250/SC7
Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN with worked examples 13-14 June 2013. Dublin

Spread foundations-
Design of a strip foundation
CASE STUDY
Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

•Design situation:

Strip
S i foundation
f d i for f a concrete building
b ildi whose
h d i i is
destination i civil
i il habitation.
h bi i I is
It i
composed of four floors. The embedment depth of foundation is 1.5 m; the
groundwater level is situated at 1.5 m from the ground surface. Allowable
settlement is 5 cm.

3 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Normal forces (kN)*


•Characteristic values of actions:
-Gk=permanent vertical load; Gk -460.147
C1
-Qk=variable vertical load. Qk -108.138
Gk -687.103
C2
Qk -222.355
Gk -627.8
C3
Qk -154.012
Gk -623.915
623 915
C4
Qk -152.261
Gk -685.011
C5
Qk -222.231
222 231
Gk -416.982
C6
Qk -108.103

*(shear forces and bending moments are negligible for static conditions)
conditions).

•Require foundation width, B to satisfy both ULS and SLS.

4 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Annex B.3 of Eurocode 7 Part 2

Recommended depth of investigation for spread foundations

5 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

6 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

20-26 m

0-2 m

2-4 m 26-30 m

4-6 m

6-20 m

7 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

qc (MPa) qt (MPa) fs (kPa) u2 (MPa)

0 20 40 0 100 200 300 0,0 0,5 1,0 1,5


0 0 0

5 5 5

10 10 10

15 15 15

CPT results

z (m)

z (m)
z (m)

20 20 20

2
25 25 25

30 30 30

35 35 35

40 40 40

8 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Qt Fr

0 100 200 300 400 500 0 50 100 150


0 0

5 5

10 10

15 15
z (m)

z (m)
20 20

25 25

30 30

35 35

40 40

9 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Normalized CPT soil behaviour type chart after


Robertson (1990).

10 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Eu/cu = f (Ip, OCR)

Duncan and Buchignani (1976).

11 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

cu=(qt-σv0)/Nk
Nk=19
Undrained cohesion from CPT test, Lunne et al.
(
(1977) )

Ed (MPa)
(MP ) = 4 qc
(if qc > 10 MPa)
Oedometric modulus from CPT test (after Lunne-
Christoffersen 1983 - Robertson and Powell 1997)

12 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Oedometer test results


Sample depth (z) = 25 m
Natural water content (W) =32.74 %
Unit weight (γ) =19 kN/m3
Water depth (zw) = 2.5 m

13 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

50 kPa 100kPa 200kPa


400kPa 800kPa 1600kPa

0,00

0,50

1,00
Setttlement (mm)

1,50

Average Cv=2*10-3 cm2/s


,
2,00

2,50

3,00

3,50
01
0,1 1 10 100 1000 10000
time (min)

14 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Soil Conditions:

Soil 1: medium dense


sand (0(0-20
20 m)
γ = 18.5 kN/m3
c’ k= 0 φ’k= 38°
E’ = 30 MPa

Soil 2: clayey silt


γ = 18.5 kN/m3
Cc = 0.36
Cs = 0.022
Cv=2*10-3 cm2/s
Cuk = 80 kPa

15 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN with worked examples 13-14 June 2013. Dublin

Spread foundations-
Design of a strip foundation
BEARING RESISTANCE
Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

B=1.5 DA1-1 DA1-2

PARTIAL FACTORS A1+M1+R1 A2+M2+R1

Vd (kN) 7395.74 5661.00


Nq 48.87 23.17
Nγ 74.80 27.72
sq 1 04
1.04 1 04
1.04
sγ 0.98 0.98
Rd (kN) 15320.80 5676.52
Rd/Vd 2.07 1.00

17 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

B=1 21
B=1.21 DA2
PARTIAL FACTORS A1+M1+R2
Vd (kN) 7160.10
Nq 48.87
Nγ 74.80
sq 1 03
1.03
sγ 0.98
Rd (kN) 7150 58
7150.58
Rd/Vd 1.00

18 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

B 1 74
B=1.74 DA3
PARTIAL FACTORS A1/A2+M2+R3
Vd ((kN)) 7590.75
590 5
Nq 23.17
Nγ 27.72
sq 1.04
sγ 0.98
Rd (kN) 7612 07
7612.07
Rd/Vd 1.00

19 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

3.50
D = 0 m, φ' = 38°
3.00

2.50 DA1-COMB1

2.00 DA2-COMB2
Rd/Vd

DA2
1 50
1.50
DA3
1.00

0.50

0.00
0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
B (m)

20 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

12.00
B = 1.74 m , φ'=38°
10.00

DA1-COMB1
8.00
DA2-COMB2
Rd/Vd

6.00
DA2

4.00 DA3

2.00

0.00
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5
D (m)

21 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

10 00
10.00

9.00
B = 1.74 m , D = 0 m
8.00

7 00
7.00 DA1-COMB1
DA1 COMB1

6.00
DA2-COMB2
Rd/Vd

5.00

4 00
4.00 DA2

3.00
DA3
2.00

1 00
1.00

0.00
20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 42.0 44.0
φ'k (°)

22 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN with worked examples 13-14 June 2013. Dublin

Spread foundations-
Design of a strip foundation
CHECK FOR
SERVICEABILITY
Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Immediate settlement
n
I(H i ) − I (H i −1 )
s 0 = qB∑ (1 − ν 2 )
qB Ei
s0 = μ 0 μ 1 (1 − ν 2 ) i =1

E I = μ 0μ1

Janbu et al. (1956)


μ1

μ0

square
circular

24 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

....considering the single strip footing


q (kPa)= 167.32
B (m) = 1.50
L (m) = 21.40
H ((m)) = 50
ν= 0.3
E' (kPa) = 30000
H/B = 666 7
666.7
D/B = 1
L/B= 14.3
μ0 = 1
μ1 = 1.8
δ (m)= 0.014

25 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

q (kPa) = 64.77
B (m) = 15.50
L (m) = 21.40
H1 = 20
H2 = 50
ν1 = 0 30
0.30
ν2 = 0.50
cu (kPa) = 80.00
....considering an equivalent Eu (kPa) = 32000
spread foundation spanning E' (kPa) = 30000
over the whole building base H1/B = 1.29
area H2/B = 64 52
64.52
D/B = 0.00
L/B= 1.38
μ0 (1) = 1.00
μ1 (1) = 0.50
μ0 (2) = 1.00
μ1 (2) = 0.70
δ (m)= 0.021

26 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Oedometric settlement

Soil 1: medium
dense sand (0-20 m)
γ = 18.5 kN/m3
cc’ = 0 φ
φ’=
= 38°
E’ = 30 MPa

Soil 2: clayey silt


γ = 18.5 kN/m3
Cc = 0.36
Cs = 0.022
Cv=2*10-3 cm2/s
Cu = 80 kPa

27 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

6.6.2 (5) The depth of the compressible soil layer to be


considered when calculating settlement should depend on the size
and shape of the foundation, the variation in soil stiffness with
depth and the spacing of foundation elements.

28 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Stress increment

29 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

z (from
l
layers Δz σz u σ''z Δσz σ''z_fin Sed
g.s.) e0 Δσz /σ'z ef εz
(m) (kPa) (kPa) (kPa) (kPa) (kPa) (m)
(m)
1,00 0,50 20,25 374,63 174,13 200,50 0,91 21,67 0,11 222,17 0,86 0,023 0,012

2,00 0,50 20,75 383,88 179,03 204,84 0,90 20,87 0,10 225,71 0,86 0,022 0,011

3,00 0,50 21,25 393,13 183,94 209,19 0,90 20,10 0,10 229,29 0,86 0,021 0,010

4,00 0,50 21,75 402,38 188,84 213,53 0,90 19,37 0,09 232,90 0,86 0,020 0,010

5,00 0,50 22,25 411,63 193,75 217,88 0,89 18,68 0,09 236,55 0,86 0,019 0,009

6 00
6,00 0 50
0,50 22 75
22,75 420 88
420,88 198 65
198,65 222 22
222,22 0 89
0,89 18 01
18,01 0 08
0,08 240 24
240,24 0 86
0,86 0 018
0,018 0 009
0,009

7,00 0,50 23,25 430,13 203,56 226,57 0,89 17,38 0,08 243,95 0,86 0,017 0,009

8,00 0,50 23,75 439,38 208,46 230,91 0,88 16,78 0,07 247,69 0,85 0,016 0,008

9,00 0,50 24,25 448,63 213,37 235,26 0,88 16,20 0,07 251,46 0,85 0,015 0,008

10,00 0,50 24,75 457,88 218,27 239,60 0,88 15,66 0,07 255,26 0,85 0,015 0,007

11,00 0,50 25,25 467,13 223,18 243,95 0,88 15,13 0,06 259,08 0,85 0,014 0,007

12,00 0,50 25,75 476,38 228,08 248,29 0,87 14,63 0,06 262,93 0,85 0,013 0,007

13 00
13,00 0 50
0,50 26 25
26,25 485 63
485,63 232 99
232,99 252 64
252,64 0 87
0,87 14 16
14,16 0 06
0,06 266 79
266,79 0 85
0,85 0 013
0,013 0 006
0,006

Stot= 0,033

30 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

z (from
layers Δz σz u σ'z Δσz σ'z_fin Sed
g.s.) Δσz /σ
/σ'z ef εz
(m) (kPa) (kPa) (kPa) (kPa) (kPa) (m)
(m)
1,00 2,00 21,00 388,50 181,49 207,02 20,48 0,10 227,50 0,86 0,022 0,043

2,00 2,00 23,00 425,50 201,11 224,40 17,69 0,08 242,09 0,86 0,017 0,035

3 00
3,00 2 00
2,00 25 00
25,00 462 50
462,50 220 73
220,73 241 78
241,78 15 39
15,39 0 06
0,06 257 17
257,17 0 85
0,85 0 014
0,014 0 029
0,029

4,00 2,00 27,00 499,50 240,35 259,16 13,48 0,05 272,64 0,84 0,012 0,024

5,00 2,00 29,00 536,50 259,97 276,54 11,88 0,04 288,42 0,84 0,010 0,020

6,00 2,00 31,00 573,50 279,59 293,92 10,54 0,04 304,46 0,83 0,008 0,017

7,00 2,00 33,00 610,50 299,21 311,30 9,40 0,03 320,70 0,83 0,007 0,014

8,00 2,00 35,00 647,50 318,83 328,68 8,43 0,03 337,11 0,82 0,006 0,012

9,00 2,00 37,00 684,50 338,45 346,06 7,60 0,02 353,65 0,81 0,005 0,010

10 00
10,00 2 00
2,00 39 00
39,00 721 50
721,50 358 07
358,07 363 44
363,44 6 88
6,88 0 02
0,02 370 31
370,31 0 81
0,81 0 004
0,004 0 009
0,009

11,00 2,00 41,00 758,50 377,69 380,82 6,25 0,02 387,07 0,80 0,004 0,008

12,00 2,00 43,00 795,50 397,31 398,20 5,71 0,01 403,90 0,80 0,003 0,007

13,00 2,00 45,00 832,50 416,93 415,58 5,23 0,01 420,81 0,79 0,003 0,006

13,00 2,00 47,00 869,50 436,55 432,96 4,81 0,01 437,76 0,78 0,003 0,005

13,00 2,00 49,00 906,50 456,17 450,34 4,43 0,01 454,77 0,78 0,002 0,005

Stot= 0,243
Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli

Settlement time development


p

2H

32 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli
qc (MPa) qt (MPa) fs (kPa) u2 (MPa)

0 20 40 0 100 200 300 0,0 0,5 1,0 1,5


0 0 0

5 5 5

10 10 10

15 15 15

z (m)

z (m)
z (m)

20 20 20

H ≈ 1.5 m
25 25 25

30 30 30

time (days)
35 35 35
0 20 40 60 80 100 120 140 160
ent (m)

0,00
40 40 40

0,01
settleme

0,02
0,03
0 04
0,04

33 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications

GEOTECHNICAL DESIGN with


ith worked
k d examples
l 13 14 J
13-14 June. D
Dublin
bli
qc (MPa) qt (MPa) fs (kPa) u2 (MPa)

0 20 40 0 100 200 300 0,0 0,5 1,0 1,5


0 0 0

5 5 5

10 10 10

15 15 15

z (m)

z (m)
z (m)

20 20 20

2H ≈ 7 m
25 25 25

30 30 30
H ≈ 3.5 m
35 35 time (months) 35

0 5 10 15 20 25 30
nt (m)

40 0,00 40 40

0 05
0,05
settlemen

0,10
0,15
0,20
0 25
0,25

34 ©2013. Giuseppe Scarpelli. All rights reserved


Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN with worked examples 13-14 June 2013. Dublin

Geotechnical design
with worked examples

eurocodes.jrc.ec.europa.eu