Professional Documents
Culture Documents
1. SALIN DATA PADA TABEL 1 DALAM BENTUK EXCEL DAN CARI NILAI HC
Test Intervals 1-
Boreholes Tabel Bantu DI 1-GCD LPI HC K (m/s)
(m) (RQD/100)
0.000001
0.0000001
0.00000001
0.000000001
1E-10
0 0.1 0.2 0.3 0.4
Nilai HC
3. Model Verification
Test Intervals 1- K Model
Boreholes DI 1-GCD LPI HC
(m) (RQD/100) (m/s)
Total Lenght Middle of depth (1-
Cumulative 3E-
of Borehole between packer 1-(RQD/100) 1-Lc/Lt 1-(Rg/Rt-Rs) RQD/100)*(DI)*( 06*HC^1.37
interval
(Lt) (Lc) 1-GCD)*(LPI)
CH-04 24.5 - 26.6 120 25.55 2.1 0.19 0.787 0.952 0.55 0.0783 9.045E-08
32.5 - 34.1 33.3 3.7 0.562 0.723 0.975 0.55 0.2177 3.69E-07
65.7 - 67.8 66.75 5.8 0.524 0.444 0.976 0.55 0.1248 1.717E-07
CH-04 120