You are on page 1of 2

V.O.

 ­ Rate Analysis for Providing and Fixing polycarbonate sheet
Quanti
S. No. Item Description Unit
ty
Rate analysis for polycarbonate sheet
A Material:
For 10 sqmts

808 Supply of  poycarbonate sheet Sqms 10.00


Transport  ,  Loading  and  Unloading  10,000/­  for  total  materail,  total  of 
Sqms 10.00
materail is 109.8Sqms = 10000/109.8 = 91.074
9999 Scaffolding charges L.S. 10.00
9988 Sundries including carriage L.S. 12.63
Accesaries for joints  Sqms 6.72
Total : A

Labour ­B
Matri Day 1.25
Coolie Day 2.50
Total : B
A+B
C Taxes & Duties:

 Add Water charges @ 1%   1%

Add Electricity charges @ 1%   1%

Add Overheads @ 15% 15.0%

Add CGST @ 9.0%  9.0%

Add SGST @ 9.0%  9.0%

Add labour cess @ 1%  1.0%

Total 

Rate for 10Sqms

Rate for Sqm

Rate for Sft
onate sheet
Total 
Rate
Amount

807.00 8070.00

91.07 910.74

120.00 1200.00
1.73 21.85
817.13 5489.49 73.77049 500 36885.25
10202.59 0.671862
6.718624 5490

800.00 1000.00
600.00 1500.00 2367.2
2500.00
12702.59

817.1316
127.03 549
127.03

12956.64

3473.88

16430.53

2396.98

2396.98

266.33

21490.82

31693.41

3169.34

294.55