Professional Documents
Culture Documents
Revision 9203
Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384
If only part of a kit is to be used, add MODEL SPECIFICATION with any advice, specification,
one volume of activator to three recommendation, or information given
volumes of base. Two-component epoxy primer and by the company.
Measuring must be accurate and filler coat for concrete floors.
separate stirrers used for proportioning FURTHER INFORMATION
each component. The primer/filler coat will be abecote
The mixed material must be left to stand 386, a two-component, filled, solvent- Where other products are to be used in
in a cool place for 20 minutes prior to borne polyamide epoxy resin system, conjunction with this material, the
application. applied in accordance with abe relevant technical data sheets should be
Construction Chemicals' consulted to determine total
COVERAGE recommendations. requirements. abe Construction
2
Chemicals has a wealth of technical
7 - 10 m / litre on porous surface,
2
PACKAGING and practical experience built up over
13 m / litre on smooth surface. years in the company’s pursuit of
abecote 386 is supplied in 1 l and 5 l excellence in building and construction
APPLICATION yield metal containers. technology.
Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384