You are on page 1of 4

Hitung momen ultimate yang dapat dipikul oleh balok di bawah ini

Bila diketahui
Fc' = 24.9 N/mm² Selimut Beton
Fy = 400 N/mm² D[sengkang]
As[total] = 3200 mm² D[tulangan utama]
Ts = 100 mm As[25]
Bw = 300 mm
H = 500 mm
B efektif = 250 mm
Bf = 550 mm
d = 447.5 mm
Menghitung a
a = (Asx Fy)/(0,85 x Fc' x Bf)
= (3200mm² x 400 N/mm)/(0,85 x 24,9 N/mm² x 550 mm)
= 109.9585507807 mm

3200mm� 3200mm�

Balok Sayap Balok Persegi


= 30 mm
= 10 mm
= 25 mm
= 490.625 mm²

3200mm�
Balok Sayap
∑H = 0
Tf = Cf
Asf x Fy = 0,85 x Fc' x Ts (Bf - Bw)
Asf x Fy = 1322.8125 mm²

Mnf1 = Asf x Fy ( d - 1/2 x Ts)


= 210327187.5 Nmm
= 210.3271875 kNm

Mnf2 = 0,85 x Fc' x Ts (Bf - Bw)x ( d - 1/2 Ts)


= 210327187.5 Nmm
= 210.3271875 kNm

Balok Badan
∑H = 0
Tw = Cw
Asw = As - Asf
= 1877.1875
Asw x Fy = 0,85 x Fc' x a x Bw
a = Asw x Fy / (0,85 x Fc' x Bw)
a = 118.2573430979 mm

Mnw1 = 0,85 x Fc' x a x Bw ( d - 1/2 a)


= 291618321.250689 Nmm
= 291.6183212507 kNm

Mnw2 = Asw x Fy x (d - 1/2 a)


= 291618321.250689 Nmm
= 291.6183212507 kNm

Kapasitas Momen Nominal Balok T


Mnt = Mnf + Mnw
= 501.9455087507 kNm

ɸMnt = 401.5564070006 kNm


Balok Persegi
a = As x Fy / (0,85 x Fc' x Bf)
= 201.5906764312
Mn1 = As x Fy ( d - 1/2 a)
= 443781967.084022 Nmm
= 443.781967084 kNm

Mn2 = 0,85 x Fc' x a x B (d - 1/2 a)


= 443781967.084022 Nmm
= 443.781967084 kNm

ɸMn = 355.0255736672 kNm