RAPID Package No.

5 – EPCC of Steam Cracker Complex (RAPID)


COMMENTS RESPONSE SHEET (CRS)

Date: 17-Nov-16
CRS No: RAPID-P0005-TYO-PIP-DWG-5213-0309-001_A-CRS
Rev No: A

Drawing / Document Number, Title and Revision: Transmittal Document Purpose:


Doc. No. RAPID-P0005-TYO-PIP-DWG-5213-0309-001 Title: GENERAL ARRANGEMENT DRAWINGS X 3 - ACCEPTED WITHOUT COMMENT
Rev. No. A (A/G PIPING DRAWINGS): 5213 TANK
Transmittal No RAPID-P0005-TOYO-PMC-TRM-09925 FARM UNIT (C2/C3 INTERMEDIATE

No. Comments Confirmation / Explanation by Contractor


No comment.
1 TOYO will issue rev.0

PMC Comments Contractor Responses


Prepared by: Approved by: Date of Responses issue:
Prepared by: M.Nipat
Checked by: C.Noppawat
Name: TAN KEN NY Name: ABANG AZIAN ABANG MOK Approved by: S.Chokchai
Position: MECH/PIPING LEAD ENGINEER Position: ENGINEERING MANAGER