DESIGN BASE SHEAR

Frame along Total V to be


I Na Nv Ca Cv R w T r V Vmax Vmin Vz
Gridline Weight used
A&F 1618.09 1.00 1.00 1.00 0.44 0.64 3.50 3.00 0.549 1.00 538.94 508.54 78.32 147.94 508.54
B&E 1725.13 1.00 1.00 1.00 0.44 0.64 3.50 3.00 0.549 1.00 574.59 542.18 83.50 157.73 542.18
C&D 1619.05 1.00 1.00 1.00 0.44 0.64 3.50 3.00 0.549 1.00 539.26 508.84 78.36 148.03 508.84
1&5 2145.28 1.00 1.00 1.00 0.44 0.64 3.50 3.00 0.549 1.00 714.54 674.23 103.83 196.14 674.23
3&4 2126.17 1.00 1.00 1.00 0.44 0.64 3.50 3.00 0.549 1.00 708.17 668.22 102.91 194.39 668.22
2 2264.73 1.00 1.00 1.00 0.44 0.64 3.50 3.00 0.549 1.00 754.32 711.77 109.61 207.06 711.77

Vertical Distribution of Force (A&F)


Storey weight, w height, h wh Fx
2F 763.02 4.00 3052.08 150.56
3F 750.99 8.00 6007.92 296.37
RB 104.08 12.00 1248.96 61.61

Swh = 10308.96
Vertical Distribution of Force (B&E)
Storey weight, w height, h wh Fx
2F 816.28 4.00 3265.12 161.31
3F 799.17 8.00 6393.36 315.85
RB 109.68 12.00 1316.16 65.02
Swh = 10974.64
Vertical Distribution of Force (C&D)
Storey weight, w height, h wh Fx
2F 763.24 4.00 3052.96 150.27
3F 746.13 8.00 5969.04 293.80
RB 109.68 12.00 1316.16 64.78
Swh = 10338.16
Vertical Distribution of Force (1&5)
Storey weight, w height, h wh Fx
2F 1017.37 4.00 4069.48 143.40
3F 1002.00 8.00 8016.00 282.47
RB 587.32 12.00 7047.84 248.36

Swh = 19133.32

Vertical Distribution of Force (3&4)


Storey weight, w height, h wh Fx
2F 953.93 4.00 3815.72 198.45
3F 931.60 8.00 7452.80 387.60
RB 131.68 12.00 1580.16 82.18

Swh = 12848.68

Vertical Distribution of Force (2)


Storey weight, w height, h wh Fx
2F 1077.69 4.00 4310.76 214.06
3F 1055.36 8.00 8442.88 419.25
RB 131.68 12.00 1580.16 78.47

Swh = 14333.80