S.No Name of Quantity Specifications
Equipment
Should be suitable for generation of both active and reactive power
(Wh and Varh) and shall depict multiple of generators with Automated
voltage regulators and Synchronization with Grid system, generator
transformer, and step up transformer, unit auxiliary transformer with
switchgears and numeric Relays and CB protections.
Simulator The protection system shall include simulation of faults for tripping on
1 training kit Over current, Under Voltage, Under frequency, Over voltage,
1
for Power generator differential protection, Stator and Rotor earth faults, check
Plant synchronization, Bus bar protection scheme, LV and HV measuring
instruments, and SCADA system.
The equipment should use current power and with provision of a UPS
for 30 mints backup.
The Kit shall include incoming and outgoing switches, No load and
Loaded line with and without phasing, injection of VOLT-VAR Control
with reactor and Capacitor bank simulation, all measurements and
line protection relays. It shall represent Zone wise protection of
Distance Relays, Over current, Under voltage, over voltage, Under
frequency, over frequency, CB fault and trip circuit supervision, Bus
bar Protection etc. complete.
The Kit shall be suitable to simulate Yy0, Yy6, Dy5, DYn 11vector
groups for the transformers, paralleling of transformers, O/C and E/F
protective relays for HV and MV, Transformer Differential protection,
REF, CB fail, OT, WT and Fire protection system.
The kit shall have three phase numeric relays, in built digital I/O for
remote breaker operation. The simulator kit shall also include digital
interfaced instrument A-V-W-VAR-Wh-V,A, Cos(φ), and cables of
different lengths, trolley and Instruction manual, system software
and warranty for two years.
For implementing protection relay system with latest generation of
fully digital relays, for Under voltage, Picture thermal for lines and
transformers, overcurrent, Residual overcurrent, Overvoltage,
Simulating Kit
Residual overvoltage, Maximum directional current, Directional
for training on
earth fault , Distance protection, negative sequence, differential
Relay
protection, over fluxing and for Breaker Failure. The simulation kit
Protection
4 shall cater to Seimens, ABB, MICOM, SEL and GE relays.
and relay 1
coordination
The Simulation kit shall depict Relay protection of both Radial and
in radial and
Ring Networks.
Ring network
.
systems
The trip curves and all the functions of relays should be
programmable from PC with selectivity in current and in time. The
software should be able to set the parameters of the relay and
acquire real-time voltage, current and power of the circuit in which it
is inserted. To be provided with handbook covering implementation of
the protections of the line and downstream electrical machines from
the mathematical model.
Software for The software shall be suitable for design and simulation of micro grid
5 Simulation and comprising Solar PV, Wind and Bio-mass combinations and shall
1
Analysis of offer optimum solution combining technical feasibility, what if kind of
Micro grids sensitivity analysis and economics.
Simulation kit
for integration
of Generation- Simulation kit that interfaces the above Generation-Transmission and
Transmission- distribution simulation kits with suitable hardware and system
Distribution software .The Kit shall comprehensively depict the load flows and
( optional- not impact of active and reactive load changes in the Distribution network
6 for bid on transmission and Generation system and cascaded effect on the
56
evaluation but relay settings when downstream relay settings are tampered.
for
procurement The system shall include supply of related integrated software and all
later if accessories.
required by
us)