Sect 13 P Hydro Test Pack Save
Sect 13 P Hydro Test Pack Save
6 SAFETY REPORT
11 HYDROTEST REPORT
12 HYDROTEST REPORT
15 HARDNESS REPORT
16 ROUTING SLIP
Subject : C O V E R
413838505.xls 01
Date
Item :
Description :
Plant : Area :
7 Calib. Report Temp. Recorder 3-01-98-2024-B 22 Hydrostatic Test Calculation Sheet 2321-01-55-SPR-005R
8 Calib. Report Press. Gauge No.1 3-02-98-2010-G 23 Heat Treatment Instruction Sheet PM-I-09
9 Calib. Report Press. Gauge No.2 3-02-98-2010-F 24 Hardness Testting Record PM-J-07
12 Pipe Work Pretest Check List PM-H-01 26 Hydrostatic Test education sheets
13 Hydrotesting Test Report PM-H-02 27 Filiing Water & Disposal System 2321-00-74-DI-001R
This is confirm that associated work has been completed in accordance with the customers specifications and
1 3
2 4
413838505.xls 02
DATE : DATE : DATE :
413838505.xls 02
Date
20
21
22
23
24
25
26
27
28
29
30
REMARK'S
Print Name
413838505.xls PM-O-01/2
Signature
Date
413838505.xls PM-O-01/2
Date
10
11
12
13
14
15
16
17
18
413838505.xls PM-O-01/1
413838505.xls PM-O-01/1
Date
to psi. 27 Vent
110V Air
17 Come Along
18 Chain Fall
19 Shackles : Ton
Remark's
Print Name
413838505.xls 05
Signature
Date
413838505.xls 05
Rev. No. 0
Date
SAFETY PROCEDURE
FOR
HYDROSTATIC TEST
12
13
SUB-CON CUSTOMER
Print Name
Signature
Date
Date
2. Check that all NDT/Stress relieving requirements are as specified, have been met
and recorded.
3. Check that the correct bolts and gaskets are installed at all mechanical joints.
6. Check that all pressure connections are installed correctly as per specification.
7. Check for direction of flow through filters and strainers, traps, check valves, globe
valves and control valves.
9. Check that orifice flanges have required upstream and downstream "clearances'.
10. Check that the bores of all orifice flanges have been ground.
11. Check that all pipe supports are completely installed as per drawings and
schedules.
12. Check that all temporary pipe supports have been Install.
14. Check that all chainwheels required for specified valves have been installed.
16. Check that all orifice taps been seal welded and unused tapped holes have been
plugged and seal welded.
17. Check that all valves, sprinkler heads, rosettes, nozzles and other equipment
18. Check that all in-line valves are installed completely open and protected /
secured against unauthorized closing.
Plant : Area :
PIPE DATA : Spec. : Grade No. :
OD : WT :
TEST PRESSURE RANGE
Pressure Recorder
Temperature Recorder
Pressure Gauge
Deadweight Tester
TEST WITNESSED :
SUBCON QA/QC
DATE
CLIENT DATE
DATE
413838505.xls 08
DATE
413838505.xls 08
Date
Print Name
Signature
Date
Date
Plant : Area :
Diff. Elevation. :
Design Pressure :
Test Pressure :
(1.5xPd+Diff. El.)
REMARK'S :
Print Name
Signature
413838505.xls 10
Date
413838505.xls 10
Date
Page
PROJECT NAME
Milestone No. Rev.
TEST SIGNATURES
ISOMETRIC
LINE NO. DRAWING FLOW SHEET ORIGIN TO TERMINATE
NUMBER PRESSURE DATE CONTRACTOR FWEL
REMARKS
FROM POINT :
TO POINT :
START OF TEST :
END OF TEST :
OK
RECORDING INSTRUMENTS : CHECK CALIBRATION
TEST RESULT :
OK
ATTACHED : HYDROTEST TEMPERATURE CHARTS
Remark's
CO - 001
Contract No.
SHEET : 1 OF 1 ENCLOSED DOCUMENT RELEASE FOR HYDRO TEST NDT REQUIRMENTS % FINAL ACCEPTANCE
MAIN
DATE : 1. ISO.DWG. CONTRACTOR CLIENT CONTRACTOR CONTR. CLIENT
CONT. TO DWG.2321-57-74-DDW-201R
PROJECT NAME
31526 8132909 FW 2 2321/QC/WPS/02 WWR. BUTT WELD
CONT. TO DWG.2321-10-74-DDW-009R
Ref : PM - I - 14 / 1
DATE :
REV. 0
PAGE :
Date
Page
PROJECT NAME
Contract No. Milestone No. Rev.
CO-001 0
Heat Treatment required : .............................................. Start Time .............. Stop Time .............
Assigned to : ...........................................................................................................................................................................
PREPARED BY : DATE :
APPROVED BY : DATE :
PM-I-16.PM5
Date
Page
PROJECT NAME
Contract No. Milestone No. Rev.
CO-001 0
Date .............................
The lines noted below have been visually examined and are now ready for hardness testing.
Scaffolding is required and has been erected. .....................................................................................................................
These lines will be postweld heat treated and will require testing before
relocating equipment. ................................................................................................................................................................
...................................................................................................................................................................................................................
......................................................... ......................................
AREA SUPERVISOR
HARDNESS TESTING
....................... Date
The line noted above has been hardness tested and was ( not ) acceptable. ...............................................
......................................................................................................................................................................
......................................................................................................................................................................
.............................................................................. ....................................................................
N.D.E. SUBCONTRACTOR EXAMINER SITE NON-DESTRUCTIVE EXAMINER
PREPARED BY : DATE :
APPROVED BY : DATE :
PM-I-16.PM5
PIPING HYDROTEST QC PACKAGE ROUTING SLIP No. : _________
PROJECT NAME
COMPANY NAME
ROUTING SLIP
Received by
PRIME CONTRACTOR Name QA/QC Engineer Date
Test pack Coordinator
Discrepancy Found
Description/Remarks
Ret. To Sub-Received Date Time
Ret. To Prime-Released Date Time
Name QC Engineer
PRIME CONTRACTOR QC Department
Name Weld. Pipe Insp. Date
Name NDT Weld. Engineer
Discrepancy Found
Description/Remarks
Ret. To Sub-Received Date Time
Ret. To Prime-Released Date Time
Discrepancy Found
Description/Remarks
Received Date Time
Released Date Time
Discrepancy Found
Description/Remarks
Received Date Time
Released Date Time
Customer
Engineer Date
Const. Dept.
Discrepancy Found
Description/Remarks
Return to SC/DWI Date Time
Received by
Subcontrator QC
Date
PROJECT NAME
COMPANY NAME
ROUTING SLIP
Subject :
ISOMETRIC DWG. 1. ISO. DWG COMPANY
Contract No.
CO-001
LINE NO. 2. MATERIAL CERT. SIGNAT.
REMARKS
WELDING NDT REPORTS
Ref. :
Milestone No.
PM-I-08/1
Rev.
Date
Page
PM-I-14.PM5
PROJECT NAME Page
PROJECT
Contract No. Milestone No. Rev.
CO-001
Subject : FLUSHING, BLOWING AND CHEMICAL CLEANING Ref. :
ACCEPTANCE CERTIFICATE
t L
Remark's :
Reconciliation
Handover QA
Date NDT Film Eng. Review Documentation
Hydrostatic Copy of QA/QC Managers name Name Review Including Copies
No. of Files Hydrostatic Original Control
No. Location Test Test Pack No. NDT Files send to CLIENT Completed Punchlisted Items sent to
Each Pack NDT Review Files
Completed Completed
Review NDT
Returned
Signature client
Approval
from NDT NDT Welding Engineering Name name Date
7 PH to SBS1 (Steam Line) Completed A21-W-001 to A21-W-003, A21-W- 5 Completed Completed As record OK OK OK OK OK
006, A21-W-008, A21-W-009, A21-
W-010, A19-W-001 to A19-W-008
8 Well pad WWF Completed A12-W-001, A12-W-002, A12-W-004, 1 Completed Completed As record OK OK OK OK OK
A12-W-005
9 Brine Line SS1 – WWW + Completed A17-W-001, A21-W-005, A35-W-001, 4 Completed Completed As record OK OK OK OK OK
WWF A36-W-001, A36-W-002, A41-W-001,
A44-W-002
10 Condesate Lines SBS to Completed A44-W-001, A17-W-007, A21-W-007, 4 Completed Completed As record OK OK OK OK OK
WWF A19-W-011, A19-W-014, A19-W-015,
A45-W-001, A19-W-016
11 Wellpad Area WWW Completed A13-W-001, A13-W-003, A13-W-004, 1 Completed Completed As record OK OK OK OK OK
A13-W-006
Note: All test packs to be stored in DWI Library each night under control of Ucup TBC - TEST BLOCK CORELATION S - SIGNATURES
Test Package Completion Status Log
Contract.
1212-1212
20
1212-1212
TESTING PIPING TOOL AND CONSUMABLE LIST
9 HAMMER 3 Kg 2 PCs
10 HAMMER 5 Kg 2 PCs
11 HAMMER 10 Kg 2 PCs
413838505.xls / 21
TESTING PIPING TOOL AND CONSUMABLE LIST
413838505.xls / 21
PT. REKAYASA INDUSTRI
Engineering & Construction
EQUIPMENT LIST
PIPING HYDROSTATIC TEST
413838505.xls / 22
PT. REKAYASA INDUSTRI
Engineering & Construction
HYDROSTATIC PIPING
EQUIPMENT LIST
LIMIT NO.
413838505.xls / 23
BILL OF QUANTITY MATERIAL
FOR HYDROSTATIC TEST PIPE MANIFOLD
413838505.xls / 24
COMPANY NAME
PROJECT NAME
413838505.xls / 25