S.No. Particulars Rate as per Wages fixed by No. of Working Cost of Net Total Over Head charges @ 2
SOR for Collector for Labour Hour / per Material Amount (Rs.)
2014-15 Unskilled / Semi- Required Labour Involved (Rs.)
skilled / Skilled (Rs.)
Labour for 8 hour
working per day
(Rs.)
(d) R.S.Joist (125x70 mm) 605 223 4 2 305 223 528 106
Cutting of pole by gas cutter / Dismentling, taking out of cross arm,
4 pin cross arm and insulators etc. shifting and loading in
company's Vehicle
3 Renovation of stay providing stay wire only where stay rod is found 72 223 1.50 1.50 4 63 67 13
intact
4 New stay- Pit digging, grouting, concreting & erection
(i) New stay for 33 KV line 20 mm 320 230 4 2 60.50 230 291 58
(ii) New stay for 11 KV line 16 mm 188 230 1 2 105.50 58 163 33
(a) For urban areas with concreting cement will be provided by the 189 240 1 2 107.50 60 168 34
board
(b) For rural areas with stone block 158 240 1 2 81.50 60 142 28
5 Painting of poles : cleaning of metallic surface by wire brush, 2
coats of red oxide & 1 coat of Aluminium paint on all the steel
surfaces, paint will be provided by the board & wire brush will be
provided by the contractor.
(a) Rail pole, R.S.Joist, H-Beam 183 240 1 2 102.50 60 163 33
(b) V-cross arm & Top clamp 11 KV & 33 KV 71 240 1.50 1.50 3.50 68 71 14
(c) LT 3 / 4 / 5 Pin cross arm each 38 240 1 1 6.50 30 37 7
(d) DC channel (8',5',4', SPC) for 33 KV & 11 KV 64 240 1.50 1 16 45 61 12
6 (a) Numbering of poles:- Preparing base by black paint at the height 35 240 1 1 4.50 30 35 7
of 05 feet from ground level for writing pole number with white
paint of size 4" including cost of paint and labour charges.
(b) Obtaining G.I.S. co-ordinates per pole (latitude & longitude) for 5.00 per 5.00 per
works to be executed in R-APDRP town areas. location/ location/
pole pole
(a) 33 KV 34 223 1 1 1 28 29 6
(b) 11 KV 20 223 1 0.63 0 18 18 4
15 Restringing of line conductor for 33/11 KV line work includes
opening of binding of conductors from the insulators taking out of
conductors from the Disc & retensioning the conductor & rewinding
of it as the insulator (ACSR / AAAC Conductor) rates are taken per
Km per phase
(a) Raccoon & Dog conductor per Km / conductor 1019 223 7 3 282 585 867 173
(b) Rabbit conductor 759 223 6 2 308.50 335 643 129
(c) Weasel 630 223 4 2 309 223 532 106
(d) Squirrel 500 223 4 1 309 112 421 84
16 Replacement / AUGUMENTATION of line conductor (for 33/11 KV)
The work includes opening the binding of insulators of the
sections, dismentling old conductors & coiling the conductor
properly. laying out New conductor & tensioning it on the line with
proper sag & binding of the conductor with insulator (ACSR &
AAC) 1.5 times of standard rate.
(a) Raccoon & Dog conductor per Km / conductor 2818 223 10 7 458 1951 2409 482
2 Renovation of yard levelling and metalling with cleaning, scraning 1564.80 223 8 6 110 1338 1448 290
labour charges
243
364
452
381
218
242
700
634
80
349
196
201
170
195
85
44
73
41
230
292
354
367
391
515
65
37
22
22
116
90
55 *
27
0
126
120
84
60
220
35
21 *
1041
772
638
505
2891
2248
1829
1643
257
145
84
280
200
281
208
258
694
824
469
638
1183
699
291
107 *
202
22
61
69 *
124
329
473
410
315
123
81
164
50
101
42 *
23
238
705
171
274
3443
25
670
6057
4226
134
670
2856
1738
694
958
73
106
1209
1507
184
214
239
264
290
3115
3653
4673
5692
6731
1274
1380
1487
345
9557
531
2124
3186
1062
531
1593
531
en
½ vf/kfu;e
k ykxr
ksx fd;k