Professional Documents
Culture Documents
4 2 8(M) 1.Safety goggle has to be worn at all time when Yes 2 2 4(L) Engineer / Supervisor
S-Eyes contact with foreign S-Temp. / Perm, blindness,
object doing drilling.
S-Inhalation of dust S-Chocking 4 2 8(M) 1.Dust mask has to be worn at all time Yes 2 2 4(L) Engineer / Supervisor
when doing drilling .
2. Recommend to install dust contained
equipment on drill.
4 Lifting of Duct and from E - Nil E - Nil
ground to Duct Support. H - NIL H - NIL
S- Hit by falling object S- Damage to other material, 3 4 12(M) 1. Cordon off the area under Neath. Yes 2 2 4(L) Engineer / Supervisor
fracture ,injuries,fatality 2. Safe access should be ensured.
3.Safe and stable working platform .
shall be ensured.
4. Provision of life line to anchor Safety Harness
5.No storage of material on working platform
6. Chain pulley or Scissor Lift to be used
for Heavy Duct.
7.Test certificate of chain pulley by .
competent person shall be ensured
8. Prior tool box talk to the workmen.
S-Use of electricity S-Electrocution 4 2 8(M) 1. All the power cable shall be routed through Yes 2 2 4(L) Engineer / Supervisor
30mA RCCB.
2.Inspection of Motorized Chain pulley .
/ Scissor Lift prior to use.
3.No cable joints with out cable connector.
5 <Frequent> - Common or repeating occurrences 5 <Catastrophic> - Multiple fatality; > 20 - 25 Very High NOT Acceptable / Stop
Work